00-624CITY OF ST. PAUL
FINAL ORDER 0 R i G I N A L
00 -���{
COUNCIL FTLE NO _ /� [�
60
By
File o._SO 7-50011
Vot� g Ward 1,2,3 & 4
Ia the Matter of sidevralk raconstruction at the following locations:
500107 - North Side Milton Street from Selby Avenue to Dayton Avenue.
500108 - Both sides Fulton Street from Palace Avenue to Jefferson Avenue & South Side
Jefferson Avenue from Fulton Street to West to alley.
S00109 - North Side Tuscarora Avenue from Bay Street to South Osceola Avenue at
721 & 729 Tuscarora Avenue Only.
500110 - Both Sides Tuscarora Avenue from West Seventh Street to Bay Street.
500111 - South Side Bayard Avenue from Mount Curve Boulevard to 5outh Cretin Avenue.
500112 - Both sides South Cretin Avenue from Scheffer Avenue to Hartford Avenue.
500113 - Both sides Saunders Avenue South Fairview Avenue to Davern Street.
500114 - Both sides Sumner Street from Norfolk Avenue to Sheridan Avenue & South
Side Sheridan Avenue from Sumner Street to South Prior Avenue.
500115 - Both Sides Carter Avenue from Keston Street to Como Avenue.
S00116 - West Side North Cleveland Avenue from Hendon Avenue to Dudley Avenue & South
Side Dudley Avenue from North Cleveland Avenue to West to alley.
ORIGINAL
*ESTIMATED CONSTRUCTION RATES
�_«�
RESIDENTIAL RATES (One, two or three family structures)
Recoastruction (replacement of old sidewalk) -$9.65 per front foot for a five (5)
foot wide walk and $11.58 per front foot for a six (6) foot wide
walk. Al1 other widths will be prorated accordingly. New construction
(where no walk existed) - 100$ of the actual cost estimated to be
approximately $4.32 per square foot.
All corner residential properties will receive a creclit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MIILTI-RESIDENTIAL (More than three family structures), NON RESIDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $5.84 per square foot.
under Preliminary
The Council of the City of Saint Paul has conducted a public hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSONS
Yeas Nays
t�hx,.1 -Benanav
v�lakey
✓�ostrom
�G`o l eman
,iffarri s
�antry
vE�iter
Adopted by Council: Date a pop
Certified Passed by Council Secretary
� In Favor By `� a• 1� ._��.�—...—_
c'�Against �
, Mayor
K�bs<-..�
�
� �
�
: Works - Sidewalk Division
;T PEqSON & PHONE
Tvedt (266-608�
(CLIP
/�� 2�� ZODfl
�DATE INITIATED
�
R�� 5��o/E� oo _ ��.
�HEET NO. 102758
I DEPARTMENT DIRECiOR
FOR I�l �m ATTORNEY
I� BUDGEf DIRECTOR
O MAYOR (OR AS$ISTANT)
SIGNAlVF� I �ASSOGATE
iNmawn�
❑ CtN CAUNCIL
❑ cm c�rsK
❑ FlN. & MGT. SERVICES DIR.
❑1 Council Research
I I DEPC ACCOUMAI
Wdh Integral Curb, Reconstruct Sidewalk & Reconstruct Existing Sidewalk & Construct New Sidewalk in Wards 1, 2,
F1t�E�5 ���5001�7- SDD)1�
COMMENDAitONS: Hpprove (A) or Rejec[ (R)
PLlWNINGCOMMISSION GVILSERNCECAMMISSION
_CIBCOMMfTTEE _
4 STAFF _
_DISTRICTCOUNCIL _
�PPORTS WIiICH CqUNCILOBJECTIVE?
PERSONAL SERVICE CONTRACTS MUST ANSWER THE FOLLOWING QUES710NS:
7. Has ihis person/firtn ever worked under a contrac[ for this department?
YES NO
2. Has ihis person/fimi ever been a city employee?
YES NO
3. Dces ihis persoNfirtn possess a skill not nofmaly possessed by any current city employee?
YES NO
Explain alt yes answers on separate sheet and attach to green sheet
(WHO, WHAT, WHEN, WHERE,
The problem "defective sidewalk" was caused by multiple problems, tree roots, poor subgrade materials, free/thaw cycles,
service life limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide basis and
must be addressed and corrected annually. Left uncorrected, the sidewalk condition would worsen to a state where it
would be unusable and subject to increased pedestrian injuries from falls and possible litigations.
