File No. 18925
Voting Ward 2
In the Matter of the Operation Costs o£ the Above Standard Street Lighting
System for the months of January thru December, 2000 for the following:
West side of North Robert Street from East 6 Street to East 7 Street;
South side East 7 Place from North Robert Street to Minnesota Street;
East side Minnesota Street from East 7"' Place to East 6 Street;
North side East 6"' Street from Minnesota Street to North Robert Street;
To be known as the Minnesota Mutual Life Tower Area.
under Preliminary Order C�� — 1�� approved �.�. � aoc�c�
�
The Council of the City of Saint Paul has conducted a public hearing
upon the above improvement, due notice thereof having been given as
prescribed by the City Charter; and
WHEREAS, The Council has heard all persons, objections and
recommendations pertaining to said proposed improvement and has fully
considered the same; now, therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order
that the above-described improvemen.t be made, and the proper City officers
are hereby directed and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the
proper City officers shall calculate all expenses incurred therein and shall
report the same to the City Council in accordance with Chapter 14 of the City
Charter.
COUNCILPERSON
Yeas Nays
ASp 5�,,.,�Benanav
✓Blakey
J ostrom
�oleman
✓Ffarris
, /�antry
�iter
� In Favor
� Against
� ���`c
Adopted by the Council: Aate��, �e3 8�
Certified Passed by the Council Secretary
By �� —
�i�.,� �o����
Ma or
�/z/�
Public Hearin : 03/22/00 G'°Ooa
T.M.S./REAL ESTATE DIVISION Da�� Q t�� R�� v Green Sheet Number: � Q2712
DEPARTMENI' DIItECfOR C1'1'Y COUNCII.
ontact Person aud Phone Nnmber.
� ''777 �� ' "' ° ' 0101 Cfl'Y ATTORNEY CITY CLERK
Bl,� T� 266-6215 BUDGET DII2ECfOR TECE & MGT- SVG DIIt
i��" X
v MAYOR(ORASSLSTANT) 1 COUNCD,RF.SEARCH
/� A� ��d�
OTAL # OF SIGNATORE PAGES (CLIP ALL LOCATIONS FOR SIGNATURE)
CTION REQUESTED:
ettiag date of public heariag for the estimated operating costs for an above
standard street light project for 2000. (Golden Rule Bldg & Minnesota Mutual
ife Towar)
ile No. 18925
COMMENDATIONS: APPROVE (A) OR RE.iECT (R) ERSONAL SEAVICE CONTRACTS MUST ANSWER THE FOLLOWING:
. Has the person/Firm ever worked mder a contract for this depar[ment? YES NO
PLANNING COMMISSION A STAFF
. Has tLis person/t`vm ever been a City employee? YES NO
CNII, SERVICE COMMISSION
. Does this persodFirm possess a slrill not normally possessed by any YES NO
CIB COMMITTEE current City employee?
Explain all YES aaswers on a separate sheet and attach.
TING YROBLEM, ISS[SE, OPPORTUHITY (Who, What, When, Where, Why°):
blic hearing is necessary to approve the estimated annual operating costs for the above standard lighting
roject
VANTAGES IF APPROVED:
ame as above.
- ISADVANTAGESIFAPPROVED:
enefitted property owners will have assessments payable via property taxes.
ISADVANTAGES IF NOT APPROVED:
he City would have to pay the costs.
OTAL AMOUNT' OF 1`RANSACTiON: �S` S � 2 S 9. O O COST/REVENUE BUDGETED (CIRCLE ONE) YES NO
ASSESSMEN'PS
INGSOURCE: ' �1�052.00 Golden Rule B�.dg ACTIVITYNUMBER:
$4,207.00 Minn Mutual Life . �,,, �
OUP�CI. .L��. ELne v+.s� .
ANC7AL INFORMATION: (EXPLAIPn �� � � ���
9
�
po_a�q
SUMMAI2Y OF ENGINEERING RECOMNYENDATIONS
7anuary 11, 2000
Project
Installation of a globe style street lighting system on Robert Sffeet from E. 7�' Place to E. 7`� Sffeet.
Iniriating Action
The project was initiated by the property owners of the Golden Rule Building.
E�sting Condifions
Lighting in this azea is now provided by bent straw street lights.
Proposed Improvements
Installa6on of 3 three fixture globe lights and 2 five fixture globe street lights.
