Loading...
00-351CITY OF ST. PAUL CO L F LE NO. 0" 3S FINAI, ORDER By � � Fi No. 500015-SO 035 Vo ng Ward_4 In the Matter of sidewalk reconstruction at the following locations: 500015 - Both sides North Albert Street from West Arlington Avenue to West Nebraska Avenue at 1483, 1485, 1489, 1495 & 1499 North Albert Street. 500016 - Both sides Ann Arbor Street from North Cretin Avenue to North Finn Street. S00017 - Both sides Carroll Avenue from North Cretin Avenue to North Finn Street. S00018 - South side Chelton Street from North Fairview Avenue to West Minnehaha Avenue. 500019 - Both sides North Cleveland Avenue from Roblyn Avenue to St. Anthony Avenue. 500020 - East side Holton Street from West Nebraska Avenue to West Hoyt Avenue at 1506 & 1510 Holton Street Only. 500021 - North side Midway Parkway from Arona Street to Simpson Street. 500022 - West side Montrose Place from Dayton Avenue to Marshall Avenue at 221 Montrose Place Only. 500023 - Both sides West Nebraska Avenue from North Pascal Street to North Albert Street & East side North Pascal Street from McKinley Street to West Nebraska Avenue. 500024 - Both sides Roblyn Avenue from North Cleveland Avenue to North Wilder Street. 500025 - Both sides Roblyn Avenue from North Finn Street to North Cleveland Avenue_ 500026 - Both sides Simpson Street from Midway Parkway to Frankson Street. 500027 - South side St. Anthony Avenue from North Cleveland Avenue to North Wilder Street. 500028 - Both sides Tatum Street from Chelton Avenue to Hewitt Avenue. 500029 - Both sides Temple Court from North Cretin Avenue to North Finn Street. 500030 - Both sides North Wheeler Street from Dayton Avenue to Marshall Avenue. 500031 - Both sides North Wheeler Street from Marshall Avenue to Iglehart Avenue & North side Marshall Avenue from North Fairview Avenue to North 4�heeler Street. 500032 - Both sides North Wheeler Street from West Minnehaha Avenue to Englewood Avenue. 500033 - Both sides North Vdheeler Street from Summit Avenue to Ashland Avenue. 500034 - West side Woodlawn Avenue from Princeton Avenue to Goodrich Avenue. 500035 - West side Woodlawn Avenue from St. Clair Avenue to Princeton Avenue. oa -351 *ESTIMATED CONSTRUCTION RATES RESIDENTIAL RATES (One, two or three family structures) Reconstxuation (replacement of old sidewalk) -$9.65 per front foot for a five (5) foot wide walk and $11.58 per front foot for a six (6) foot wide wa1k. A11 other widths wi11 be prorated accordingly. New coastructioa (where no walk existed) - 1000 of the actual cost estimated to be approximately $4.32 per square foot. All corner residential properties will receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abutting the "long side" of the property. MULTI-RESIDENTIAL (More than tfiree family structures), NON RESIDENTIAL RATES For new and reconstructed sidewalk; 100$ of actual cost estimated to be approximately $5.84 per square foot. under Preliminary order c'}f3 -•- ��,E3 approved �o, 2�16c"� The Council of the City of Saint Paul has conducted a public hearing upon the above improvement, due notice thereo£ having been given as prescribed by the City Charter; and WHEREAS, The Council has heard all persons, objections and recommendations pertaining to said proposed improvement and has fully considered the same; now, therefore, be it RESOLVED, That the Council of the City of Saint Paul does hereby order that the above-described improvement be made, and the proper City officers are hereby directed and authorized to proceed with the improvement; and be it FURTHER RESOLVED, That upon the completion of said improvement, the proper City officers shall calculate all expenses incurred therein and shall report the same to the City Council in accordance with Chapter 14 of the City Charter. COUNCILPERSONS Yeas Nays ✓Benanav ✓Blakey ✓BOStrom (-lbs<v.'� Coleman ✓Harris �/Lantry �iter Adopted by Council: Date i�\.a�_1 �_���p _ � Certified Passed by Council Secretary �o In Favor By �Against "F � 1 }��flSer�� t�11'�� Mayor (�� �v�W� �RIN� ��� �Ri� iz�2�oo � R�� ��-�0 : Works - Sidewalk Division �T PERSON & PFiONE TvedF (266-6087) t OFSIGNANflE PAGES (CLIP O DEPARTMENT DIFEC�OR � CfTY ATTORNEY O &1DGEf DIRECTOR (� MAVOR (OR ASSISTANn NO. 102746 wmnwa� ❑cmcouNCa j�p.'J� ❑Cfil'CLEHK ❑ FIN. & MGT. SERVICES �IF. � Council Research Reconstruct Sidewalk in Ward 4(See attached list) 3° � R � � PERSONALSERVICECONTRACTSMU5TANSWERTHEFOLLOWING�UES710NS: c,�vttSERV10ECOhtMtSSioN �_ F{ysthispersoNfirmeverworkedunderacoMractforihisdepartmen[? YES NO � -�- — 2. Has this persoNfirtn ever been a ciry employee? - — YES NO IICT COUNQL 3. Does this person/firm possess a skill not nortnally possessed by any curtent city employee? YES NO WniCH couNeiL OeJECnvE? - 6cpiain all yes answers on separate sheet anA attach to green sheet I L PROBLEM, ISSUE,OPPORTUNITY (WHO, WHAT, WHEN, WHERE, WH1'J: The problem "defective sidewalk" was caused by muitiple probiems, tree roots, poor subgrade materials, freefthaw cycles, service life limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide basis and must be addressed and corrected annuaily. LefF uncorrected, the sidewalk condition would worsen to a state where it would be unusable and subject to increased pedestrian injuries from falts and possible litigations. The community will benefit from this project because it will provide safe defect free sidewalks for its citizens. The sidewalk contracts are done by private contractors genecating public sector jobs as a result. Historically, the sidewalk reconstructions have created negative feedback because of construction procedures and assessments. Property owners question the assessments, despite the fact that up to one-half the assessment is City subsidized. Having to assess for walk reconstruction remains a controversial issue. Go�n�� R�s�arc� Ce��er � This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personal injury suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as well as claim payouts. C.O�a��w�'aP�,�; ��I�$BP' F ` � ' :If1 .• AMOUNTOFTRANSACTION$ ��su33�/o . COSDREVENUEBUDGETE6(CIRCLEONE} YES No JGSOURCE O��M��67� A. PIA 00 � � pCINfiYNUMBER C00-2T753-0784-00000 PLINFORJAATION:(EXPlA1N) B� x � C, Ct6 00 = 50,000 ' ' "` ` D o 35 � SUMMARY OF ENGINEERING RECOMNIENDATIONS Ward 4 PRO.TECT: RECONSTRUCT SIDEWALK B.S. N. ALBERT ST. from W. Arlington Ave. to W. Nebraska Ave. at 1483, 1485, 1489, 1495 & 1499 N. Albert St. Only. !