99-871CITY OF ST. PAUL
FINAL ORDER
ORIGINaL
�o��� o. R9
BY
FILE NO. 18906
VOTING WARD 2
3�
In the Matter of improving Kellogg Boulevard from Cedar to 7" Street with concrete
curb, a new concrete block suifaced roadway, concrete block sidewalks, concrete
driveway aprons, tree planting, an irrigation system, � sewer service
connections and reconnections and reconstruction of globe lighting system.
under Preliminary
The Council of the City of Saint Paul has conducted a publiL� hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recoznmendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSONS
Yeas Nays
f/�enanav
vB3akey
�strom
Coleman — ��DSev��
�rris
Lantry — ��s�v��"
lil�eiter
Adopted by Council: Date����``\
�
Certified Passed by Council Secretary
�In Favor
� Against
a �bs�.�.�
���
Public Hearin Date Re uested: Se tember 8,1999 ��-�6-�
T.M.S./REAL ESTATE DIVISION Date: Green Sheet Number: 09434
ontact Person and Phone Number: EPARTMENT DIRECI'OR CI1'Y CO[7NCII.
C (:HEHOURI (PB.W%S) 26G-G226
ITY ATTORNEY ITY CI.ERK ,
UDGETDQtECI'OR FFICEOFFINANCiAI.SVCS.
ust be on ComN Agenda by: �I-ZII-I9 yOR (OR ASSISfAN1') 1 COUNCII, AFSEARCf1
OTAL # OF SIGNATL7RE PAGES 1 cci.� ni.r. i,oca�noxs Fox sicxnzvxE�
CTION REQUESTED:
et Public Aearing date for public street impmvements.
pprove improvements for Kellogg Boulevard from Cedar to 7th Street (Wabasha West Phase In. TMS Project 18906
COMMENDATIONS: APPAOVE (A) OR REJECT (R) ERSONAL SERVICE CONTRACTS M[JST ANSWER THE FOLLOWING:
. Has the person/firm ever worked under a contract for this deparhnent? YES NO
PWNNINCCOMMiSSION A STAFF
. Has this person/f rm ever been a City employee? YES NO
crvn, seav�ce com�ss�on
. Does this personlfirm possess a skitl not normally possessed by any YES NO
curlent City employee?
CB COMMl]1'F.E
lain all YES answers on a se arate sheet and attach.
UPPORTS WIIICH COUNCIL OB7ECTIVE?
COUNCIL WARD(S) 7 DISTRICT PLANNING COL3NCII. �/
TING PROBLEM, ISSUE, OPPORT11n'ITI (Whq What, When, Where, Why?):
he street and sidewalk on Sibley Street are in fair to poor condition due to age and utility patchwork..
he railroad bridge at Sibley and Warner Rd. is in very poor condition and poor lighting.
VANTAGES IF APPROVED:
A better, more pedestrian freindly street with more trees.
ISADVANTAGES IF APPROVED:
ormal problems associated with construction, such as noise, dust and general disruptions.
ISADVANTAGES IF NOT APPROVED:
'The street will continue to deteriorate and downtown development standards would not be me�
OTAL AMOUNT OF TRANSACTION: $9gO�OOO.00 COSTIREVF.NOE BUDGETED (CIRCLE ON� YFS NO
ING SOURCE: SCC BQIOW ACTIVITY NUNLBER:
ANCIAL IIVFORMe1TION: (EXPLAII�
CIB $ 50,000.00 Lower Town Development $ 6A,000.00 c�� ��� ��`�
MSA 54,000.00
ICETEA 6au,000.00 Assessments iso,000.00 JUL 1 9 1999
aa-r��
Summary of Engineering Recommendations
Wabasha West DTSVP Phase R
City Project No. P-1190
Report Prepared - 07/02l99
Public Hearing -
PROJECT:
Construction of concrete curb, new concrete block surfaced roadway, concrete block sidewalks,
concrete driveway aprons, tree planting, irrigation system, water and sewer service connections
and reconnections and reconstruction of globe lighting system.
ExistinQ Conditions
The existing streets in the downtown project area include concrete base at approximately six (6)
inches and bituminous with a range from three (3) inches to twelve (12) inches.
All streets have concrete curb. The bituminous street surfaces are in fair to poor condition.
Streets constructed in 1932 were resurfaced in 1985 and aze showing signs of deterioration due to
age and utility patchwork.
Sidewalks are being reconstructed sporadically due to new development (Science Museum,
Hockey Arena and new River Cenue).