The community will benefit from this project because it will provide safe defect free sidewaiks for its citizens. The sidewalk
contracts are done by private contractors generating pubiic sector jobs as a result.
IFAPPROVED:
Historically, the sidewalk reconstruction has created negative feedback because of construction procedures and
assessments. Property owners question the assessments, despite the fact that up to one-half the assessment is City
subsidized. Having to assess tor walk reconstruction remains a controversial issue.
IF NOT
This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personal injury
suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as well as claim ayouts.
Cot� Res�ar�h Cent�r
MAY 3 6 2000
SOUHCE
,NSACTION $ 7� � oOL � Lo
00-M-�67] A, PIA 00 = 20,040
J(PLqIN) , = x
C, CIB 0� = 50,000
COST/REVENUE BUDGE7ED (CIRCLE ONE) YES NO
ACfTVRYNUMeER C00-2T753-0784-00000 �
a o -c�y
SUMMARY OF ENGINEERING RECOMNIENDATION
`11F�Si1
PRO.TECT: RECONSTRUCT SIDEWALK WITH INTEGRAL CURB N.S. MII,TON ST.
from Selby Ave. to Dayton Ave.
5 �0� IATITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of four (4) complaints, a petition with one (1) signer, and an inspection of
the walk.
EXISTING CONDITIONS: This walk is poured concrete with asphalt patches, settled and
cracked panels.
�-�y
SUMMARY OF ENGINEERING RECOMII�NDATiONS
Ward 2
PRO.TECT: RECONSTRUCT SIDEWALK B.S. FLJLTON ST. from Palace Ave. to
Jefferson Ave. & S.S. JEFFERSON AVE. from Fulton St. to W, to Alley.
��I � INITTATING ACTION: This order was initiated by the Directoz of Public Works as public
necessity on the basis of seven (7) complaints and an inspection of the walk.
�� �,
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
settled, uneven, and cracked panels.
PRO.TECT: RECONSTRUCT SIDEWALK N.S. TUSCARORA AVE. from Bay St. to S.
Osceola Ave. at 721 & 729 Tuscarora Ave. Only.
IIVITIATING ACTION: This order was initiated by the Director of Public Works as pubiic
necessity on the basis of an inspection of the walk.
This walk is poured concrete with tree heaves.
, � 1 ��
PROJECT: RECONSTRUCT SIDEWALK B.S. TUSCARORA AVE. from W. Seventh St.
to Bay St.
IIVITIATING ACTION: This order was initiated by the D'uector of Public Works as public
necessity on the basis of seven (7) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
.........................................................................................................
00 - ��.y
SUMMARY OF ENGINEERING RECONIl�fENDATTONS
Wazd 3
PROJECT: RECONSTRUCT EXISTING SIDEWALK & CONSTRUCT NEW
SIDEWALK 3.S. BAYARD AVE. from Mt. Curve Bivd. to S. CreUn Ave.
���� I INITIATING ACTION: This order was inivated by the Director of Public Works as public
necessiry on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
scaled, and cracked panels.
PROJECT: RECONSTRUCT SIDEWALK B.S. S. CRETIN AVE. from Scheffer Ave. to
Hartford Ave.
tj ��`'L INITIATING ACTION: This order was inivated by the Director of Public Works as public
�� necessity on the basis of a petition with one (1) signer and an inspection of the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, setfled, cracked, and uneven panels.
PROJECT: RECONSTRUCT SIDEWALK B.S. SAUNDERS AVE. from S. Fairview Ave.
to Davern St.
��' � INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of eight (8) complaints, a petition with one (1) signer, and an inspection of
the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
scaled, settled, cracked, and uneven panels.
��I��
PRO.TECT: RECONSTRUCT SIDEWALK B.S. SUMNER ST. from Norfolk Ave. to
Sheridan Ave. & S.S. SHERIDAN AVE. from Sumner St. to S. Prior Ave.
IriITIATING ACTION: This order was iniUated by the Director of Public Works as public
necessity on the basis of eleven (11) complaints and an inspection of the walk.
bo-�ay
-2-
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, setfled, cracked, and uneven panels.
00 -t1y
SUMMAR'Y OF ENGINEERING RECOMNIENDATIONS
Wazd 4
PRO.TECT: RECONSTRUCT SIDEWALK B.S. CARTER AVE. from Keston St. to Como
Ave.
5 0 0�'� INITTATING ACTION: This order was initiated by the D'uector of Public Works as public
necessity on the basis of two (2) complaints, a petition with one (1) signer, and an inspection of
the walk.