����j I1�ITIATING ACTION: This order was initiated by the Director of Public works as public V � necessity on the basis of one (1) complaint and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches and cracked panels. ......................................................................................................... PRO.iECT: RECONSTRUCT SIDEWALK B.S. t1NI�i ARBOR ST. from N. Cretin Ave. to N. Finn St. �� IIVITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of seven (7) complaints and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. PRO.TECT: RECONSTRUCT SIDEWALK B.S. CARROLL AVE. from N. Cretin Ave. to N. Finn St. �j/m'� INTTIATING ACTION: This order was initiated by the D'uector of Public Works as pubiic d���/�� necessity on the basis of five (5) complaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. PRO.TECT: RECONSTRUCT SIDEWALK S.S. CHELTON ST. from N. Fairview Ave. to 5 ���j W. Minnehaha Ave. v IiVITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of two (2) complaints and an inspection of the walk. ao-351 -2- EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled, cracked and uneven panels. PRO.TECT: RECONSTRUCT SIDEWALK B.S. N. CLEVELAND AVE. from Roblyn Ave. to St. Anthony Ave. S(wy� IPTITIATING ACT'ION: This order was initiated by the Director of Public Works as public V VW� necessiry on the basis of one (1) complaint and an inspection of the waik. :1 � ►y ► EXISTING CONDITIONS: This walk is poured concrete with tree heaves and multi-cracked panels. PROTECT: RECONSTRUCT SIDEWALK E.S. HOLTON ST. from W. Nebraska Ave. to W. Hoyt Ave. at 1506 & 1510 Holton St. Only. INITIATING ACTION: This order was initiated by the Director of Public Works as public necessiYy on the basis of an inspection of the walk. This walk is poured concrete with heaves, settled and cracked panels. ......................................................................................................... �r► PROJECT: RECONSTRUCT SIDEWALK N.S. MIDWAY PKWY. from Arona St. to Simpson St. INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of two (2) complaints and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, �,� scaled, settled and cracked panels. PRO.TECT: RECONSTRUCT SIDEWALK W.S. MONTROSE PL. from Dayton Ave. to Marshall Ave. at 221 Montrose Pl. Only. INITIATING ACTION: Tlus order was initiated by the Director or Public Works as public necessity on the basis of one (i) complaint, a petition with one (1) signer and an inspection of the walk. OO-3S� -3- �1�i ( �� �' � EXISTING CONDIT`IONS: This walk is poured concrete with tree heaves and asphalt patches. PRO.TECT: RECONSTRUCT SIDEWALK B.S. W. NEBRASKA A'VE. from N. Pascal St. to N. Albert St. & E.S. N. PASCAL ST. from McKinley St. to W. Nebraska Ave. IDiITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, offgrade, asphalt patches, scaled, settled, cracked and uneven panels. PRO.TECT: RECONSTRUCT SIDEWALK B.S. ROBLI'N AVE. from N. Cleveland Ave. to N. WIlder St. IIVITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, and settled panels. PROJECT: RECONSTRUCT SIDEWALK B.S. ROBLYN AVE. from N. Finn St. to N. Cleveland Ave. IIVITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of six (6) complaints and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, settled, cracked and uneven panels. PRO.TECT: RECONSTRUCT SIDEWALK B.S. SIMPSON ST. from Midway Pkwy. to �SI�M'� Frankson Ave. ✓VW INITIATING ACTION: This order was initiated by the Director of Public Works as public necessiry on the basis of three (3) complaints and an inspection of the waik. 00 �351 � T7us walk is poured concrete with tree heaves, water pockets, �{� asphalt patches, settled, cracked and uneven panels. PRO.TECT: RECONSTRUCT SIDEWALK S.S. ST. AN'THONY AVE. from N. Cleveland Ave. to N. Wilder St. IIVITIATING ACT'ION: This order was initiated by the D'uector of Public Works as public necessity on the basis of one (1) complaint and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, �'� � and cracked panels. PROJECT: RECONSTRUCT SIDEWALK B.S. TATIJM ST. from Chelton Ave. to Hewitt Ave. IIVITIATING ACTION: This order was initiated by ttAe Director of Public Works as pubiic necessity on the basis of six (6) compiaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. .......................................................................... �OW�1 PRO.TECT: RECONSTRUCT SIDEWALK B.S. TEMPLE CT, from N. Cretin Ave. to N. Finn St. INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of eight (8) complaints and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, ,,1/�1.1 � 1 settled and cracked panels. P120.TECT: RECONSTRUCT SIDEWALK B.S. N. WHEBLER ST. from Dayton Ave. to Marshall Ave. IlVITIA.TING ACTION: This order was initiated by the D'uector of Public Works as public necessity on the basis of two (2) complaints and an inspection of the walk. OO �15� -5- I►i � ��� ���1� EXISTING CONDITTONS: This walk is poured concrete with tree heaves, asphalt patches, disintegrated and scaled panels. PRO.TECT: RECONSTRUCT SIDEWALK B.S. N. WF�ELER ST. from Marshall Ave. to Iglehart Ave. & N.S. MARSHALL AVE. from N. Fairview Ave. to N. Wheeler St. IIVITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. PRO.TECT: RECONSTRUCT SIDEWALK B.S. N. WHEELER ST. from W. Minnehaha Ave. to Englewood Ave. IriITIATING ACTION: This order was initiated by the Director of Public Works as public necessiry on the basis of one (1) complaint and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves and uneven panels. PRO.TECT: RECONSTRUCT SIDEWALK B.S. N. WHEELER ST. from Summit Ave. to Ashland Ave. I1vITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of two (2) complaints and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, iti scaled and cracked panels. PROJECT: RECONSTRUCT SIDEWALK W.S. WOODLAWN AVE. from Princeton Ave. to Goodrich Ave. IIVITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of two (2) complaints and an inspection of the walk. aa -3s I � EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches and settled panels. PRO.TECT: RECONSTRUCT SIDEWALK W.S. WOODLAWN AVE. from St. Clair Ave. to Princeton Ave. `� �� IiVITIATING ACTION: This order was initiated by the D'uector of Public Works as public necessity on the basis of one (1) complaint and an inspection of the wa1k. EXISTING CONDITIONS: This waik is poured concrete with tree heaves, asphalt patches, settled, uneven and cracked panels. c�o -3 s � CITY OF ST. PAIIL PRELa+lIIIARY ORDER COUNCIL FILE T0. O � O By Fil _500015 - S 0035 '� Voting Warcl 4_ Ia the Matter of sidewalk reconstruction at the follomiag locations: 500015 - Both sides North Albert Street from West Arlington Avenue to West Nebraska Avenue at 1483, 1485, 1489, 1495 & 1499 North Albert Street only. 500�16 - Both sides Ann Arbor Street from North Cretin Avenue to North Finn Street. 