00-506CITY OF ST. PAIIL CO L FILE 0. �!1 dd J
�� -�
FINAL ORDER 0 R{ G I N A L File 00093-500 5
Voti rd 4 & 5
In the Matter of sidewalk racoastructioa at the following locatioas:
500093 - Both sides Dewey Street £rom Laurel Avenue to Selby Avenue.
500094 - North Side Laurel Street from North Howell Street to Dewey Street.
500095 - North side West Jessamine Avenue from Galtier Street to Marion Street.
DD-sd�
ORIGIf�AL
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Recoastruction (replacement of old sidewalk) -$9.65 per front foot for a five (5)
foot wide walk and $11.58 per front foot for a six (6} foot wide
walk. All other widths will be prorated accordingly. New construction
(where no walk existed) - 100� of the actual cost estimated to be
approximately $4.32 per square £oot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL (More than three family structures), NON RESTDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $5.84 per square £oot.
under Preliminary order O C� -�l�-S approved �� 3 2
The Council of the City of Saint Paul has conducted a public hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WF3EREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, anfl the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSONS
Yeas Nays
✓ 3F�enanav
,�3 akey
� strom
Rbz<,� — Coleman
r.�i'iarri s
� ntTy
vl�eiter
6 In Favor
C) Against
� ��JSCV��
Adopted by Council: Date ���2t�_�csc�
�
Certified Passed by Council 5ecretary
� ` 1
��A� � ��i
- �� _ .
Works - Sidewatk Division
��
�l� i �I�ZI � s 6
NO.
iNmawa�
❑ cm couwa�
❑ CITY CLERK
❑ FlN. & MGT. SERVICES DIR.
Q Councii Research
I I DEPr. U
�
GREEN SHEET
irumnwn�
� OEPARTIAEM OIREC�OR
�CRV ATTOflNEY
� WDGEf DIRECTOR
� MAYOR (OR ASSISTANT)
� �ASSOCIATE
Reconstruct
� PERSONAL SERVICE CONTRACTS MUST ANSWER 7HE FOLLOWING DUESTfONS:
CIVILSERVICECOMMISSION 7_ HasthispersoNfirmeverworkedunderacrontrac[forthisdepartrnen[?
YES NO
2. Has this perso�rtn ever been a ciry employee?
YES NO
3. Does this persoMirtn possess a sldll not nortnaly possessed by any curtent city employee?
YES NO
F�cplain all yes answers on separete sheet and attach to green sheet
PROBLEM,ISSUE,
WHAT, WHEN, WHEflE, WHI�:
The problem "defective sidewalk" was caused by multiple problems, tree roots, poor subgrade materials, free/thaw cycles,
service life limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide basis and
must be addressed and corrected annually. Left uncorrected, the sidewalk condition would worsen to a state where it
would be unusable and subject to increased pedestrian injuries from talls and possible litigations.
IFAPPFOVEP
The community wil4 benefit from this project because it will provide safe defect free sidewalks for its citizens. The sidewalk
contracts are done by private contractors generating public sector jobs as a result.
DISADVANTAGES IF APPFOVED:
Historically, the sidewalk reconstruction has created negative feedback because of consiruction procedures and
assessments. Property owners question the assessments, despite the fact that up to one-haif the assessment is City
subsidized. Having to assess for walk reconstruction remains a controversial issue.
NOTAPPROVED:
This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personal injury
suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as well as claim payouts.
�;3i1G� f�e�^sL�$CC�1 ��"itBP
y ik � �A��
in Wards 4 R� 5(See attached list)
fOTAL AMOUNT OFTRANSACTION $ /���� � 7�+ COS7/REVENUE BUDGE7ED (CIRCLE ON� YES No
FUNDINGSOURCE �Q'M^� A. Pt� �� = Z yfl ACINfTYNUMBER C00-2T753-0784-0 000
FINANGALINFORMATION:(IXPIAIN) t — ! �
c, cia oo = 5a�000 �-
OdSd�
SLTMMARX OF ENGINEERING RECONIlVIENDATIONS
Ward 4
PRO.TECT: RECONSTRUCT SIDEWALK B.S. DEWEY ST. from Laurel Ave. to Seiby
Ave.