EXISITNG CONDITIONS: This wallc is old tile and poured concrete with tree heaves, broken
tile, holes in tile, asphalt patches, scaled, settled, and cracked panels.
................................................................................................
PROJECT: RECONSTRUCT SIDEWALK W.S. N. CLEVELAND AVE. from Hendon
Ave. to Dudley Ave. & S.S. DUDLEY AVE. from N. Cleveland Ave. to W. to Alley.
�t/l/) I� INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
scaled, settled, uneven, and cracked panels.
00 -6ay
C2TY OF ST. PAUL
ORDER
ORIGINAL
COUNCIL FILE NO. �O' S3�
By
File S00 7 - 5001
Voting Ward 1,2,3 & 4
: i•�
In the Matter of sidewalk reconstruction, recoastruction with integral curb and/or
new construction at the £ollowing locations:
500107 - North side Milton Street from Selby Avenue to Dayton Avenue.
500108 - Both sides Fulton Street from Palace Avenue to Jefferson Avenue & South Side
Jeffersor. Avenue from Fulton Street to West to alley.
500109 - North side Tuscarora Avenue from Bay Street to South Osceola Avenue at
721 & 729 Tiscarora Avenue Only.
500110 - Both sides Tuscarora Avenue from West Seventh Street to Bay Street.
500111 - South Side Bayard Avenue from Mount Curve Boulevard to South Cretin Avenue.
500112 - Both sides South Cretin Avenue £rom Scheffer Avenue to Hartford Avenue.
500113 - Both Sides Saunders Avenue from South Fairview Avenue to Davern Street.
500114 - Both sides Sumner Street from Norfolk Avenue to Sheridan Avenue & South Side
Sheridan Avenue from Sumner Street to South Prior Avenue.
SOQ115 - Both sides Carter Avenue from Keston Street to Como Avenue.
500116 - West Side North Cleveland Avenue from Hendon Avenue to Dudley Avenue & South '
Side Dudley Avenue from North Cleveland Avenue to West to alley.
ao -c,�,y
ORIGINAL
*ESTIMATED CONSTRUCTION RATES
00 . 33p'
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$9.65 per front foot for a
five (5) foot wide walk and $11.58 per front foot for a six (6) foot wide
walk. Al1 other widths will be prorated accordingly. Naw construction
(where no walk existed) - 1000 of the actual cost estimated to be
approximately $4.32 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 100� of actual cost estimated to be
approximately $5.84 per square foot.
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1. That the said report and the same is hereby approved with no alternatives, �
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 2000 Public Improvement Aid.
�a
[C3
That a public hearing be had on said improvement on the 28 dav of June, 2000
5:30 o'clock P.M. in the Council Chambers of the City Hall and Court House
Building in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the imprbvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas � Nays
vBenanav
(�1�s� ,.��' Blakey
�ostrom
� 1 eman
vYfarris
�I.�antry
vR'�i t er
� In Favor
O Against
! A-bsP ��
Adopted by Council: Date �i.._., rl 2
\J �—
Certified Passed by Council Secretary
By ���c- ��
Mayor
CITY OF ST. PAUL
FINAL ORDER 0 R i G I N A L
00 -���{
COUNCIL FTLE NO _ /� [�
60
By
File o._SO 7-50011
Vot� g Ward 1,2,3 & 4
Ia the Matter of sidevralk raconstruction at the following locations:
500107 - North Side Milton Street from Selby Avenue to Dayton Avenue.
500108 - Both sides Fulton Street from Palace Avenue to Jefferson Avenue & South Side
Jefferson Avenue from Fulton Street to West to alley.
S00109 - North Side Tuscarora Avenue from Bay Street to South Osceola Avenue at
721 & 729 Tuscarora Avenue Only.
500110 - Both Sides Tuscarora Avenue from West Seventh Street to Bay Street.
500111 - South Side Bayard Avenue from Mount Curve Boulevard to 5outh Cretin Avenue.
500112 - Both sides South Cretin Avenue from Scheffer Avenue to Hartford Avenue.
500113 - Both sides Saunders Avenue South Fairview Avenue to Davern Street.
500114 - Both sides Sumner Street from Norfolk Avenue to Sheridan Avenue & South
Side Sheridan Avenue from Sumner Street to South Prior Avenue.
500115 - Both Sides Carter Avenue from Keston Street to Como Avenue.
S00116 - West Side North Cleveland Avenue from Hendon Avenue to Dudley Avenue & South
Side Dudley Avenue from North Cleveland Avenue to West to alley.