Proposed Improvements
Improve to following street by constructing concrete curbs, stamped concrete sidewalk, planting
new trees, new drainage system, reinstall existing globe ligh6ng system, concrete driveway
aprons and concrete/brick streets:
Kellogg Blvd - Cedar to Seventh Street
Altemates
To do nothing would send the wrong message to new development ihat is in progress such as the
Science Museum, hockey arena and River Centre, and to future development.
Positive Effects
The construction of railings in the mediam will make Kellogg safer for pedestrians who might try
to cross the street. General improvement of the public right-of-way will enhance and add quality
to the downtown businesses, making it more inviting to outside visitors. Wider sidewalks will
make the street more pedestrian friendly and add room to outside cafe's.
a
� l` �� �
Adverse Effects
Normai problems associated with construction such as noise, dust and general disruption will be
present.
Effects on Trees
In a hatsh downtown environment, the new irrigation system will enhance the growth of the trees
and help with their survival for a longer life.
Time Schedule
the project will begin May of 2000 and will be completed by late fall of 2000. There will be
restrictions on the amount of time work is done on individual segments of the streets.
Cost Estimate
Construction
Engineering
Misceilaneous
TOTAL
$1,946,000
574,500
280.000
$2,800,000
EstimaYed Financine
ICTE
MSA
Assessments
TOTAL
$1,400,000
1,050,000
350.000
$2,800,000
Assessment rate for street paving, landscaping and ]ighting (The foilowing 1999 rated wiil be
adjusted for inflation for use on 2000 projects):
$150 per assessable foot for the street paving and landscaping
Source of Additional Information
For additional information, contact R�c Chehouri, Project Manager, at (651)266-6226.
2
a
�[q-p� �
Summarv and Recommendations
the Depaztment of Public Works feels that this is a necessary and worthwhile project and the
Engineering Recommendation is for approval of the project and financing.
3
. . � �q-�'Il
u
CITY OF ST. PAVL
PRELIMINARY ORDER
ORIGINAL
�o�� o. I
BY I
FILE NO. 18906
VOTING WARD 2 __.
�9• 8�? (
��
In the Matter of improving Kellogg Boulevard from Cedar to 7"` Street with concrete
curb, a new concrete block surfaced roadway, concrete block sidewalks, concrete
driveway aprons, tree plantirig, an irrigation system, � sewer service
connections and reconnections and reconstruction of globe lighting system.
The Council of the City of Saint Paul having received the report of the Mayor
upon the above improvement, and having considered said report, hereby resolves:
1. That the said report and the same is hereby approved with no alternatives, and
that the estimated cost thereof is $2,800,000.00 financed by project funds and
assessments.
2. That a public hearing be had on said improvement on the 87H dav o£ Sentember,
1999,at 5:30 o'clock P.M., in the Council Chambers of the City Hall and Court
House Building in the City of Saint Paul.
3. That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
�nanav
✓l�lakey
�Sostrom
�oleman
Harr i s— YY�b���..'�
'�'Lantry
�iter
Adopted by Council: DateC��� V ��
�
Certified Passed by Council Secretary
6 In Favor By�� c� -��� ,�.�
�Against
� 'F�bS<h�
Mayor
CITY OF ST. PAUL
FINAL ORDER
ORIGINaL
�o��� o. R9
BY
FILE NO. 18906
VOTING WARD 2
3�
In the Matter of improving Kellogg Boulevard from Cedar to 7" Street with concrete
curb, a new concrete block suifaced roadway, concrete block sidewalks, concrete
driveway aprons, tree planting, an irrigation system, � sewer service
connections and reconnections and reconstruction of globe lighting system.
under Preliminary
The Council of the City of Saint Paul has conducted a publiL� hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recoznmendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSONS
Yeas Nays
f/�enanav
vB3akey
�strom
Coleman — ��DSev��
�rris
Lantry — ��s�v��"
lil�eiter
Adopted by Council: Date����``\
�
Certified Passed by Council Secretary
�In Favor
� Against
a �bs�.�.�
���
Public Hearin Date Re uested: Se tember 8,1999 ��-�6-�
T.M.S./REAL ESTATE DIVISION Date: Green Sheet Number: 09434
ontact Person and Phone Number: EPARTMENT DIRECI'OR CI1'Y CO[7NCII.