Positive Benefits
This will be an attractive lighting system which will provide an adequate amount of light with an
acceptable uniformiry of distribution. This project will enhance the aesthetics of the azea..
Adverse Effects
As with all new lighting systems, there will be some increased maintenance and operating costs to the
abutting property owner.
Tnne Schedule
System is currently in use.
Cost Estimate
Opeiating and xnaintenance $1,051_73
Financing
Assessments
Source of Additional Information
Ken Taillon at 266-6215.
Recommendation
$1,051.73
This proposal is consistent with the City of St. Paul's Lighting Policy. The Department recommends
approval of this project.
Respectfully submitted,
Thomas J. Eggum
Director
Oo -a�9
SUNIMARY OF ENGINEERING RECOMMENDATIONS
January 11, 2000
Project
Installation of a globe style street lighting system on Robert Street from E. 7`" Place to 6`" Street, 6`� Street
from Robert Street to Minnesota Saeet, Minnesota Street from 6'� Street to E. '7"' Place and E. 7'" Place
from Minnesota Street to Robert Sueet.
Initiating Action
The project was initiated by the property owners of the Minnesota Life Building.
Existing Conditions
Lighting in this area is currently provided by bent straw street lights.
Proposed Improvements
Installation of 12 tYixee fixture globe lights and 8 five fixture globe lights.
Posifive Benetits
This will be an attractive lighting system which will pxovide an adequate amount of light with an
acceptable unifornuty of distribution. This project will enhance the aesthetics of the area..
Adverse Effects
As with all new lighting systems, there will be some increased maintenance and operating costs to the
abutting property owner.
Time Schedule
Construction in 2000..
Cost Estimate
Operating and maintenance $4,206.93
l�nancing
Assessments
Source of Additional Information
Ken Taillon at 266-6215.
$A,206.93
Recommendation
This proposal is consistent with the City of St. PauP s Lighting Policy. The Department recommends
approval of this project.
Respectfully submitted,
Thomas J. Eggum
Director
� �
� �
���
\• ✓
,S- � ��
\� �
/ n :
\� \
W
� �
� j
��
�
� ���
\ .�
� �
/ �'�-�,
s�
�� ti�
a \�� �
�- �
��
w Z
m �
�� w
.
Z
\ O �
�
� �
,
\,
� Y
a
: . �.
\
��
� �
w
Q J
O Q W
Z� F-
Z
� � U
w .
o��
0
O��
.'
�
U Uw°
�1 � �
F- �-
� =��
z�o
� �r
�
ti��
. c'
�
� � D �A
��� �
w
J �
U
� Z o
�
►
. ,�
�,
a�
C� w �
w L- O
a� � ;
�\ �
m �
� \ � W
�����
�O�
Q �
t�!'3
� W
ti U
0
�� .
�
�Z
� _Z
Z�
��
O
O�
/
�
y ��
CITX OF ST. PAUL
PRELIMINARY ORDER
ORIGINAL
�.1flD �p.a�
�
File No. 18925
Voting WarB 2
In the Matter of the Operation Costs of the Above Standard Street Lighting
System for 2000 for the following project:
West side of North Robert Street from East 6`" Street to East 7"' Street;
South side East 7` Place from North Robert Street to Minnesota Street;
East side Minnesota Street from East 7 Place to East 6 Street;
North side East 6` Street from Minnesota Street to North Robert Street;
To be known as the Minnesota Mutual Life Tower Area.
The Council of the City of Saint Paul having received the report of the
Mayor upon the above improvement, and having considered said report, hereby
resolves:
1. That the said report and the same is hereby approve with no
alternatives, and that the estimated cost thereof is $5,259.00, financed by
assessments only.
2. That a public hearing be had on said improvement on the 22nd dav of
March, 2000. at 5:30 o'clock n.m., in the Council Chambers of the City Hall
and Court House Building in the City of Saint Paul.