ORIGINAL
*ESTIMATED CONSTRUCTION RATES
�_«�
RESIDENTIAL RATES (One, two or three family structures)
Recoastruction (replacement of old sidewalk) -$9.65 per front foot for a five (5)
foot wide walk and $11.58 per front foot for a six (6) foot wide
walk. Al1 other widths will be prorated accordingly. New construction
(where no walk existed) - 100$ of the actual cost estimated to be
approximately $4.32 per square foot.
All corner residential properties will receive a creclit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MIILTI-RESIDENTIAL (More than three family structures), NON RESIDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $5.84 per square foot.
under Preliminary
The Council of the City of Saint Paul has conducted a public hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSONS
Yeas Nays
t�hx,.1 -Benanav
v�lakey
✓�ostrom
�G`o l eman
,iffarri s
�antry
vE�iter
Adopted by Council: Date a pop
Certified Passed by Council Secretary
� In Favor By `� a• 1� ._��.�—...—_
c'�Against �
, Mayor
K�bs<-..�
�
� �
�
: Works - Sidewalk Division
;T PEqSON & PHONE
Tvedt (266-608�
(CLIP
/�� 2�� ZODfl
�DATE INITIATED
�
R�� 5��o/E� oo _ ��.
�HEET NO. 102758
I DEPARTMENT DIRECiOR
FOR I�l �m ATTORNEY
I� BUDGEf DIRECTOR
O MAYOR (OR AS$ISTANT)
SIGNAlVF� I �ASSOGATE
iNmawn�
❑ CtN CAUNCIL
❑ cm c�rsK
❑ FlN. & MGT. SERVICES DIR.
❑1 Council Research
I I DEPC ACCOUMAI
Wdh Integral Curb, Reconstruct Sidewalk & Reconstruct Existing Sidewalk & Construct New Sidewalk in Wards 1, 2,
F1t�E�5 ���5001�7- SDD)1�
COMMENDAitONS: Hpprove (A) or Rejec[ (R)
PLlWNINGCOMMISSION GVILSERNCECAMMISSION
_CIBCOMMfTTEE _
4 STAFF _
_DISTRICTCOUNCIL _
�PPORTS WIiICH CqUNCILOBJECTIVE?
PERSONAL SERVICE CONTRACTS MUST ANSWER THE FOLLOWING QUES710NS:
7. Has ihis person/firtn ever worked under a contrac[ for this department?
YES NO
2. Has ihis person/fimi ever been a city employee?
YES NO
3. Dces ihis persoNfirtn possess a skill not nofmaly possessed by any current city employee?
YES NO
Explain alt yes answers on separate sheet and attach to green sheet
(WHO, WHAT, WHEN, WHERE,
The problem "defective sidewalk" was caused by multiple problems, tree roots, poor subgrade materials, free/thaw cycles,
service life limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide basis and
must be addressed and corrected annually. Left uncorrected, the sidewalk condition would worsen to a state where it
would be unusable and subject to increased pedestrian injuries from falls and possible litigations.
The community will benefit from this project because it will provide safe defect free sidewaiks for its citizens. The sidewalk
contracts are done by private contractors generating pubiic sector jobs as a result.
IFAPPROVED:
Historically, the sidewalk reconstruction has created negative feedback because of construction procedures and
assessments. Property owners question the assessments, despite the fact that up to one-half the assessment is City
subsidized. Having to assess tor walk reconstruction remains a controversial issue.
IF NOT
This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personal injury
suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as well as claim ayouts.
Cot� Res�ar�h Cent�r
MAY 3 6 2000
SOUHCE
,NSACTION $ 7� � oOL � Lo
00-M-�67] A, PIA 00 = 20,040
J(PLqIN) , = x
C, CIB 0� = 50,000
COST/REVENUE BUDGE7ED (CIRCLE ONE) YES NO
ACfTVRYNUMeER C00-2T753-0784-00000 �
a o -c�y
SUMMARY OF ENGINEERING RECOMNIENDATION
`11F�Si1
PRO.TECT: RECONSTRUCT SIDEWALK WITH INTEGRAL CURB N.S. MII,TON ST.
from Selby Ave. to Dayton Ave.
5 �0� IATITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of four (4) complaints, a petition with one (1) signer, and an inspection of
the walk.
EXISTING CONDITIONS: This walk is poured concrete with asphalt patches, settled and
cracked panels.
�-�y
SUMMARY OF ENGINEERING RECOMII�NDATiONS
Ward 2
PRO.TECT: RECONSTRUCT SIDEWALK B.S. FLJLTON ST. from Palace Ave. to
Jefferson Ave. & S.S. JEFFERSON AVE. from Fulton St. to W, to Alley.