500017 - Both sides Carroll Avenue from North Cretin Avenue to North Finn Street. 50�018 - South side Chelton Street from North Fairview Avenue to West Minnehaha Avenue. 500019 - Both sides North Cleveland Avenue from Roblyn Avenue to St. Anthony Avenue. 500020 - East side Holton Avenue from West Nebraska Avenue to West Hoyt Avenue at 1506 & 1510 Holton Street only. 500021 - North side Midway Parkway from Arona Street to Simpson Street. S00022 - West side Montrose Place from Dayton Avenue to Marshall Avenue at 221 Montrose Place only. 500023 - Both sides West Nebraska Avenue from North Pascal Street to North Albert Street & East side North Pascal Street from McKinley Street to West Nebraska Avenue. 500024 - Both sides Roblyn Avenue from North Cleveland Avenue to North Wilder Street. 500025 - Both sides Roblyn Avenue from North Finn Street to North Cleveland Avenue. 500026 - Both sides Simpson Street from Midway Parkway to Frankson Avenue. 500027 - South side St. Anthony Avenue from North Cleveland Avenue to North Wilder Stzeet. S00028 - Both sides Tatum Street from Chelton Avenue to Hewitt Avenue. S00029 - Both sides Temple Court from North Cretin Avenue to North Finn Street. 500030 - Both sides North Wheeler Street from Dayton Avenue to Marshall Avenue. 500031 - Both sides North Wheeler Street from Marshall Avenue to Iglehart Avenue & North side Marshall Avenue from North Fairview Avenue to North Wheeler Street. 500032 - Both sides North Wheeler Street from West Minnehaha Avenue to Englewood Avenue. 500033 - Both sides North Wheeler Street £rom Summit Avenue to Ashland Avenue. S00034 - West side Woodlawn Avenue from Princeton Avenue to Goodrich Avenue. 500035 - West side Woodlawn Avenue from St. Clair Avenue to Princeton Avenue. � ao-�s� *ESTIMATED CONSTRUCTION RATES RESIDENTIAL RATES (One, two or three family structures) Recoastructioa (replacement of old sidewalk} -$9,65 per front foot for a five (5) foot wide walk and $11.58 per front foot for a six (6) foot wide walk. All other widths will be prorated accordingly. New construction (where no walk existed) - 100$ of the actual cost estimated to be approximately $4.32 per square foot. All corner residential properties wi11 receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abutting the "long side" of the property. MIILTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES For new and reconstructed sidewalk; 100$ o£ actual cost estimated to be approximately $5.84 per square foot. The Council of the City of Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: 1. That the said report and the same is hereby approved with no alternatives, � that the estimated cost thereof is *SEE ABOVE for estimated construction rates, financed by assessments and 2000 Public Improvement Aid. 2 3 That a public hearing be had on said improvement on the 1 2 th dav of AAril. 2000 5:30 o�clock P.M. in the Council Chambers of the City Aall and Court House Building in the City of Saint Paul. That notice of said public hearing be given to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cost thereof as esCimated. COUNCILPERSONS Yeas Nays ���,,}- � Benanav ,,� Blakey ��„ —Bostrom ,i Coleman ,i Harris ✓ Lantry ,/Rei ter �In Favor �Against a �bs�r�- Adopted by Council: Date �,�,� �a 3cc� Certified Passed by Council Secretary By �� � � < 1�-� � - Mayor CITY OF ST. PAUL CO L F LE NO. 0" 3S FINAI, ORDER By � � Fi No. 500015-SO 035 Vo ng Ward_4 In the Matter of sidewalk reconstruction at the following locations: 500015 - Both sides North Albert Street from West Arlington Avenue to West Nebraska Avenue at 1483, 1485, 1489, 1495 & 1499 North Albert Street. 500016 - Both sides Ann Arbor Street from North Cretin Avenue to North Finn Street. S00017 - Both sides Carroll Avenue from North Cretin Avenue to North Finn Street. S00018 - South side Chelton Street from North Fairview Avenue to West Minnehaha Avenue. 500019 - Both sides North Cleveland Avenue from Roblyn Avenue to St. Anthony Avenue. 500020 - East side Holton Street from West Nebraska Avenue to West Hoyt Avenue at 1506 & 1510 Holton Street Only. 500021 - North side Midway Parkway from Arona Street to Simpson Street. 500022 - West side Montrose Place from Dayton Avenue to Marshall Avenue at 221 Montrose Place Only. 500023 - Both sides West Nebraska Avenue from North Pascal Street to North Albert Street & East side North Pascal Street from McKinley Street to West Nebraska Avenue. 500024 - Both sides Roblyn Avenue from North Cleveland Avenue to North Wilder Street. 500025 - Both sides Roblyn Avenue from North Finn Street to North Cleveland Avenue_ 500026 - Both sides Simpson Street from Midway Parkway to Frankson Street. 500027 - South side St. Anthony Avenue from North Cleveland Avenue to North Wilder Street. 500028 - Both sides Tatum Street from Chelton Avenue to Hewitt Avenue. 500029 - Both sides Temple Court from North Cretin Avenue to North Finn Street. 500030 - Both sides North Wheeler Street from Dayton Avenue to Marshall Avenue. 500031 - Both sides North Wheeler Street from Marshall Avenue to Iglehart Avenue & North side Marshall Avenue from North Fairview Avenue to North 4�heeler Street. 500032 - Both sides North Wheeler Street from West Minnehaha Avenue to Englewood Avenue. 500033 - Both sides North Vdheeler Street from Summit Avenue to Ashland Avenue. 500034 - West side Woodlawn Avenue from Princeton Avenue to Goodrich Avenue. 