3. That notice of said public hearing be given to the persons and in the
manner provided by the Charter, stating the time and place of hearing, the
nature of the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
✓Benanav
�/Blakey
,/Bostrom
,/Coleman
,�Iarris
,,Lantry
,/Aeiter
� In Favor
� Against
Adopted by the Council: Date ��n. �- � �a o
�
Certified Passed by the Council Secretary
By 1 \ � � — �c.v�t\ �--�—���
Mayor
City of St. Paul
FINAL ORDER
ORIGINAL
C -?g'�j
CO F � N . !,�
�� j
B
File No. 18925
Voting Ward 2
In the Matter of the Operation Costs o£ the Above Standard Street Lighting
System for the months of January thru December, 2000 for the following:
West side of North Robert Street from East 6 Street to East 7 Street;
South side East 7 Place from North Robert Street to Minnesota Street;
East side Minnesota Street from East 7"' Place to East 6 Street;
North side East 6"' Street from Minnesota Street to North Robert Street;
To be known as the Minnesota Mutual Life Tower Area.
under Preliminary Order C�� — 1�� approved �.�. � aoc�c�
�
The Council of the City of Saint Paul has conducted a public hearing
upon the above improvement, due notice thereof having been given as
prescribed by the City Charter; and
WHEREAS, The Council has heard all persons, objections and
recommendations pertaining to said proposed improvement and has fully
considered the same; now, therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order
that the above-described improvemen.t be made, and the proper City officers
are hereby directed and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the
proper City officers shall calculate all expenses incurred therein and shall
report the same to the City Council in accordance with Chapter 14 of the City
Charter.
COUNCILPERSON
Yeas Nays
ASp 5�,,.,�Benanav
✓Blakey
J ostrom
�oleman
✓Ffarris
, /�antry
�iter
� In Favor
� Against
� ���`c
Adopted by the Council: Aate��, �e3 8�
Certified Passed by the Council Secretary
By �� —
�i�.,� �o����
Ma or
�/z/�
Public Hearin : 03/22/00 G'°Ooa
T.M.S./REAL ESTATE DIVISION Da�� Q t�� R�� v Green Sheet Number: � Q2712
DEPARTMENI' DIItECfOR C1'1'Y COUNCII.
ontact Person aud Phone Nnmber.
� ''777 �� ' "' ° ' 0101 Cfl'Y ATTORNEY CITY CLERK
Bl,� T� 266-6215 BUDGET DII2ECfOR TECE & MGT- SVG DIIt
i��" X
v MAYOR(ORASSLSTANT) 1 COUNCD,RF.SEARCH
/� A� ��d�
OTAL # OF SIGNATORE PAGES (CLIP ALL LOCATIONS FOR SIGNATURE)
CTION REQUESTED:
ettiag date of public heariag for the estimated operating costs for an above
standard street light project for 2000. (Golden Rule Bldg & Minnesota Mutual
ife Towar)
ile No. 18925
COMMENDATIONS: APPROVE (A) OR RE.iECT (R) ERSONAL SEAVICE CONTRACTS MUST ANSWER THE FOLLOWING:
. Has the person/Firm ever worked mder a contract for this depar[ment? YES NO
PLANNING COMMISSION A STAFF
. Has tLis person/t`vm ever been a City employee? YES NO
CNII, SERVICE COMMISSION
. Does this persodFirm possess a slrill not normally possessed by any YES NO
CIB COMMITTEE current City employee?
Explain all YES aaswers on a separate sheet and attach.
TING YROBLEM, ISS[SE, OPPORTUHITY (Who, What, When, Where, Why°):
blic hearing is necessary to approve the estimated annual operating costs for the above standard lighting
roject
VANTAGES IF APPROVED:
ame as above.
- ISADVANTAGESIFAPPROVED:
enefitted property owners will have assessments payable via property taxes.
ISADVANTAGES IF NOT APPROVED:
he City would have to pay the costs.
OTAL AMOUNT' OF 1`RANSACTiON: �S` S � 2 S 9. O O COST/REVENUE BUDGETED (CIRCLE ONE) YES NO
ASSESSMEN'PS
INGSOURCE: ' �1�052.00 Golden Rule B�.dg ACTIVITYNUMBER:
$4,207.00 Minn Mutual Life . �,,, �
OUP�CI. .L��. ELne v+.s� .
ANC7AL INFORMATION: (EXPLAIPn �� � � ���
9
�
po_a�q
SUMMAI2Y OF ENGINEERING RECOMNYENDATIONS
7anuary 11, 2000
Project
Installation of a globe style street lighting system on Robert Sffeet from E. 7�' Place to E. 7`� Sffeet.
Iniriating Action
The project was initiated by the property owners of the Golden Rule Building.
E�sting Condifions
Lighting in this azea is now provided by bent straw street lights.
Proposed Improvements
Installa6on of 3 three fixture globe lights and 2 five fixture globe street lights.