��I � INITTATING ACTION: This order was initiated by the Directoz of Public Works as public
necessity on the basis of seven (7) complaints and an inspection of the walk.
�� �,
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
settled, uneven, and cracked panels.
PRO.TECT: RECONSTRUCT SIDEWALK N.S. TUSCARORA AVE. from Bay St. to S.
Osceola Ave. at 721 & 729 Tuscarora Ave. Only.
IIVITIATING ACTION: This order was initiated by the Director of Public Works as pubiic
necessity on the basis of an inspection of the walk.
This walk is poured concrete with tree heaves.
, � 1 ��
PROJECT: RECONSTRUCT SIDEWALK B.S. TUSCARORA AVE. from W. Seventh St.
to Bay St.
IIVITIATING ACTION: This order was initiated by the D'uector of Public Works as public
necessity on the basis of seven (7) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
.........................................................................................................
00 - ��.y
SUMMARY OF ENGINEERING RECONIl�fENDATTONS
Wazd 3
PROJECT: RECONSTRUCT EXISTING SIDEWALK & CONSTRUCT NEW
SIDEWALK 3.S. BAYARD AVE. from Mt. Curve Bivd. to S. CreUn Ave.
���� I INITIATING ACTION: This order was inivated by the Director of Public Works as public
necessiry on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
scaled, and cracked panels.
PROJECT: RECONSTRUCT SIDEWALK B.S. S. CRETIN AVE. from Scheffer Ave. to
Hartford Ave.
tj ��`'L INITIATING ACTION: This order was inivated by the Director of Public Works as public
�� necessity on the basis of a petition with one (1) signer and an inspection of the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, setfled, cracked, and uneven panels.
PROJECT: RECONSTRUCT SIDEWALK B.S. SAUNDERS AVE. from S. Fairview Ave.
to Davern St.
��' � INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of eight (8) complaints, a petition with one (1) signer, and an inspection of
the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
scaled, settled, cracked, and uneven panels.
��I��
PRO.TECT: RECONSTRUCT SIDEWALK B.S. SUMNER ST. from Norfolk Ave. to
Sheridan Ave. & S.S. SHERIDAN AVE. from Sumner St. to S. Prior Ave.
IriITIATING ACTION: This order was iniUated by the Director of Public Works as public
necessity on the basis of eleven (11) complaints and an inspection of the walk.
bo-�ay
-2-
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, setfled, cracked, and uneven panels.
00 -t1y
SUMMAR'Y OF ENGINEERING RECOMNIENDATIONS
Wazd 4
PRO.TECT: RECONSTRUCT SIDEWALK B.S. CARTER AVE. from Keston St. to Como
Ave.
5 0 0�'� INITTATING ACTION: This order was initiated by the D'uector of Public Works as public
necessity on the basis of two (2) complaints, a petition with one (1) signer, and an inspection of
the walk.
EXISITNG CONDITIONS: This wallc is old tile and poured concrete with tree heaves, broken
tile, holes in tile, asphalt patches, scaled, settled, and cracked panels.
................................................................................................
PROJECT: RECONSTRUCT SIDEWALK W.S. N. CLEVELAND AVE. from Hendon
Ave. to Dudley Ave. & S.S. DUDLEY AVE. from N. Cleveland Ave. to W. to Alley.
�t/l/) I� INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
scaled, settled, uneven, and cracked panels.
00 -6ay
C2TY OF ST. PAUL
ORDER
ORIGINAL
COUNCIL FILE NO. �O' S3�
By
File S00 7 - 5001
Voting Ward 1,2,3 & 4
: i•�
In the Matter of sidewalk reconstruction, recoastruction with integral curb and/or
new construction at the £ollowing locations:
500107 - North side Milton Street from Selby Avenue to Dayton Avenue.
500108 - Both sides Fulton Street from Palace Avenue to Jefferson Avenue & South Side
Jeffersor. Avenue from Fulton Street to West to alley.
500109 - North side Tuscarora Avenue from Bay Street to South Osceola Avenue at
721 & 729 Tiscarora Avenue Only.
500110 - Both sides Tuscarora Avenue from West Seventh Street to Bay Street.
500111 - South Side Bayard Avenue from Mount Curve Boulevard to South Cretin Avenue.
500112 - Both sides South Cretin Avenue £rom Scheffer Avenue to Hartford Avenue.
500113 - Both Sides Saunders Avenue from South Fairview Avenue to Davern Street.