C (:HEHOURI (PB.W%S) 26G-G226
ITY ATTORNEY ITY CI.ERK ,
UDGETDQtECI'OR FFICEOFFINANCiAI.SVCS.
ust be on ComN Agenda by: �I-ZII-I9 yOR (OR ASSISfAN1') 1 COUNCII, AFSEARCf1
OTAL # OF SIGNATL7RE PAGES 1 cci.� ni.r. i,oca�noxs Fox sicxnzvxE�
CTION REQUESTED:
et Public Aearing date for public street impmvements.
pprove improvements for Kellogg Boulevard from Cedar to 7th Street (Wabasha West Phase In. TMS Project 18906
COMMENDATIONS: APPAOVE (A) OR REJECT (R) ERSONAL SERVICE CONTRACTS M[JST ANSWER THE FOLLOWING:
. Has the person/firm ever worked under a contract for this deparhnent? YES NO
PWNNINCCOMMiSSION A STAFF
. Has this person/f rm ever been a City employee? YES NO
crvn, seav�ce com�ss�on
. Does this personlfirm possess a skitl not normally possessed by any YES NO
curlent City employee?
CB COMMl]1'F.E
lain all YES answers on a se arate sheet and attach.
UPPORTS WIIICH COUNCIL OB7ECTIVE?
COUNCIL WARD(S) 7 DISTRICT PLANNING COL3NCII. �/
TING PROBLEM, ISSUE, OPPORT11n'ITI (Whq What, When, Where, Why?):
he street and sidewalk on Sibley Street are in fair to poor condition due to age and utility patchwork..
he railroad bridge at Sibley and Warner Rd. is in very poor condition and poor lighting.
VANTAGES IF APPROVED:
A better, more pedestrian freindly street with more trees.
ISADVANTAGES IF APPROVED:
ormal problems associated with construction, such as noise, dust and general disruptions.
ISADVANTAGES IF NOT APPROVED:
'The street will continue to deteriorate and downtown development standards would not be me�
OTAL AMOUNT OF TRANSACTION: $9gO�OOO.00 COSTIREVF.NOE BUDGETED (CIRCLE ON� YFS NO
ING SOURCE: SCC BQIOW ACTIVITY NUNLBER:
ANCIAL IIVFORMe1TION: (EXPLAII�
CIB $ 50,000.00 Lower Town Development $ 6A,000.00 c�� ��� ��`�
MSA 54,000.00
ICETEA 6au,000.00 Assessments iso,000.00 JUL 1 9 1999
aa-r��
Summary of Engineering Recommendations
Wabasha West DTSVP Phase R
City Project No. P-1190
Report Prepared - 07/02l99
Public Hearing -
PROJECT:
Construction of concrete curb, new concrete block surfaced roadway, concrete block sidewalks,
concrete driveway aprons, tree planting, irrigation system, water and sewer service connections
and reconnections and reconstruction of globe lighting system.
ExistinQ Conditions
The existing streets in the downtown project area include concrete base at approximately six (6)
inches and bituminous with a range from three (3) inches to twelve (12) inches.
All streets have concrete curb. The bituminous street surfaces are in fair to poor condition.
Streets constructed in 1932 were resurfaced in 1985 and aze showing signs of deterioration due to
age and utility patchwork.
Sidewalks are being reconstructed sporadically due to new development (Science Museum,
Hockey Arena and new River Cenue).
Proposed Improvements
Improve to following street by constructing concrete curbs, stamped concrete sidewalk, planting
new trees, new drainage system, reinstall existing globe ligh6ng system, concrete driveway
aprons and concrete/brick streets:
Kellogg Blvd - Cedar to Seventh Street
Altemates
To do nothing would send the wrong message to new development ihat is in progress such as the
Science Museum, hockey arena and River Centre, and to future development.
Positive Effects
The construction of railings in the mediam will make Kellogg safer for pedestrians who might try
to cross the street. General improvement of the public right-of-way will enhance and add quality
to the downtown businesses, making it more inviting to outside visitors. Wider sidewalks will
make the street more pedestrian friendly and add room to outside cafe's.
a
� l` �� �
Adverse Effects
Normai problems associated with construction such as noise, dust and general disruption will be
present.
Effects on Trees
In a hatsh downtown environment, the new irrigation system will enhance the growth of the trees
and help with their survival for a longer life.
Time Schedule
the project will begin May of 2000 and will be completed by late fall of 2000. There will be
restrictions on the amount of time work is done on individual segments of the streets.
Cost Estimate
Construction
Engineering
Misceilaneous
TOTAL
$1,946,000
574,500
280.000
$2,800,000
EstimaYed Financine
ICTE
MSA
Assessments
TOTAL
$1,400,000
1,050,000
350.000
$2,800,000
Assessment rate for street paving, landscaping and ]ighting (The foilowing 1999 rated wiil be
adjusted for inflation for use on 2000 projects):
$150 per assessable foot for the street paving and landscaping
Source of Additional Information
For additional information, contact R�c Chehouri, Project Manager, at (651)266-6226.