Positive Benefits
This will be an attractive lighting system which will provide an adequate amount of light with an
acceptable uniformiry of distribution. This project will enhance the aesthetics of the azea..
Adverse Effects
As with all new lighting systems, there will be some increased maintenance and operating costs to the
abutting property owner.
Tnne Schedule
System is currently in use.
Cost Estimate
Opeiating and xnaintenance $1,051_73
Financing
Assessments
Source of Additional Information
Ken Taillon at 266-6215.
Recommendation
$1,051.73
This proposal is consistent with the City of St. Paul's Lighting Policy. The Department recommends
approval of this project.
Respectfully submitted,
Thomas J. Eggum
Director
Oo -a�9
SUNIMARY OF ENGINEERING RECOMMENDATIONS
January 11, 2000
Project
Installation of a globe style street lighting system on Robert Street from E. 7`" Place to 6`" Street, 6`� Street
from Robert Street to Minnesota Saeet, Minnesota Street from 6'� Street to E. '7"' Place and E. 7'" Place
from Minnesota Street to Robert Sueet.
Initiating Action
The project was initiated by the property owners of the Minnesota Life Building.
Existing Conditions
Lighting in this area is currently provided by bent straw street lights.
Proposed Improvements
Installation of 12 tYixee fixture globe lights and 8 five fixture globe lights.
Posifive Benetits
This will be an attractive lighting system which will pxovide an adequate amount of light with an
acceptable unifornuty of distribution. This project will enhance the aesthetics of the area..
Adverse Effects
As with all new lighting systems, there will be some increased maintenance and operating costs to the
abutting property owner.
Time Schedule
Construction in 2000..
Cost Estimate
Operating and maintenance $4,206.93
l�nancing
Assessments
Source of Additional Information
Ken Taillon at 266-6215.
$A,206.93
Recommendation
This proposal is consistent with the City of St. PauP s Lighting Policy. The Department recommends
approval of this project.
Respectfully submitted,
Thomas J. Eggum
Director
� �
� �
���
\• ✓
,S- � ��
\� �
/ n :
\� \
W
� �
� j
��
�
� ���
\ .�
� �
/ �'�-�,
s�
�� ti�
a \�� �
�- �
��
w Z
m �
�� w
.
Z
\ O �
�
� �
,
\,
� Y
a
: . �.
\
��
� �
w
Q J
O Q W
Z� F-
Z
� � U
w .
o��
0
O��
.'
�
U Uw°
�1 � �
F- �-
� =��
z�o
� �r
�
ti��
. c'
�
� � D �A
��� �
w
J �
U
� Z o
�
►
. ,�
�,
a�
C� w �
w L- O
a� � ;
�\ �
m �
� \ � W
�����
�O�
Q �
t�!'3
� W
ti U
0
�� .
�
�Z
� _Z
Z�
��
O
O�
/
�
y ��
CITX OF ST. PAUL
PRELIMINARY ORDER
ORIGINAL
�.1flD �p.a�
�
File No. 18925
Voting WarB 2
In the Matter of the Operation Costs of the Above Standard Street Lighting
System for 2000 for the following project:
West side of North Robert Street from East 6`" Street to East 7"' Street;
South side East 7` Place from North Robert Street to Minnesota Street;
East side Minnesota Street from East 7 Place to East 6 Street;
North side East 6` Street from Minnesota Street to North Robert Street;
To be known as the Minnesota Mutual Life Tower Area.
The Council of the City of Saint Paul having received the report of the
Mayor upon the above improvement, and having considered said report, hereby
resolves:
1. That the said report and the same is hereby approve with no
alternatives, and that the estimated cost thereof is $5,259.00, financed by
assessments only.
2. That a public hearing be had on said improvement on the 22nd dav of
March, 2000. at 5:30 o'clock n.m., in the Council Chambers of the City Hall
and Court House Building in the City of Saint Paul.