500114 - Both sides Sumner Street from Norfolk Avenue to Sheridan Avenue & South Side
Sheridan Avenue from Sumner Street to South Prior Avenue.
SOQ115 - Both sides Carter Avenue from Keston Street to Como Avenue.
500116 - West Side North Cleveland Avenue from Hendon Avenue to Dudley Avenue & South '
Side Dudley Avenue from North Cleveland Avenue to West to alley.
ao -c,�,y
ORIGINAL
*ESTIMATED CONSTRUCTION RATES
00 . 33p'
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$9.65 per front foot for a
five (5) foot wide walk and $11.58 per front foot for a six (6) foot wide
walk. Al1 other widths will be prorated accordingly. Naw construction
(where no walk existed) - 1000 of the actual cost estimated to be
approximately $4.32 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 100� of actual cost estimated to be
approximately $5.84 per square foot.
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1. That the said report and the same is hereby approved with no alternatives, �
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 2000 Public Improvement Aid.
�a
[C3
That a public hearing be had on said improvement on the 28 dav of June, 2000
5:30 o'clock P.M. in the Council Chambers of the City Hall and Court House
Building in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the imprbvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas � Nays
vBenanav
(�1�s� ,.��' Blakey
�ostrom
� 1 eman
vYfarris
�I.�antry
vR'�i t er
� In Favor
O Against
! A-bsP ��
Adopted by Council: Date �i.._., rl 2
\J �—
Certified Passed by Council Secretary
By ���c- ��
Mayor
CITY OF ST. PAUL
FINAL ORDER 0 R i G I N A L
00 -���{
COUNCIL FTLE NO _ /� [�
60
By
File o._SO 7-50011
Vot� g Ward 1,2,3 & 4
Ia the Matter of sidevralk raconstruction at the following locations:
500107 - North Side Milton Street from Selby Avenue to Dayton Avenue.
500108 - Both sides Fulton Street from Palace Avenue to Jefferson Avenue & South Side
Jefferson Avenue from Fulton Street to West to alley.
S00109 - North Side Tuscarora Avenue from Bay Street to South Osceola Avenue at
721 & 729 Tuscarora Avenue Only.
500110 - Both Sides Tuscarora Avenue from West Seventh Street to Bay Street.
500111 - South Side Bayard Avenue from Mount Curve Boulevard to 5outh Cretin Avenue.
500112 - Both sides South Cretin Avenue from Scheffer Avenue to Hartford Avenue.
500113 - Both sides Saunders Avenue South Fairview Avenue to Davern Street.
500114 - Both sides Sumner Street from Norfolk Avenue to Sheridan Avenue & South
Side Sheridan Avenue from Sumner Street to South Prior Avenue.
500115 - Both Sides Carter Avenue from Keston Street to Como Avenue.
S00116 - West Side North Cleveland Avenue from Hendon Avenue to Dudley Avenue & South
Side Dudley Avenue from North Cleveland Avenue to West to alley.
ORIGINAL
*ESTIMATED CONSTRUCTION RATES
�_«�
RESIDENTIAL RATES (One, two or three family structures)
Recoastruction (replacement of old sidewalk) -$9.65 per front foot for a five (5)
foot wide walk and $11.58 per front foot for a six (6) foot wide
walk. Al1 other widths will be prorated accordingly. New construction
(where no walk existed) - 100$ of the actual cost estimated to be
approximately $4.32 per square foot.
All corner residential properties will receive a creclit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MIILTI-RESIDENTIAL (More than three family structures), NON RESIDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $5.84 per square foot.
under Preliminary
The Council of the City of Saint Paul has conducted a public hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSONS
Yeas Nays
t�hx,.1 -Benanav
v�lakey
✓�ostrom
�G`o l eman
,iffarri s
�antry
vE�iter
Adopted by Council: Date a pop
Certified Passed by Council Secretary
� In Favor By `� a• 1� ._��.�—...—_
c'�Against �
, Mayor
K�bs<-..�
�
� �
�
: Works - Sidewalk Division
;T PEqSON & PHONE
Tvedt (266-608�
(CLIP
/�� 2�� ZODfl
�DATE INITIATED
�
R�� 5��o/E� oo _ ��.
�HEET NO. 102758
I DEPARTMENT DIRECiOR
FOR I�l �m ATTORNEY
I� BUDGEf DIRECTOR
O MAYOR (OR AS$ISTANT)
SIGNAlVF� I �ASSOGATE
iNmawn�
❑ CtN CAUNCIL
❑ cm c�rsK
❑ FlN. & MGT. SERVICES DIR.