2
a
�[q-p� �
Summarv and Recommendations
the Depaztment of Public Works feels that this is a necessary and worthwhile project and the
Engineering Recommendation is for approval of the project and financing.
3
. . � �q-�'Il
u
CITY OF ST. PAVL
PRELIMINARY ORDER
ORIGINAL
�o�� o. I
BY I
FILE NO. 18906
VOTING WARD 2 __.
�9• 8�? (
��
In the Matter of improving Kellogg Boulevard from Cedar to 7"` Street with concrete
curb, a new concrete block surfaced roadway, concrete block sidewalks, concrete
driveway aprons, tree plantirig, an irrigation system, � sewer service
connections and reconnections and reconstruction of globe lighting system.
The Council of the City of Saint Paul having received the report of the Mayor
upon the above improvement, and having considered said report, hereby resolves:
1. That the said report and the same is hereby approved with no alternatives, and
that the estimated cost thereof is $2,800,000.00 financed by project funds and
assessments.
2. That a public hearing be had on said improvement on the 87H dav o£ Sentember,
1999,at 5:30 o'clock P.M., in the Council Chambers of the City Hall and Court
House Building in the City of Saint Paul.
3. That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
�nanav
✓l�lakey
�Sostrom
�oleman
Harr i s— YY�b���..'�
'�'Lantry
�iter
Adopted by Council: DateC��� V ��
�
Certified Passed by Council Secretary
6 In Favor By�� c� -��� ,�.�
�Against
� 'F�bS<h�
Mayor
CITY OF ST. PAUL
FINAL ORDER
ORIGINaL
�o��� o. R9
BY
FILE NO. 18906
VOTING WARD 2
3�
In the Matter of improving Kellogg Boulevard from Cedar to 7" Street with concrete
curb, a new concrete block suifaced roadway, concrete block sidewalks, concrete
driveway aprons, tree planting, an irrigation system, � sewer service
connections and reconnections and reconstruction of globe lighting system.
under Preliminary
The Council of the City of Saint Paul has conducted a publiL� hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recoznmendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSONS
Yeas Nays
f/�enanav
vB3akey
�strom
Coleman — ��DSev��
�rris
Lantry — ��s�v��"
lil�eiter
Adopted by Council: Date����``\
�
Certified Passed by Council Secretary
�In Favor
� Against
a �bs�.�.�
���
Public Hearin Date Re uested: Se tember 8,1999 ��-�6-�
T.M.S./REAL ESTATE DIVISION Date: Green Sheet Number: 09434
ontact Person and Phone Number: EPARTMENT DIRECI'OR CI1'Y CO[7NCII.
C (:HEHOURI (PB.W%S) 26G-G226
ITY ATTORNEY ITY CI.ERK ,
UDGETDQtECI'OR FFICEOFFINANCiAI.SVCS.
ust be on ComN Agenda by: �I-ZII-I9 yOR (OR ASSISfAN1') 1 COUNCII, AFSEARCf1
OTAL # OF SIGNATL7RE PAGES 1 cci.� ni.r. i,oca�noxs Fox sicxnzvxE�
CTION REQUESTED:
et Public Aearing date for public street impmvements.
pprove improvements for Kellogg Boulevard from Cedar to 7th Street (Wabasha West Phase In. TMS Project 18906
COMMENDATIONS: APPAOVE (A) OR REJECT (R) ERSONAL SERVICE CONTRACTS M[JST ANSWER THE FOLLOWING:
. Has the person/firm ever worked under a contract for this deparhnent? YES NO
PWNNINCCOMMiSSION A STAFF
. Has this person/f rm ever been a City employee? YES NO
crvn, seav�ce com�ss�on
. Does this personlfirm possess a skitl not normally possessed by any YES NO
curlent City employee?
CB COMMl]1'F.E
lain all YES answers on a se arate sheet and attach.
UPPORTS WIIICH COUNCIL OB7ECTIVE?
COUNCIL WARD(S) 7 DISTRICT PLANNING COL3NCII. �/
TING PROBLEM, ISSUE, OPPORT11n'ITI (Whq What, When, Where, Why?):
he street and sidewalk on Sibley Street are in fair to poor condition due to age and utility patchwork..
he railroad bridge at Sibley and Warner Rd. is in very poor condition and poor lighting.
VANTAGES IF APPROVED:
A better, more pedestrian freindly street with more trees.
ISADVANTAGES IF APPROVED:
ormal problems associated with construction, such as noise, dust and general disruptions.