�4�`y�pZ INITIATING ACTION: This order was initiated by the Director of Public works as public
VV necessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
and uneven panels.
PRO.TECT: RECONSTRUCT SIDEWALK N.S. LAUREL AVE. from N. Howell St. to
Dewey St.
5�� IlVITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis o£ one (1) complaint, a petition with one (i) signer, and an inspection of the
walk.
EXISTING CONDITIONS: This walk is poured concrete with water pockets, disintegrated,
scaled, settled, and cracked panels.
.........................................................................................................
ov-sd�
SUMMARY OF ENGINEERING RECOMIViENDATION
C+:�S7�
PRO.TECT: RECONSTRi3CT SIDEWALK N.S. W. 3ESSAMINE AVE. from Galtier St. to
Marion St.
�(v'�G�� IlVITIATING ACTION: This order was initiated by the Director of Public Works as public
� �w � necessiry on the basis of five (5) complaints, a petition with one (1) signer, and an inspection of
the walk.
This walk is poured concrete with tree heaves, asphalt patches,
and uneven paneis.
C2TY OF ST. PAUL
ORDER
ORIGINAL
File .1<So. I �500093 - 500095
4 & 5
dD=.SO�
aa
In the Matter of sidewalk reeonstruction and/or naw construction at the following
locatioas:
500093 - Both sides Dewe� Street from Laurel Avenue to Selby Avenue.
500094 - North side Laurel Avenue from North Howell Street to Dewey Street.
500095 - North side West Jessamine Avenue from Galtier Street to Marion Street.
dd-Sd�
oR��iNa�
*ESTIMATED CONSTRUCTION RATES
DO -y?S
RESIDENTIAL RATES (One, two or three family structures)
Recoastruction (replacement of old sidewalk) -$9.65 per front foot for a
five (5) foot wide walk and $11.58 per front foot for a six (6) foot wide
walk. Al1 other widths will be prorated accordingly. New construction
(where no walk existed) - 100$ of the actual cost estimated to be
approximately $4.32 per square foot.
Al1 corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For new and reconsCructed sidewalk; 100� of actual cost estimated to be
approximately $5.84 per square foot.
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
l. That the said report and the sazne is hereby approved with no alternatives, �
that the estimated cost thereof is *SEE ABOVE for estimated Construction rates,
financed by assessments and 2000 Public Improvement Aid.
2
3
That a public hearing be had on said improvement on the 24 dav of Mav, 2000
5:30 o'clock P.M. in the Council Chambers of the City Hall and Court House
Building in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
�enanav
✓Blakey
✓�ostrom
�'o l eman
; /Karr i s
;/Laritry
�eiter
� In Favor
� Against
Adopted by Council: Date 3 c�c�0 D
�
Certified Passed by Council Secretary
$y I--�� a ��
Mayor
CITY OF ST. PAIIL CO L FILE 0. �!1 dd J
�� -�
FINAL ORDER 0 R{ G I N A L File 00093-500 5
Voti rd 4 & 5
In the Matter of sidewalk racoastructioa at the following locatioas:
500093 - Both sides Dewey Street £rom Laurel Avenue to Selby Avenue.
500094 - North Side Laurel Street from North Howell Street to Dewey Street.
500095 - North side West Jessamine Avenue from Galtier Street to Marion Street.
DD-sd�
ORIGIf�AL
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Recoastruction (replacement of old sidewalk) -$9.65 per front foot for a five (5)
foot wide walk and $11.58 per front foot for a six (6} foot wide
walk. All other widths will be prorated accordingly. New construction
(where no walk existed) - 100� of the actual cost estimated to be
approximately $4.32 per square £oot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL (More than three family structures), NON RESTDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $5.84 per square £oot.
under Preliminary order O C� -�l�-S approved �� 3 2
The Council of the City of Saint Paul has conducted a public hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WF3EREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, anfl the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSONS
Yeas Nays
✓ 3F�enanav
,�3 akey
� strom
Rbz<,� — Coleman
r.�i'iarri s
� ntTy
vl�eiter
6 In Favor
C) Against
� ��JSCV��
Adopted by Council: Date ���2t�_�csc�
�
Certified Passed by Council 5ecretary
� ` 1
��A� � ��i
- �� _ .