❑1 Council Research
I I DEPC ACCOUMAI
Wdh Integral Curb, Reconstruct Sidewalk & Reconstruct Existing Sidewalk & Construct New Sidewalk in Wards 1, 2,
F1t�E�5 ���5001�7- SDD)1�
COMMENDAitONS: Hpprove (A) or Rejec[ (R)
PLlWNINGCOMMISSION GVILSERNCECAMMISSION
_CIBCOMMfTTEE _
4 STAFF _
_DISTRICTCOUNCIL _
�PPORTS WIiICH CqUNCILOBJECTIVE?
PERSONAL SERVICE CONTRACTS MUST ANSWER THE FOLLOWING QUES710NS:
7. Has ihis person/firtn ever worked under a contrac[ for this department?
YES NO
2. Has ihis person/fimi ever been a city employee?
YES NO
3. Dces ihis persoNfirtn possess a skill not nofmaly possessed by any current city employee?
YES NO
Explain alt yes answers on separate sheet and attach to green sheet
(WHO, WHAT, WHEN, WHERE,
The problem "defective sidewalk" was caused by multiple problems, tree roots, poor subgrade materials, free/thaw cycles,
service life limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide basis and
must be addressed and corrected annually. Left uncorrected, the sidewalk condition would worsen to a state where it
would be unusable and subject to increased pedestrian injuries from falls and possible litigations.
The community will benefit from this project because it will provide safe defect free sidewaiks for its citizens. The sidewalk
contracts are done by private contractors generating pubiic sector jobs as a result.
IFAPPROVED:
Historically, the sidewalk reconstruction has created negative feedback because of construction procedures and
assessments. Property owners question the assessments, despite the fact that up to one-half the assessment is City
subsidized. Having to assess tor walk reconstruction remains a controversial issue.
IF NOT
This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personal injury
suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as well as claim ayouts.
Cot� Res�ar�h Cent�r
MAY 3 6 2000
SOUHCE
,NSACTION $ 7� � oOL � Lo
00-M-�67] A, PIA 00 = 20,040
J(PLqIN) , = x
C, CIB 0� = 50,000
COST/REVENUE BUDGE7ED (CIRCLE ONE) YES NO
ACfTVRYNUMeER C00-2T753-0784-00000 �
a o -c�y
SUMMARY OF ENGINEERING RECOMNIENDATION
`11F�Si1
PRO.TECT: RECONSTRUCT SIDEWALK WITH INTEGRAL CURB N.S. MII,TON ST.
from Selby Ave. to Dayton Ave.
5 �0� IATITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of four (4) complaints, a petition with one (1) signer, and an inspection of
the walk.
EXISTING CONDITIONS: This walk is poured concrete with asphalt patches, settled and
cracked panels.
�-�y
SUMMARY OF ENGINEERING RECOMII�NDATiONS
Ward 2
PRO.TECT: RECONSTRUCT SIDEWALK B.S. FLJLTON ST. from Palace Ave. to
Jefferson Ave. & S.S. JEFFERSON AVE. from Fulton St. to W, to Alley.
��I � INITTATING ACTION: This order was initiated by the Directoz of Public Works as public
necessity on the basis of seven (7) complaints and an inspection of the walk.
�� �,
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
settled, uneven, and cracked panels.
PRO.TECT: RECONSTRUCT SIDEWALK N.S. TUSCARORA AVE. from Bay St. to S.
Osceola Ave. at 721 & 729 Tuscarora Ave. Only.
IIVITIATING ACTION: This order was initiated by the Director of Public Works as pubiic
necessity on the basis of an inspection of the walk.
This walk is poured concrete with tree heaves.
, � 1 ��
PROJECT: RECONSTRUCT SIDEWALK B.S. TUSCARORA AVE. from W. Seventh St.
to Bay St.
IIVITIATING ACTION: This order was initiated by the D'uector of Public Works as public
necessity on the basis of seven (7) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
.........................................................................................................
00 - ��.y
SUMMARY OF ENGINEERING RECONIl�fENDATTONS
Wazd 3
PROJECT: RECONSTRUCT EXISTING SIDEWALK & CONSTRUCT NEW
SIDEWALK 3.S. BAYARD AVE. from Mt. Curve Bivd. to S. CreUn Ave.
���� I INITIATING ACTION: This order was inivated by the Director of Public Works as public
necessiry on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
scaled, and cracked panels.