500035 - West side Woodlawn Avenue from St. Clair Avenue to Princeton Avenue. oa -351 *ESTIMATED CONSTRUCTION RATES RESIDENTIAL RATES (One, two or three family structures) Reconstxuation (replacement of old sidewalk) -$9.65 per front foot for a five (5) foot wide walk and $11.58 per front foot for a six (6) foot wide wa1k. A11 other widths wi11 be prorated accordingly. New coastructioa (where no walk existed) - 1000 of the actual cost estimated to be approximately $4.32 per square foot. All corner residential properties will receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abutting the "long side" of the property. MULTI-RESIDENTIAL (More than tfiree family structures), NON RESIDENTIAL RATES For new and reconstructed sidewalk; 100$ of actual cost estimated to be approximately $5.84 per square foot. under Preliminary order c'}f3 -•- ��,E3 approved �o, 2�16c"� The Council of the City of Saint Paul has conducted a public hearing upon the above improvement, due notice thereo£ having been given as prescribed by the City Charter; and WHEREAS, The Council has heard all persons, objections and recommendations pertaining to said proposed improvement and has fully considered the same; now, therefore, be it RESOLVED, That the Council of the City of Saint Paul does hereby order that the above-described improvement be made, and the proper City officers are hereby directed and authorized to proceed with the improvement; and be it FURTHER RESOLVED, That upon the completion of said improvement, the proper City officers shall calculate all expenses incurred therein and shall report the same to the City Council in accordance with Chapter 14 of the City Charter. COUNCILPERSONS Yeas Nays ✓Benanav ✓Blakey ✓BOStrom (-lbs<v.'� Coleman ✓Harris �/Lantry �iter Adopted by Council: Date i�\.a�_1 �_���p _ � Certified Passed by Council Secretary �o In Favor By �Against "F � 1 }��flSer�� t�11'�� Mayor (�� �v�W� �RIN� ��� �Ri� iz�2�oo � R�� ��-�0 : Works - Sidewalk Division �T PERSON & PFiONE TvedF (266-6087) t OFSIGNANflE PAGES (CLIP O DEPARTMENT DIFEC�OR � CfTY ATTORNEY O &1DGEf DIRECTOR (� MAVOR (OR ASSISTANn NO. 102746 wmnwa� ❑cmcouNCa j�p.'J� ❑Cfil'CLEHK ❑ FIN. & MGT. SERVICES �IF. � Council Research Reconstruct Sidewalk in Ward 4(See attached list) 3° � R � � PERSONALSERVICECONTRACTSMU5TANSWERTHEFOLLOWING�UES710NS: c,�vttSERV10ECOhtMtSSioN �_ F{ysthispersoNfirmeverworkedunderacoMractforihisdepartmen[? YES NO � -�- — 2. Has this persoNfirtn ever been a ciry employee? - — YES NO IICT COUNQL 3. Does this person/firm possess a skill not nortnally possessed by any curtent city employee? YES NO WniCH couNeiL OeJECnvE? - 6cpiain all yes answers on separate sheet anA attach to green sheet I L PROBLEM, ISSUE,OPPORTUNITY (WHO, WHAT, WHEN, WHERE, WH1'J: The problem "defective sidewalk" was caused by muitiple probiems, tree roots, poor subgrade materials, freefthaw cycles, service life limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide basis and must be addressed and corrected annuaily. LefF uncorrected, the sidewalk condition would worsen to a state where it would be unusable and subject to increased pedestrian injuries from falts and possible litigations. The community will benefit from this project because it will provide safe defect free sidewalks for its citizens. The sidewalk contracts are done by private contractors genecating public sector jobs as a result. Historically, the sidewalk reconstructions have created negative feedback because of construction procedures and assessments. Property owners question the assessments, despite the fact that up to one-half the assessment is City subsidized. Having to assess for walk reconstruction remains a controversial issue. Go�n�� R�s�arc� Ce��er � This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personal injury suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as well as claim payouts. C.O�a��w�'aP�,�; ��I�$BP' F ` � ' :If1 .• AMOUNTOFTRANSACTION$ ��su33�/o . COSDREVENUEBUDGETE6(CIRCLEONE} YES No JGSOURCE O��M��67� A. PIA 00 � � pCINfiYNUMBER C00-2T753-0784-00000 PLINFORJAATION:(EXPlA1N) B� x � C, Ct6 00 = 50,000 ' ' "` ` D o 35 � SUMMARY OF ENGINEERING RECOMNIENDATIONS Ward 4 PRO.TECT: RECONSTRUCT SIDEWALK B.S. N. ALBERT ST. from W. Arlington Ave. to W. Nebraska Ave. at 1483, 1485, 1489, 1495 & 1499 N. Albert St. Only. !����j I1�ITIATING ACTION: This order was initiated by the Director of Public works as public V � necessity on the basis of one (1) complaint and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches and cracked panels. ......................................................................................................... PRO.iECT: RECONSTRUCT SIDEWALK B.S. t1NI�i ARBOR ST. from N. Cretin Ave. to N. Finn St. �� IIVITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of seven (7) complaints and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. PRO.TECT: RECONSTRUCT SIDEWALK B.S. CARROLL AVE. from N. Cretin Ave. to N. Finn St. �j/m'� INTTIATING ACTION: This order was initiated by the D'uector of Public Works as pubiic d���/�� necessity on the basis of five (5) complaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. PRO.TECT: RECONSTRUCT SIDEWALK S.S. CHELTON ST. from N. Fairview Ave. to 5 ���j W. Minnehaha Ave. v IiVITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of two (2) complaints and an inspection of the walk. ao-351 -2- EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled, cracked and uneven panels. PRO.TECT: RECONSTRUCT SIDEWALK B.S. N. CLEVELAND AVE. from Roblyn Ave. to St. Anthony Ave. S(wy� IPTITIATING ACT'ION: This order was initiated by the Director of Public Works as public V VW� necessiry on the basis of one (1) complaint and an inspection of the waik. :1 � ►y ► EXISTING CONDITIONS: This walk is poured concrete with tree heaves and multi-cracked panels. PROTECT: RECONSTRUCT SIDEWALK E.S. HOLTON ST. from W. Nebraska Ave. to W. Hoyt Ave. at 1506 & 1510 Holton St. Only. INITIATING ACTION: This order was initiated by the Director of Public Works as public necessiYy on the basis of an inspection of the walk. This walk is poured concrete with heaves, settled and cracked