Works - Sidewatk Division
��
�l� i �I�ZI � s 6
NO.
iNmawa�
❑ cm couwa�
❑ CITY CLERK
❑ FlN. & MGT. SERVICES DIR.
Q Councii Research
I I DEPr. U
�
GREEN SHEET
irumnwn�
� OEPARTIAEM OIREC�OR
�CRV ATTOflNEY
� WDGEf DIRECTOR
� MAYOR (OR ASSISTANT)
� �ASSOCIATE
Reconstruct
� PERSONAL SERVICE CONTRACTS MUST ANSWER 7HE FOLLOWING DUESTfONS:
CIVILSERVICECOMMISSION 7_ HasthispersoNfirmeverworkedunderacrontrac[forthisdepartrnen[?
YES NO
2. Has this perso�rtn ever been a ciry employee?
YES NO
3. Does this persoMirtn possess a sldll not nortnaly possessed by any curtent city employee?
YES NO
F�cplain all yes answers on separete sheet and attach to green sheet
PROBLEM,ISSUE,
WHAT, WHEN, WHEflE, WHI�:
The problem "defective sidewalk" was caused by multiple problems, tree roots, poor subgrade materials, free/thaw cycles,
service life limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide basis and
must be addressed and corrected annually. Left uncorrected, the sidewalk condition would worsen to a state where it
would be unusable and subject to increased pedestrian injuries from talls and possible litigations.
IFAPPFOVEP
The community wil4 benefit from this project because it will provide safe defect free sidewalks for its citizens. The sidewalk
contracts are done by private contractors generating public sector jobs as a result.
DISADVANTAGES IF APPFOVED:
Historically, the sidewalk reconstruction has created negative feedback because of consiruction procedures and
assessments. Property owners question the assessments, despite the fact that up to one-haif the assessment is City
subsidized. Having to assess for walk reconstruction remains a controversial issue.
NOTAPPROVED:
This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personal injury
suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as well as claim payouts.
�;3i1G� f�e�^sL�$CC�1 ��"itBP
y ik � �A��
in Wards 4 R� 5(See attached list)
fOTAL AMOUNT OFTRANSACTION $ /���� � 7�+ COS7/REVENUE BUDGE7ED (CIRCLE ON� YES No
FUNDINGSOURCE �Q'M^� A. Pt� �� = Z yfl ACINfTYNUMBER C00-2T753-0784-0 000
FINANGALINFORMATION:(IXPIAIN) t — ! �
c, cia oo = 5a�000 �-
OdSd�
SLTMMARX OF ENGINEERING RECONIlVIENDATIONS
Ward 4
PRO.TECT: RECONSTRUCT SIDEWALK B.S. DEWEY ST. from Laurel Ave. to Seiby
Ave.
�4�`y�pZ INITIATING ACTION: This order was initiated by the Director of Public works as public
VV necessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
and uneven panels.
PRO.TECT: RECONSTRUCT SIDEWALK N.S. LAUREL AVE. from N. Howell St. to
Dewey St.
5�� IlVITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis o£ one (1) complaint, a petition with one (i) signer, and an inspection of the
walk.
EXISTING CONDITIONS: This walk is poured concrete with water pockets, disintegrated,
scaled, settled, and cracked panels.
.........................................................................................................
ov-sd�
SUMMARY OF ENGINEERING RECOMIViENDATION
C+:�S7�
PRO.TECT: RECONSTRi3CT SIDEWALK N.S. W. 3ESSAMINE AVE. from Galtier St. to
Marion St.
�(v'�G�� IlVITIATING ACTION: This order was initiated by the Director of Public Works as public
� �w � necessiry on the basis of five (5) complaints, a petition with one (1) signer, and an inspection of
the walk.
This walk is poured concrete with tree heaves, asphalt patches,
and uneven paneis.
C2TY OF ST. PAUL
ORDER
ORIGINAL
File .1<So. I �500093 - 500095
4 & 5
dD=.SO�
aa
In the Matter of sidewalk reeonstruction and/or naw construction at the following
locatioas:
500093 - Both sides Dewe� Street from Laurel Avenue to Selby Avenue.