PROJECT: RECONSTRUCT SIDEWALK B.S. S. CRETIN AVE. from Scheffer Ave. to
Hartford Ave.
tj ��`'L INITIATING ACTION: This order was inivated by the Director of Public Works as public
�� necessity on the basis of a petition with one (1) signer and an inspection of the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, setfled, cracked, and uneven panels.
PROJECT: RECONSTRUCT SIDEWALK B.S. SAUNDERS AVE. from S. Fairview Ave.
to Davern St.
��' � INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of eight (8) complaints, a petition with one (1) signer, and an inspection of
the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
scaled, settled, cracked, and uneven panels.
��I��
PRO.TECT: RECONSTRUCT SIDEWALK B.S. SUMNER ST. from Norfolk Ave. to
Sheridan Ave. & S.S. SHERIDAN AVE. from Sumner St. to S. Prior Ave.
IriITIATING ACTION: This order was iniUated by the Director of Public Works as public
necessity on the basis of eleven (11) complaints and an inspection of the walk.
bo-�ay
-2-
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, setfled, cracked, and uneven panels.
00 -t1y
SUMMAR'Y OF ENGINEERING RECOMNIENDATIONS
Wazd 4
PRO.TECT: RECONSTRUCT SIDEWALK B.S. CARTER AVE. from Keston St. to Como
Ave.
5 0 0�'� INITTATING ACTION: This order was initiated by the D'uector of Public Works as public
necessity on the basis of two (2) complaints, a petition with one (1) signer, and an inspection of
the walk.
EXISITNG CONDITIONS: This wallc is old tile and poured concrete with tree heaves, broken
tile, holes in tile, asphalt patches, scaled, settled, and cracked panels.
................................................................................................
PROJECT: RECONSTRUCT SIDEWALK W.S. N. CLEVELAND AVE. from Hendon
Ave. to Dudley Ave. & S.S. DUDLEY AVE. from N. Cleveland Ave. to W. to Alley.
�t/l/) I� INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
scaled, settled, uneven, and cracked panels.
00 -6ay
C2TY OF ST. PAUL
ORDER
ORIGINAL
COUNCIL FILE NO. �O' S3�
By
File S00 7 - 5001
Voting Ward 1,2,3 & 4
: i•�
In the Matter of sidewalk reconstruction, recoastruction with integral curb and/or
new construction at the £ollowing locations:
500107 - North side Milton Street from Selby Avenue to Dayton Avenue.
500108 - Both sides Fulton Street from Palace Avenue to Jefferson Avenue & South Side
Jeffersor. Avenue from Fulton Street to West to alley.
500109 - North side Tuscarora Avenue from Bay Street to South Osceola Avenue at
721 & 729 Tiscarora Avenue Only.
500110 - Both sides Tuscarora Avenue from West Seventh Street to Bay Street.
500111 - South Side Bayard Avenue from Mount Curve Boulevard to South Cretin Avenue.
500112 - Both sides South Cretin Avenue £rom Scheffer Avenue to Hartford Avenue.
500113 - Both Sides Saunders Avenue from South Fairview Avenue to Davern Street.
500114 - Both sides Sumner Street from Norfolk Avenue to Sheridan Avenue & South Side
Sheridan Avenue from Sumner Street to South Prior Avenue.
SOQ115 - Both sides Carter Avenue from Keston Street to Como Avenue.
500116 - West Side North Cleveland Avenue from Hendon Avenue to Dudley Avenue & South '
Side Dudley Avenue from North Cleveland Avenue to West to alley.
ao -c,�,y
ORIGINAL
*ESTIMATED CONSTRUCTION RATES
00 . 33p'
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$9.65 per front foot for a
five (5) foot wide walk and $11.58 per front foot for a six (6) foot wide
walk. Al1 other widths will be prorated accordingly. Naw construction
(where no walk existed) - 1000 of the actual cost estimated to be
approximately $4.32 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 100� of actual cost estimated to be
approximately $5.84 per square foot.
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1. That the said report and the same is hereby approved with no alternatives, �
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 2000 Public Improvement Aid.
�a
[C3
That a public hearing be had on said improvement on the 28 dav of June, 2000
5:30 o'clock P.M. in the Council Chambers of the City Hall and Court House
Building in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the imprbvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas � Nays
vBenanav
(�1�s� ,.��' Blakey
�ostrom
� 1 eman
vYfarris
�I.�antry
vR'�i t er
� In Favor
O Against
! A-bsP ��
Adopted by Council: Date �i.._., rl 2
\J �—
Certified Passed by Council Secretary
By ���c- ��
Mayor