panels. ......................................................................................................... �r► PROJECT: RECONSTRUCT SIDEWALK N.S. MIDWAY PKWY. from Arona St. to Simpson St. INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of two (2) complaints and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, �,� scaled, settled and cracked panels. PRO.TECT: RECONSTRUCT SIDEWALK W.S. MONTROSE PL. from Dayton Ave. to Marshall Ave. at 221 Montrose Pl. Only. INITIATING ACTION: Tlus order was initiated by the Director or Public Works as public necessity on the basis of one (i) complaint, a petition with one (1) signer and an inspection of the walk. OO-3S� -3- �1�i ( �� �' � EXISTING CONDIT`IONS: This walk is poured concrete with tree heaves and asphalt patches. PRO.TECT: RECONSTRUCT SIDEWALK B.S. W. NEBRASKA A'VE. from N. Pascal St. to N. Albert St. & E.S. N. PASCAL ST. from McKinley St. to W. Nebraska Ave. IDiITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, offgrade, asphalt patches, scaled, settled, cracked and uneven panels. PRO.TECT: RECONSTRUCT SIDEWALK B.S. ROBLI'N AVE. from N. Cleveland Ave. to N. WIlder St. IIVITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, and settled panels. PROJECT: RECONSTRUCT SIDEWALK B.S. ROBLYN AVE. from N. Finn St. to N. Cleveland Ave. IIVITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of six (6) complaints and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, settled, cracked and uneven panels. PRO.TECT: RECONSTRUCT SIDEWALK B.S. SIMPSON ST. from Midway Pkwy. to �SI�M'� Frankson Ave. ✓VW INITIATING ACTION: This order was initiated by the Director of Public Works as public necessiry on the basis of three (3) complaints and an inspection of the waik. 00 �351 � T7us walk is poured concrete with tree heaves, water pockets, �{� asphalt patches, settled, cracked and uneven panels. PRO.TECT: RECONSTRUCT SIDEWALK S.S. ST. AN'THONY AVE. from N. Cleveland Ave. to N. Wilder St. IIVITIATING ACT'ION: This order was initiated by the D'uector of Public Works as public necessity on the basis of one (1) complaint and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, �'� � and cracked panels. PROJECT: RECONSTRUCT SIDEWALK B.S. TATIJM ST. from Chelton Ave. to Hewitt Ave. IIVITIATING ACTION: This order was initiated by ttAe Director of Public Works as pubiic necessity on the basis of six (6) compiaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. .......................................................................... �OW�1 PRO.TECT: RECONSTRUCT SIDEWALK B.S. TEMPLE CT, from N. Cretin Ave. to N. Finn St. INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of eight (8) complaints and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, ,,1/�1.1 � 1 settled and cracked panels. P120.TECT: RECONSTRUCT SIDEWALK B.S. N. WHEBLER ST. from Dayton Ave. to Marshall Ave. IlVITIA.TING ACTION: This order was initiated by the D'uector of Public Works as public necessity on the basis of two (2) complaints and an inspection of the walk. OO �15� -5- I►i � ��� ���1� EXISTING CONDITTONS: This walk is poured concrete with tree heaves, asphalt patches, disintegrated and scaled panels. PRO.TECT: RECONSTRUCT SIDEWALK B.S. N. WF�ELER ST. from Marshall Ave. to Iglehart Ave. & N.S. MARSHALL AVE. from N. Fairview Ave. to N. Wheeler St. IIVITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. PRO.TECT: RECONSTRUCT SIDEWALK B.S. N. WHEELER ST. from W. Minnehaha Ave. to Englewood Ave. IriITIATING ACTION: This order was initiated by the Director of Public Works as public necessiry on the basis of one (1) complaint and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves and uneven panels. PRO.TECT: RECONSTRUCT SIDEWALK B.S. N. WHEELER ST. from Summit Ave. to Ashland Ave. I1vITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of two (2) complaints and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, iti scaled and cracked panels. PROJECT: RECONSTRUCT SIDEWALK W.S. WOODLAWN AVE. from Princeton Ave. to Goodrich Ave. IIVITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of two (2) complaints and an inspection of the walk. aa -3s I � EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches and settled panels. PRO.TECT: RECONSTRUCT SIDEWALK W.S. WOODLAWN AVE. from St. Clair Ave. to Princeton Ave. `� �� IiVITIATING ACTION: This order was initiated by the D'uector of Public Works as public necessity on the basis of one (1) complaint and an inspection of the wa1k. EXISTING CONDITIONS: This waik is poured concrete with tree heaves, asphalt patches, settled, uneven and cracked panels. c�o -3 s � CITY OF ST. PAIIL PRELa+lIIIARY ORDER COUNCIL FILE T0. O � O By Fil _500015 - S 0035 '� Voting Warcl 4_ Ia the Matter of sidewalk reconstruction at the follomiag locations: 500015 - Both sides North Albert Street from West Arlington Avenue to West Nebraska Avenue at 1483, 1485, 1489, 1495 & 1499 North Albert Street only. 500�16 - Both sides Ann Arbor Street from North Cretin Avenue to North Finn Street. 500017 - Both sides Carroll Avenue from North Cretin Avenue to North Finn Street. 50�018 - South side Chelton Street from North Fairview Avenue to West Minnehaha Avenue. 500019 - Both sides North Cleveland Avenue from Roblyn Avenue to St. Anthony Avenue. 500020 - East side Holton Avenue from West Nebraska Avenue to West Hoyt Avenue at 1506 & 1510 Holton Street only. 500021 - North side Midway Parkway from Arona Street to Simpson Street. S00022 - West side Montrose Place from Dayton Avenue to Marshall Avenue at 221 Montrose Place only. 500023 - Both sides West Nebraska Avenue from North Pascal Street to North Albert Street & East side North Pascal Street from McKinley Street to West Nebraska Avenue. 500024 - Both sides Roblyn Avenue from North Cleveland Avenue to North Wilder Street. 500025 - Both sides Roblyn Avenue from North Finn Street to North Cleveland Avenue. 500026 - Both sides Simpson Street from Midway Parkway to Frankson Avenue. 500027 - South side St. Anthony Avenue from North Cleveland Avenue to North Wilder Stzeet. S00028 - Both sides Tatum Street from Chelton Avenue to Hewitt Avenue. S00029 - Both sides Temple Court from North Cretin Avenue to North Finn Street. 500030 - Both sides North Wheeler Street from Dayton Avenue to Marshall Avenue. 