500094 - North side Laurel Avenue from North Howell Street to Dewey Street.
500095 - North side West Jessamine Avenue from Galtier Street to Marion Street.
dd-Sd�
oR��iNa�
*ESTIMATED CONSTRUCTION RATES
DO -y?S
RESIDENTIAL RATES (One, two or three family structures)
Recoastruction (replacement of old sidewalk) -$9.65 per front foot for a
five (5) foot wide walk and $11.58 per front foot for a six (6) foot wide
walk. Al1 other widths will be prorated accordingly. New construction
(where no walk existed) - 100$ of the actual cost estimated to be
approximately $4.32 per square foot.
Al1 corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For new and reconsCructed sidewalk; 100� of actual cost estimated to be
approximately $5.84 per square foot.
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
l. That the said report and the sazne is hereby approved with no alternatives, �
that the estimated cost thereof is *SEE ABOVE for estimated Construction rates,
financed by assessments and 2000 Public Improvement Aid.
2
3
That a public hearing be had on said improvement on the 24 dav of Mav, 2000
5:30 o'clock P.M. in the Council Chambers of the City Hall and Court House
Building in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
�enanav
✓Blakey
✓�ostrom
�'o l eman
; /Karr i s
;/Laritry
�eiter
� In Favor
� Against
Adopted by Council: Date 3 c�c�0 D
�
Certified Passed by Council Secretary
$y I--�� a ��
Mayor
CITY OF ST. PAIIL CO L FILE 0. �!1 dd J
�� -�
FINAL ORDER 0 R{ G I N A L File 00093-500 5
Voti rd 4 & 5
In the Matter of sidewalk racoastructioa at the following locatioas:
500093 - Both sides Dewey Street £rom Laurel Avenue to Selby Avenue.
500094 - North Side Laurel Street from North Howell Street to Dewey Street.
500095 - North side West Jessamine Avenue from Galtier Street to Marion Street.
DD-sd�
ORIGIf�AL
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Recoastruction (replacement of old sidewalk) -$9.65 per front foot for a five (5)
foot wide walk and $11.58 per front foot for a six (6} foot wide
walk. All other widths will be prorated accordingly. New construction
(where no walk existed) - 100� of the actual cost estimated to be
approximately $4.32 per square £oot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL (More than three family structures), NON RESTDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $5.84 per square £oot.
under Preliminary order O C� -�l�-S approved �� 3 2
The Council of the City of Saint Paul has conducted a public hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WF3EREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, anfl the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSONS
Yeas Nays
✓ 3F�enanav
,�3 akey
� strom
Rbz<,� — Coleman
r.�i'iarri s
� ntTy
vl�eiter
6 In Favor
C) Against
� ��JSCV��
Adopted by Council: Date ���2t�_�csc�
�
Certified Passed by Council 5ecretary
� ` 1
��A� � ��i
- �� _ .
Works - Sidewatk Division
��
�l� i �I�ZI � s 6
NO.
iNmawa�
❑ cm couwa�
❑ CITY CLERK
❑ FlN. & MGT. SERVICES DIR.
Q Councii Research
I I DEPr. U
�
GREEN SHEET
irumnwn�
� OEPARTIAEM OIREC�OR
�CRV ATTOflNEY
� WDGEf DIRECTOR
� MAYOR (OR ASSISTANT)
� �ASSOCIATE
Reconstruct
� PERSONAL SERVICE CONTRACTS MUST ANSWER 7HE FOLLOWING DUESTfONS:
CIVILSERVICECOMMISSION 7_ HasthispersoNfirmeverworkedunderacrontrac[forthisdepartrnen[?
YES NO
2. Has this perso�rtn ever been a ciry employee?
YES NO
3. Does this persoMirtn possess a sldll not nortnaly possessed by any curtent city employee?
YES NO
F�cplain all yes answers on separete sheet and attach to green sheet
PROBLEM,ISSUE,
WHAT, WHEN, WHEflE, WHI�:
The problem "defective sidewalk" was caused by multiple problems, tree roots, poor subgrade materials, free/thaw cycles,
service life limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide basis and
must be addressed and corrected annually. Left uncorrected, the sidewalk condition would worsen to a state where it
would be unusable and subject to increased pedestrian injuries from talls and possible litigations.