ISADVANTAGES IF NOT APPROVED:
'The street will continue to deteriorate and downtown development standards would not be me�
OTAL AMOUNT OF TRANSACTION: $9gO�OOO.00 COSTIREVF.NOE BUDGETED (CIRCLE ON� YFS NO
ING SOURCE: SCC BQIOW ACTIVITY NUNLBER:
ANCIAL IIVFORMe1TION: (EXPLAII�
CIB $ 50,000.00 Lower Town Development $ 6A,000.00 c�� ��� ��`�
MSA 54,000.00
ICETEA 6au,000.00 Assessments iso,000.00 JUL 1 9 1999
aa-r��
Summary of Engineering Recommendations
Wabasha West DTSVP Phase R
City Project No. P-1190
Report Prepared - 07/02l99
Public Hearing -
PROJECT:
Construction of concrete curb, new concrete block surfaced roadway, concrete block sidewalks,
concrete driveway aprons, tree planting, irrigation system, water and sewer service connections
and reconnections and reconstruction of globe lighting system.
ExistinQ Conditions
The existing streets in the downtown project area include concrete base at approximately six (6)
inches and bituminous with a range from three (3) inches to twelve (12) inches.
All streets have concrete curb. The bituminous street surfaces are in fair to poor condition.
Streets constructed in 1932 were resurfaced in 1985 and aze showing signs of deterioration due to
age and utility patchwork.
Sidewalks are being reconstructed sporadically due to new development (Science Museum,
Hockey Arena and new River Cenue).
Proposed Improvements
Improve to following street by constructing concrete curbs, stamped concrete sidewalk, planting
new trees, new drainage system, reinstall existing globe ligh6ng system, concrete driveway
aprons and concrete/brick streets:
Kellogg Blvd - Cedar to Seventh Street
Altemates
To do nothing would send the wrong message to new development ihat is in progress such as the
Science Museum, hockey arena and River Centre, and to future development.
Positive Effects
The construction of railings in the mediam will make Kellogg safer for pedestrians who might try
to cross the street. General improvement of the public right-of-way will enhance and add quality
to the downtown businesses, making it more inviting to outside visitors. Wider sidewalks will
make the street more pedestrian friendly and add room to outside cafe's.
a
� l` �� �
Adverse Effects
Normai problems associated with construction such as noise, dust and general disruption will be
present.
Effects on Trees
In a hatsh downtown environment, the new irrigation system will enhance the growth of the trees
and help with their survival for a longer life.
Time Schedule
the project will begin May of 2000 and will be completed by late fall of 2000. There will be
restrictions on the amount of time work is done on individual segments of the streets.
Cost Estimate
Construction
Engineering
Misceilaneous
TOTAL
$1,946,000
574,500
280.000
$2,800,000
EstimaYed Financine
ICTE
MSA
Assessments
TOTAL
$1,400,000
1,050,000
350.000
$2,800,000
Assessment rate for street paving, landscaping and ]ighting (The foilowing 1999 rated wiil be
adjusted for inflation for use on 2000 projects):
$150 per assessable foot for the street paving and landscaping
Source of Additional Information
For additional information, contact R�c Chehouri, Project Manager, at (651)266-6226.
2
a
�[q-p� �
Summarv and Recommendations
the Depaztment of Public Works feels that this is a necessary and worthwhile project and the
Engineering Recommendation is for approval of the project and financing.
3
. . � �q-�'Il
u
CITY OF ST. PAVL
PRELIMINARY ORDER
ORIGINAL
�o�� o. I
BY I
FILE NO. 18906
VOTING WARD 2 __.
�9• 8�? (
��
In the Matter of improving Kellogg Boulevard from Cedar to 7"` Street with concrete
curb, a new concrete block surfaced roadway, concrete block sidewalks, concrete
driveway aprons, tree plantirig, an irrigation system, � sewer service
connections and reconnections and reconstruction of globe lighting system.
The Council of the City of Saint Paul having received the report of the Mayor
upon the above improvement, and having considered said report, hereby resolves:
1. That the said report and the same is hereby approved with no alternatives, and
that the estimated cost thereof is $2,800,000.00 financed by project funds and
assessments.
2. That a public hearing be had on said improvement on the 87H dav o£ Sentember,
1999,at 5:30 o'clock P.M., in the Council Chambers of the City Hall and Court
House Building in the City of Saint Paul.
3. That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
�nanav
✓l�lakey
�Sostrom
�oleman
Harr i s— YY�b���..'�
'�'Lantry
�iter
Adopted by Council: DateC��� V ��
�
Certified Passed by Council Secretary
6 In Favor By�� c� -��� ,�.�
�Against
� 'F�bS<h�
Mayor