3. That notice of said public hearing be given to the persons and in the
manner provided by the Charter, stating the time and place of hearing, the
nature of the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
✓Benanav
�/Blakey
,/Bostrom
,/Coleman
,�Iarris
,,Lantry
,/Aeiter
� In Favor
� Against
Adopted by the Council: Date ��n. �- � �a o
�
Certified Passed by the Council Secretary
By 1 \ � � — �c.v�t\ �--�—���
Mayor
City of St. Paul
FINAL ORDER
ORIGINAL
C -?g'�j
CO F � N . !,�
�� j
B
File No. 18925
Voting Ward 2
In the Matter of the Operation Costs o£ the Above Standard Street Lighting
System for the months of January thru December, 2000 for the following:
West side of North Robert Street from East 6 Street to East 7 Street;
South side East 7 Place from North Robert Street to Minnesota Street;
East side Minnesota Street from East 7"' Place to East 6 Street;
North side East 6"' Street from Minnesota Street to North Robert Street;
To be known as the Minnesota Mutual Life Tower Area.
under Preliminary Order C�� — 1�� approved �.�. � aoc�c�
�
The Council of the City of Saint Paul has conducted a public hearing
upon the above improvement, due notice thereof having been given as
prescribed by the City Charter; and
WHEREAS, The Council has heard all persons, objections and
recommendations pertaining to said proposed improvement and has fully
considered the same; now, therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order
that the above-described improvemen.t be made, and the proper City officers
are hereby directed and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the
proper City officers shall calculate all expenses incurred therein and shall
report the same to the City Council in accordance with Chapter 14 of the City
Charter.
COUNCILPERSON
Yeas Nays
ASp 5�,,.,�Benanav
✓Blakey
J ostrom
�oleman
✓Ffarris
, /�antry
�iter
� In Favor
� Against
� ���`c
Adopted by the Council: Aate��, �e3 8�
Certified Passed by the Council Secretary
By �� —
�i�.,� �o����
Ma or
�/z/�
Public Hearin : 03/22/00 G'°Ooa
T.M.S./REAL ESTATE DIVISION Da�� Q t�� R�� v Green Sheet Number: � Q2712
DEPARTMENI' DIItECfOR C1'1'Y COUNCII.
ontact Person aud Phone Nnmber.
� ''777 �� ' "' ° ' 0101 Cfl'Y ATTORNEY CITY CLERK
Bl,� T� 266-6215 BUDGET DII2ECfOR TECE & MGT- SVG DIIt
i��" X
v MAYOR(ORASSLSTANT) 1 COUNCD,RF.SEARCH
/� A� ��d�
OTAL # OF SIGNATORE PAGES (CLIP ALL LOCATIONS FOR SIGNATURE)
CTION REQUESTED:
ettiag date of public heariag for the estimated operating costs for an above
standard street light project for 2000. (Golden Rule Bldg & Minnesota Mutual
ife Towar)
ile No. 18925
COMMENDATIONS: APPROVE (A) OR RE.iECT (R) ERSONAL SEAVICE CONTRACTS MUST ANSWER THE FOLLOWING:
. Has the person/Firm ever worked mder a contract for this depar[ment? YES NO
PLANNING COMMISSION A STAFF
. Has tLis person/t`vm ever been a City employee? YES NO
CNII, SERVICE COMMISSION
. Does this persodFirm possess a slrill not normally possessed by any YES NO
CIB COMMITTEE current City employee?
Explain all YES aaswers on a separate sheet and attach.
TING YROBLEM, ISS[SE, OPPORTUHITY (Who, What, When, Where, Why°):
blic hearing is necessary to approve the estimated annual operating costs for the above standard lighting
roject
VANTAGES IF APPROVED:
ame as above.
- ISADVANTAGESIFAPPROVED:
enefitted property owners will have assessments payable via property taxes.
ISADVANTAGES IF NOT APPROVED:
he City would have to pay the costs.
OTAL AMOUNT' OF 1`RANSACTiON: �S` S � 2 S 9. O O COST/REVENUE BUDGETED (CIRCLE ONE) YES NO
ASSESSMEN'PS
INGSOURCE: ' �1�052.00 Golden Rule B�.dg ACTIVITYNUMBER:
$4,207.00 Minn Mutual Life . �,,, �
OUP�CI. .L��. ELne v+.s� .
ANC7AL INFORMATION: (EXPLAIPn �� � � ���
9
�
po_a�q
SUMMAI2Y OF ENGINEERING RECOMNYENDATIONS
7anuary 11, 2000
Project
Installation of a globe style street lighting system on Robert Sffeet from E. 7�' Place to E. 7`� Sffeet.
Iniriating Action
The project was initiated by the property owners of the Golden Rule Building.
E�sting Condifions
Lighting in this azea is now provided by bent straw street lights.