IFAPPFOVEP
The community wil4 benefit from this project because it will provide safe defect free sidewalks for its citizens. The sidewalk
contracts are done by private contractors generating public sector jobs as a result.
DISADVANTAGES IF APPFOVED:
Historically, the sidewalk reconstruction has created negative feedback because of consiruction procedures and
assessments. Property owners question the assessments, despite the fact that up to one-haif the assessment is City
subsidized. Having to assess for walk reconstruction remains a controversial issue.
NOTAPPROVED:
This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personal injury
suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as well as claim payouts.
�;3i1G� f�e�^sL�$CC�1 ��"itBP
y ik � �A��
in Wards 4 R� 5(See attached list)
fOTAL AMOUNT OFTRANSACTION $ /���� � 7�+ COS7/REVENUE BUDGE7ED (CIRCLE ON� YES No
FUNDINGSOURCE �Q'M^� A. Pt� �� = Z yfl ACINfTYNUMBER C00-2T753-0784-0 000
FINANGALINFORMATION:(IXPIAIN) t — ! �
c, cia oo = 5a�000 �-
OdSd�
SLTMMARX OF ENGINEERING RECONIlVIENDATIONS
Ward 4
PRO.TECT: RECONSTRUCT SIDEWALK B.S. DEWEY ST. from Laurel Ave. to Seiby
Ave.
�4�`y�pZ INITIATING ACTION: This order was initiated by the Director of Public works as public
VV necessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
and uneven panels.
PRO.TECT: RECONSTRUCT SIDEWALK N.S. LAUREL AVE. from N. Howell St. to
Dewey St.
5�� IlVITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis o£ one (1) complaint, a petition with one (i) signer, and an inspection of the
walk.
EXISTING CONDITIONS: This walk is poured concrete with water pockets, disintegrated,
scaled, settled, and cracked panels.
.........................................................................................................
ov-sd�
SUMMARY OF ENGINEERING RECOMIViENDATION
C+:�S7�
PRO.TECT: RECONSTRi3CT SIDEWALK N.S. W. 3ESSAMINE AVE. from Galtier St. to
Marion St.
�(v'�G�� IlVITIATING ACTION: This order was initiated by the Director of Public Works as public
� �w � necessiry on the basis of five (5) complaints, a petition with one (1) signer, and an inspection of
the walk.
This walk is poured concrete with tree heaves, asphalt patches,
and uneven paneis.
C2TY OF ST. PAUL
ORDER
ORIGINAL
File .1<So. I �500093 - 500095
4 & 5
dD=.SO�
aa
In the Matter of sidewalk reeonstruction and/or naw construction at the following
locatioas:
500093 - Both sides Dewe� Street from Laurel Avenue to Selby Avenue.
500094 - North side Laurel Avenue from North Howell Street to Dewey Street.
500095 - North side West Jessamine Avenue from Galtier Street to Marion Street.
dd-Sd�
oR��iNa�
*ESTIMATED CONSTRUCTION RATES
DO -y?S
RESIDENTIAL RATES (One, two or three family structures)
Recoastruction (replacement of old sidewalk) -$9.65 per front foot for a
five (5) foot wide walk and $11.58 per front foot for a six (6) foot wide
walk. Al1 other widths will be prorated accordingly. New construction
(where no walk existed) - 100$ of the actual cost estimated to be
approximately $4.32 per square foot.
Al1 corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For new and reconsCructed sidewalk; 100� of actual cost estimated to be
approximately $5.84 per square foot.
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
l. That the said report and the sazne is hereby approved with no alternatives, �
that the estimated cost thereof is *SEE ABOVE for estimated Construction rates,
financed by assessments and 2000 Public Improvement Aid.
2
3
That a public hearing be had on said improvement on the 24 dav of Mav, 2000
5:30 o'clock P.M. in the Council Chambers of the City Hall and Court House
Building in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
�enanav
✓Blakey
✓�ostrom
�'o l eman
; /Karr i s
;/Laritry
�eiter
� In Favor
� Against
Adopted by Council: Date 3 c�c�0 D
�
Certified Passed by Council Secretary
$y I--�� a ��
Mayor