500031 - Both sides North Wheeler Street from Marshall Avenue to Iglehart Avenue & North side Marshall Avenue from North Fairview Avenue to North Wheeler Street. 500032 - Both sides North Wheeler Street from West Minnehaha Avenue to Englewood Avenue. 500033 - Both sides North Wheeler Street £rom Summit Avenue to Ashland Avenue. S00034 - West side Woodlawn Avenue from Princeton Avenue to Goodrich Avenue. 500035 - West side Woodlawn Avenue from St. Clair Avenue to Princeton Avenue. � ao-�s� *ESTIMATED CONSTRUCTION RATES RESIDENTIAL RATES (One, two or three family structures) Recoastructioa (replacement of old sidewalk} -$9,65 per front foot for a five (5) foot wide walk and $11.58 per front foot for a six (6) foot wide walk. All other widths will be prorated accordingly. New construction (where no walk existed) - 100$ of the actual cost estimated to be approximately $4.32 per square foot. All corner residential properties wi11 receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abutting the "long side" of the property. MIILTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES For new and reconstructed sidewalk; 100$ o£ actual cost estimated to be approximately $5.84 per square foot. The Council of the City of Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: 1. That the said report and the same is hereby approved with no alternatives, � that the estimated cost thereof is *SEE ABOVE for estimated construction rates, financed by assessments and 2000 Public Improvement Aid. 2 3 That a public hearing be had on said improvement on the 1 2 th dav of AAril. 2000 5:30 o�clock P.M. in the Council Chambers of the City Aall and Court House Building in the City of Saint Paul. That notice of said public hearing be given to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cost thereof as esCimated. COUNCILPERSONS Yeas Nays ���,,}- � Benanav ,,� Blakey ��„ —Bostrom ,i Coleman ,i Harris ✓ Lantry ,/Rei ter �In Favor �Against a �bs�r�- Adopted by Council: Date �,�,� �a 3cc� Certified Passed by Council Secretary By �� � � < 1�-� � - Mayor CITY OF ST. PAUL CO L F LE NO. 0" 3S FINAI, ORDER By � � Fi No. 500015-SO 035 Vo ng Ward_4 In the Matter of sidewalk reconstruction at the following locations: 500015 - Both sides North Albert Street from West Arlington Avenue to West Nebraska Avenue at 1483, 1485, 1489, 1495 & 1499 North Albert Street. 500016 - Both sides Ann Arbor Street from North Cretin Avenue to North Finn Street. S00017 - Both sides Carroll Avenue from North Cretin Avenue to North Finn Street. S00018 - South side Chelton Street from North Fairview Avenue to West Minnehaha Avenue. 500019 - Both sides North Cleveland Avenue from Roblyn Avenue to St. Anthony Avenue. 500020 - East side Holton Street from West Nebraska Avenue to West Hoyt Avenue at 1506 & 1510 Holton Street Only. 500021 - North side Midway Parkway from Arona Street to Simpson Street. 500022 - West side Montrose Place from Dayton Avenue to Marshall Avenue at 221 Montrose Place Only. 500023 - Both sides West Nebraska Avenue from North Pascal Street to North Albert Street & East side North Pascal Street from McKinley Street to West Nebraska Avenue. 500024 - Both sides Roblyn Avenue from North Cleveland Avenue to North Wilder Street. 500025 - Both sides Roblyn Avenue from North Finn Street to North Cleveland Avenue_ 500026 - Both sides Simpson Street from Midway Parkway to Frankson Street. 500027 - South side St. Anthony Avenue from North Cleveland Avenue to North Wilder Street. 500028 - Both sides Tatum Street from Chelton Avenue to Hewitt Avenue. 500029 - Both sides Temple Court from North Cretin Avenue to North Finn Street. 500030 - Both sides North Wheeler Street from Dayton Avenue to Marshall Avenue. 500031 - Both sides North Wheeler Street from Marshall Avenue to Iglehart Avenue & North side Marshall Avenue from North Fairview Avenue to North 4�heeler Street. 500032 - Both sides North Wheeler Street from West Minnehaha Avenue to Englewood Avenue. 500033 - Both sides North Vdheeler Street from Summit Avenue to Ashland Avenue. 500034 - West side Woodlawn Avenue from Princeton Avenue to Goodrich Avenue. 500035 - West side Woodlawn Avenue from St. Clair Avenue to Princeton Avenue. oa -351 *ESTIMATED CONSTRUCTION RATES RESIDENTIAL RATES (One, two or three family structures) Reconstxuation (replacement of old sidewalk) -$9.65 per front foot for a five (5) foot wide walk and $11.58 per front foot for a six (6) foot wide wa1k. A11 other widths wi11 be prorated accordingly. New coastructioa (where no walk existed) - 1000 of the actual cost estimated to be approximately $4.32 per square foot. All corner residential properties will receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abutting the "long side" of the property. MULTI-RESIDENTIAL (More than tfiree family structures), NON RESIDENTIAL RATES For new and reconstructed sidewalk; 100$ of actual cost estimated to be approximately $5.84 per square foot. under Preliminary order c'}f3 -•- ��,E3 approved �o, 2�16c"� The Council of the City of Saint Paul has conducted a public hearing upon the above improvement, due notice thereo£ having been given as prescribed by the City Charter; and WHEREAS, The Council has heard all persons, objections and recommendations pertaining to said proposed improvement and has fully considered the same; now, therefore, be it RESOLVED, That the Council of the City of Saint Paul does hereby order that the above-described improvement be made, and the proper City officers are hereby directed and authorized to proceed with the improvement; and be it FURTHER RESOLVED, That upon the completion of said improvement, the proper City officers shall calculate all expenses incurred therein and shall report the same to the City Council in accordance with Chapter 14 of the City Charter. COUNCILPERSONS Yeas Nays ✓Benanav ✓Blakey ✓BOStrom (-lbs<v.'