Proposed Improvements
Installa6on of 3 three fixture globe lights and 2 five fixture globe street lights.
Positive Benefits
This will be an attractive lighting system which will provide an adequate amount of light with an
acceptable uniformiry of distribution. This project will enhance the aesthetics of the azea..
Adverse Effects
As with all new lighting systems, there will be some increased maintenance and operating costs to the
abutting property owner.
Tnne Schedule
System is currently in use.
Cost Estimate
Opeiating and xnaintenance $1,051_73
Financing
Assessments
Source of Additional Information
Ken Taillon at 266-6215.
Recommendation
$1,051.73
This proposal is consistent with the City of St. Paul's Lighting Policy. The Department recommends
approval of this project.
Respectfully submitted,
Thomas J. Eggum
Director
Oo -a�9
SUNIMARY OF ENGINEERING RECOMMENDATIONS
January 11, 2000
Project
Installation of a globe style street lighting system on Robert Street from E. 7`" Place to 6`" Street, 6`� Street
from Robert Street to Minnesota Saeet, Minnesota Street from 6'� Street to E. '7"' Place and E. 7'" Place
from Minnesota Street to Robert Sueet.
Initiating Action
The project was initiated by the property owners of the Minnesota Life Building.
Existing Conditions
Lighting in this area is currently provided by bent straw street lights.
Proposed Improvements
Installation of 12 tYixee fixture globe lights and 8 five fixture globe lights.
Posifive Benetits
This will be an attractive lighting system which will pxovide an adequate amount of light with an
acceptable unifornuty of distribution. This project will enhance the aesthetics of the area..
Adverse Effects
As with all new lighting systems, there will be some increased maintenance and operating costs to the
abutting property owner.
Time Schedule
Construction in 2000..
Cost Estimate
Operating and maintenance $4,206.93
l�nancing
Assessments
Source of Additional Information
Ken Taillon at 266-6215.
$A,206.93
Recommendation
This proposal is consistent with the City of St. PauP s Lighting Policy. The Department recommends
approval of this project.
Respectfully submitted,
Thomas J. Eggum
Director
� �
� �
���
\• ✓
,S- � ��
\� �
/ n :
\� \
W
� �
� j
��
�
� ���
\ .�
� �
/ �'�-�,
s�
�� ti�
a \�� �
�- �
��
w Z
m �
�� w
.
Z
\ O �
�
� �
,
\,
� Y
a
: . �.
\
��
� �
w
Q J
O Q W
Z� F-
Z
� � U
w .
o��
0
O��
.'
�
U Uw°
�1 � �
F- �-
� =��
z�o
� �r
�
ti��
. c'
�
� � D �A
��� �
w
J �
U
� Z o
�
►
. ,�
�,
a�
C� w �
w L- O
a� � ;
�\ �
m �
� \ � W
�����
�O�
Q �
t�!'3
� W
ti U
0
�� .
�
�Z
� _Z
Z�
��
O
O�
/
�
y ��
CITX OF ST. PAUL
PRELIMINARY ORDER
ORIGINAL
�.1flD �p.a�
�
File No. 18925
Voting WarB 2
In the Matter of the Operation Costs of the Above Standard Street Lighting
System for 2000 for the following project:
West side of North Robert Street from East 6`" Street to East 7"' Street;
South side East 7` Place from North Robert Street to Minnesota Street;
East side Minnesota Street from East 7 Place to East 6 Street;
North side East 6` Street from Minnesota Street to North Robert Street;
To be known as the Minnesota Mutual Life Tower Area.
The Council of the City of Saint Paul having received the report of the
Mayor upon the above improvement, and having considered said report, hereby
resolves:
1. That the said report and the same is hereby approve with no
alternatives, and that the estimated cost thereof is $5,259.00, financed by
assessments only.
2. That a public hearing be had on said improvement on the 22nd dav of
March, 2000. at 5:30 o'clock n.m., in the Council Chambers of the City Hall
and Court House Building in the City of Saint Paul.
3. That notice of said public hearing be given to the persons and in the
manner provided by the Charter, stating the time and place of hearing, the
nature of the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
✓Benanav
�/Blakey
,/Bostrom
,/Coleman
,�Iarris
,,Lantry
,/Aeiter
� In Favor
� Against
Adopted by the Council: Date ��n. �- � �a o
�
Certified Passed by the Council Secretary
By 1 \ � � — �c.v�t\ �--�—���
Mayor