� Coleman ✓Harris �/Lantry �iter Adopted by Council: Date i�\.a�_1 �_���p _ � Certified Passed by Council Secretary �o In Favor By �Against "F � 1 }��flSer�� t�11'�� Mayor (�� �v�W� �RIN� ��� �Ri� iz�2�oo � R�� ��-�0 : Works - Sidewalk Division �T PERSON & PFiONE TvedF (266-6087) t OFSIGNANflE PAGES (CLIP O DEPARTMENT DIFEC�OR � CfTY ATTORNEY O &1DGEf DIRECTOR (� MAVOR (OR ASSISTANn NO. 102746 wmnwa� ❑cmcouNCa j�p.'J� ❑Cfil'CLEHK ❑ FIN. & MGT. SERVICES �IF. � Council Research Reconstruct Sidewalk in Ward 4(See attached list) 3° � R � � PERSONALSERVICECONTRACTSMU5TANSWERTHEFOLLOWING�UES710NS: c,�vttSERV10ECOhtMtSSioN �_ F{ysthispersoNfirmeverworkedunderacoMractforihisdepartmen[? YES NO � -�- — 2. Has this persoNfirtn ever been a ciry employee? - — YES NO IICT COUNQL 3. Does this person/firm possess a skill not nortnally possessed by any curtent city employee? YES NO WniCH couNeiL OeJECnvE? - 6cpiain all yes answers on separate sheet anA attach to green sheet I L PROBLEM, ISSUE,OPPORTUNITY (WHO, WHAT, WHEN, WHERE, WH1'J: The problem "defective sidewalk" was caused by muitiple probiems, tree roots, poor subgrade materials, freefthaw cycles, service life limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide basis and must be addressed and corrected annuaily. LefF uncorrected, the sidewalk condition would worsen to a state where it would be unusable and subject to increased pedestrian injuries from falts and possible litigations. The community will benefit from this project because it will provide safe defect free sidewalks for its citizens. The sidewalk contracts are done by private contractors genecating public sector jobs as a result. Historically, the sidewalk reconstructions have created negative feedback because of construction procedures and assessments. Property owners question the assessments, despite the fact that up to one-half the assessment is City subsidized. Having to assess for walk reconstruction remains a controversial issue. Go�n�� R�s�arc� Ce��er � This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personal injury suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as well as claim payouts. C.O�a��w�'aP�,�; ��I�$BP' F ` � ' :If1 .• AMOUNTOFTRANSACTION$ ��su33�/o . COSDREVENUEBUDGETE6(CIRCLEONE} YES No JGSOURCE O��M��67� A. PIA 00 � � pCINfiYNUMBER C00-2T753-0784-00000 PLINFORJAATION:(EXPlA1N) B� x � C, Ct6 00 = 50,000 ' ' "` ` D o 35 � SUMMARY OF ENGINEERING RECOMNIENDATIONS Ward 4 PRO.TECT: RECONSTRUCT SIDEWALK B.S. N. ALBERT ST. from W. Arlington Ave. to W. Nebraska Ave. at 1483, 1485, 1489, 1495 & 1499 N. Albert St. Only. !����j I1�ITIATING ACTION: This order was initiated by the Director of Public works as public V � necessity on the basis of one (1) complaint and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches and cracked panels. ......................................................................................................... PRO.iECT: RECONSTRUCT SIDEWALK B.S. t1NI�i ARBOR ST. from N. Cretin Ave. to N. Finn St. �� IIVITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of seven (7) complaints and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. PRO.TECT: RECONSTRUCT SIDEWALK B.S. CARROLL AVE. from N. Cretin Ave. to N. Finn St. �j/m'� INTTIATING ACTION: This order was initiated by the D'uector of Public Works as pubiic d���/�� necessity on the basis of five (5) complaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. PRO.TECT: RECONSTRUCT SIDEWALK S.S. CHELTON ST. from N. Fairview Ave. to 5 ���j W. Minnehaha Ave. v IiVITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of two (2) complaints and an inspection of the walk. ao-351 -2- EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled, cracked and uneven panels. PRO.TECT: RECONSTRUCT SIDEWALK B.S. N. CLEVELAND AVE. from Roblyn Ave. to St. Anthony Ave. S(wy� IPTITIATING ACT'ION: This order was initiated by the Director of Public Works as public V VW� necessiry on the basis of one (1) complaint and an inspection of the waik. :1 � ►y ► EXISTING CONDITIONS: This walk is poured concrete with tree heaves and multi-cracked panels. PROTECT: RECONSTRUCT SIDEWALK E.S. HOLTON ST. from W. Nebraska Ave. to W. Hoyt Ave. at 1506 & 1510 Holton St. Only. INITIATING ACTION: This order was initiated by the Director of Public Works as public necessiYy on the basis of an inspection of the walk. This walk is poured concrete with heaves, settled and cracked panels. ......................................................................................................... �r► PROJECT: RECONSTRUCT SIDEWALK N.S. MIDWAY PKWY. from Arona St. to Simpson St. INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of two (2) complaints and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, �,� scaled, settled and cracked panels. PRO.TECT: RECONSTRUCT SIDEWALK W.S. MONTROSE PL. from Dayton Ave. to Marshall Ave. at 221 Montrose Pl. Only. INITIATING ACTION: Tlus order was initiated by the Director or Public Works as public necessity on the basis of one (i) complaint, a petition with one (1) signer and an inspection of the walk. OO-3S� -3- �1�i ( �� �' � EXISTING CONDIT`IONS: This walk is poured concrete with tree heaves and asphalt patches. PRO.TECT: RECONSTRUCT SIDEWALK B.S. W. NEBRASKA A'VE. from N. Pascal St. to N. Albert St. & E.S. N. PASCAL ST. from McKinley St. to W. Nebraska Ave. IDiITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, offgrade, asphalt patches, scaled, settled, cracked and uneven panels. PRO.TECT: RECONSTRUCT SIDEWALK B.S. ROBLI'N AVE. from N. Cleveland Ave. to N. WIlder St. IIVITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, and settled panels. PROJECT: RECONSTRUCT SIDEWALK B.S. ROBLYN AVE. from N. Finn St. to N. Cleveland Ave. IIVITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of six (6) complaints and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, settled, cracked and uneven panels. PRO.TECT: RECONSTRUCT SIDEWALK B.S. SIMPSON ST. from Midway Pkwy. to �SI�M'� Frankson Ave. ✓VW INITIATING ACTION: This order was initiated by the Director of Public Works as public necessiry on the basis of three (3) complaints and an inspection of the waik. 00 �351 � T7us walk is poured concrete with tree heaves, water pockets, �{� asphalt patches, settled, cracked and uneven panels. PRO.TECT: RECONSTRUCT SIDEWALK S.S. ST. AN'THONY AVE. from N. Cleveland Ave. to N. Wilder St. IIVITIATING ACT'ION: This order was initiated by the D'uector of Public Works as public necessity on the basis of one (1) complaint and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, �'� � and cracked panels. PROJECT: RECONSTRUCT SIDEWALK B.S. TATIJM ST. from Chelton Ave. to Hewitt Ave. IIVITIATING ACTION: This order was initiated by ttAe Director of Public Works as pubiic necessity on the basis of six (6) compiaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. .......................................................................... �OW�1 PRO.TECT: RECONSTRUCT SIDEWALK B.S. TEMPLE CT, from N. Cretin Ave. to N. Finn St. INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of eight (8) complaints and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, ,,1/�1.1 � 1 settled and cracked panels. P120.TECT: RECONSTRUCT SIDEWALK B.S. N. WHEBLER ST. from Dayton Ave. to Marshall Ave. IlVITIA.TING ACTION: This order was initiated by the D'uector of Public Works as public necessity on the basis of two (2) complaints and an inspection of the walk. OO �15� -5- I►i � ��� ���1� EXISTING CONDITTONS: This walk is poured concrete with tree heaves, asphalt patches, disintegrated and scaled panels. PRO.TECT: RECONSTRUCT SIDEWALK B.S. N. WF�ELER ST. from Marshall Ave. to Iglehart Ave. & N.S. MARSHALL AVE. from N. Fairview Ave. to N. Wheeler St. IIVITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. PRO.TECT: RECONSTRUCT SIDEWALK B.S. N. WHEELER ST. from W. Minnehaha Ave. to Englewood Ave. IriITIATING ACTION: This order was initiated by the Director of Public Works as public necessiry on the basis of one (1) complaint and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves and uneven panels. PRO.TECT: RECONSTRUCT SIDEWALK B.S. N. WHEELER ST. from Summit Ave. to Ashland Ave. I1vITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of two (2) complaints and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, iti scaled and cracked panels. PROJECT: RECONSTRUCT SIDEWALK W.S. WOODLAWN AVE. from Princeton Ave. to Goodrich Ave. IIVITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of two (2) complaints and an inspection of the walk. aa -3s I � EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches and settled panels. PRO.TECT: RECONSTRUCT SIDEWALK W.S. WOODLAWN AVE. from St. Clair Ave. to Princeton Ave. `� �� IiVITIATING ACTION: This order was initiated by the D'uector of Public Works as public necessity on the basis of one (1) complaint and an inspection of the wa1k. EXISTING CONDITIONS: This waik is poured concrete with tree heaves, asphalt patches, settled, uneven and cracked panels. c�o -3 s � CITY OF ST. PAIIL PRELa+lIIIARY ORDER COUNCIL FILE T0. O � O By Fil _500015 - S 0035 '� Voting Warcl 4_ Ia the Matter of sidewalk reconstruction at the follomiag locations: 500015 - Both sides North Albert Street from West Arlington Avenue to West Nebraska Avenue at 1483, 1485, 1489, 1495 & 1499 North Albert Street only. 500�16 - Both sides Ann Arbor Street from North Cretin Avenue to North Finn Street. 500017 - Both sides Carroll Avenue from North Cretin Avenue to North Finn Street. 50�018 - South side Chelton Street from North Fairview Avenue to West Minnehaha Avenue. 500019 - Both sides North Cleveland Avenue from Roblyn Avenue to St. Anthony Avenue. 500020 - East side Holton Avenue from West Nebraska Avenue to West Hoyt Avenue at 1506 & 1510 Holton Street only. 500021 - North side Midway Parkway from Arona Street to Simpson Street. S00022 - West side Montrose Place from Dayton Avenue to Marshall Avenue at 221 Montrose Place only. 500023 - Both sides West Nebraska Avenue from North Pascal Street to North Albert Street & East side North Pascal Street from McKinley Street to West Nebraska Avenue. 500024 - Both sides Roblyn Avenue from North Cleveland Avenue to North Wilder Street. 500025 - Both sides Roblyn Avenue from North Finn Street to North Cleveland Avenue. 500026 - Both sides Simpson Street from Midway Parkway to Frankson Avenue. 500027 - South side St. Anthony Avenue from North Cleveland Avenue to North Wilder Stzeet. S00028 - Both sides Tatum Street from Chelton Avenue to Hewitt Avenue. S00029 - Both sides Temple Court from North Cretin Avenue to North Finn Street. 500030 - Both sides North Wheeler Street from Dayton Avenue to Marshall Avenue. 500031 - Both sides North Wheeler Street from Marshall Avenue to Iglehart Avenue & North side Marshall Avenue from North Fairview Avenue to North Wheeler Street. 500032 - Both sides North Wheeler Street from West Minnehaha Avenue to Englewood Avenue. 500033 - Both sides North Wheeler Street £rom Summit Avenue to Ashland Avenue. S00034 - West side Woodlawn Avenue from Princeton Avenue to Goodrich Avenue. 500035 - West side Woodlawn Avenue from St. Clair Avenue to Princeton Avenue. � ao-�s� *ESTIMATED CONSTRUCTION RATES RESIDENTIAL RATES (One, two or three family structures) Recoastructioa (replacement of old sidewalk} -$9,65 per front foot for a five (5) foot wide walk and $11.58 per front foot for a six (6) foot wide walk. All other widths will be prorated accordingly. New construction (where no walk existed) - 100$ of the actual cost estimated to be approximately $4.32 per square foot. All corner residential properties wi11 receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abutting the "long side" of the property. MIILTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES For new and reconstructed sidewalk; 100$ o£ actual cost estimated to be approximately $5.84 per square foot. The Council of the City of Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: 1. That the said report and the same is hereby approved with no alternatives, � that the estimated cost thereof is *SEE ABOVE for estimated construction rates, financed by assessments and 2000 Public Improvement Aid. 2 3 That a public hearing be had on said improvement on the 1 2 th dav of AAril. 2000 5:30 o�clock P.M. in the Council Chambers of the City Aall and Court House Building in the City of Saint Paul. That notice of said public hearing be given to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cost thereof as esCimated. COUNCILPERSONS Yeas Nays ���,,}- � Benanav ,,� Blakey ��„ —Bostrom ,i Coleman ,i Harris ✓ Lantry ,/Rei ter �In Favor �Against a �bs�r�- Adopted by Council: Date �,�,� �a 3cc� Certified Passed by Council Secretary By �� � � < 1�-� � - Mayor