Loading...
99-790ORIGINAL CITY OF ST. PAUL FINAL ORDSR �� co iL = ° l�l - ��O B FILS NO. 18891 VOTING WARD 3 In the Matter of improving the alley in Block 3, Ryan Place (Bounded by Randolph, Mount Curve, Hartford, and Mississippi Blvd.) by constructing storm sewer and by grading and paving with a bituminous material. under Preliminary Order approved The Council of the City of Saint Pau1 has conducted a public hearing upon the above improvement, due notice thereof having been given as prescribed by the City Charter; and WHEREAS, The Council has heard a11 persons, objections and recommendations pertaining to said proposed improvement ancl has fully considered the same; now, therefore, be it RESOLVED, That the Council of the City of Saint Pau1 does hereby order that the above-described improvement be made, and the proper City officers are hereby directed and authorized to proceed with the improvement; and be it FURTHER RESOLVED, That upon the completion of said improvement, the proper City officers shall calculate all expenses incurred therein and shall report the same to the City Council in accordance with Chapter 14 of the City Charter. COUNCILPERSON Yea Nay fBenanav Adopted by the Date: �� l� ��q9 Certified Passes by Council Secretary ✓ Blakey Bostrom—��,� � � By �Co l eman �°� �Harris d Against ��Lantry , ����� ��Reiter Public Hearing : August 11, 1499 T.M.S.IREAL ESTATE DIVISION :oatact ParsOa aa8 PhoAa Number: Paul St. Martia 266-6118 Qust be on Counril Agenda by: Alreadp done �ost be in Comcil Research Office �p nuon on Ftidap 7!9/1999 .� 5'�' Date: w�uww � �� r 7/9/99 Green Sheet Number: 09438 HTt1TffiPt DIR%CTOR 2 ITY CdQNCZL xxr axxo�x xxr cus�ex 1 �# OF SIGNATURE PAGFS (CLIP ALL LOCATIONS FOR SIGNATURE) v�Quxs�rcn: Improve the alley in BLOCIC 3, RYAN PLACE (Bounded by Hartford, ,issippi 81vd., Randolph and Mouat Curve Blvd.) by coastructing storm sewer by grading and paving with a bituminous material Project # 18891. PLANNA'G COMM[SSION CNII. SERVICE COMMLSSION "" `' ERSONAL SERVICE CONTRACTS M[JST ANSWER THE FOLLOWING: . FIas the person/Cu�m ever worked under a coniraM for this deparhuent? YES NO A srnee . Has this personlffrm ever been a City employee? YE,S NO Public Hea1W Does this persoNFrm possess a slull not normally possessed by any YES NO carrent City employee? c�aconcm�n�Ee — Y�„csw�y. Explain a11 YES aaswers on a separate s6eet and attach. 11'ING PROBLEM, ISSUE, OPPORI'ONITY (Who� What� When, Where, Why?): improvement was inifiated by a pefition signed by 81 % of the property owners. NTAGESZFAPPROVED: � will have improved ride, appearance and drainage. rVANTAGESIF APPROVED: such as noise, dust APPBOVED: rIOUNT OF TRANSACTION: �(�7�840 COSTIREVEI3QE BUDGETED (CIRCLE ONE) SOURCE: ASSCSSIT1CIItS OI11V AC77VITYNUMBER: YES 230 be ORfGINAL CITY OF SAINT PAUL Norm Co(eman, Mayor July 8. 1999 Mr. Peter White . Right-of-Way Engineer 140 City Hall Saint Paul, Minnesota 55102 RE: BLOCK 3, RYAN PLACE Dear Mr. White: RECEIVEQ JUL 0 g �g9 REAL ESTqTE D��� Piease take the necessary steps to schedule a public hearing on the following matter: lmprove the alley in BLOCK 3, RYAN PLACE (Bounded by Hartford, Mississippi River B{vd., Randoiph and Mount Curve Blvd.) by constructing storm sewer and grading and paving with bituminous material. Also, condemning and taking an easement in the land necessary for the slopes, cuts and fills, inciuding right of removai of lateral support from subject land or remainder thereof, occasioned by excavations thereof or construction of slopes in the grading and paving of said afley. Attached are a Summary of Engineering Recommendations, an area map, and Green Sheet. This project was laid over indefinitefy at public hearing on February 10, 1999. We have since added storm sewer to the proposal and revised the estimate. The residents wou(d like to have this work completed this year, so I would like you to set up the public hearing as soon as possible. Sincerely, �� ld t R q �o�� Paul St. Martin Civi1 Eng+neer IV PSM:bk Attachments DEPARTMENTOFPUBLICWORKS � Thomas J. Eggum, Directar -� Larry Lueth, Consuuctiors Engineer 25 W. Fourth Street 900 Ciry Ha[I Anne� Telephone: 651-266-6080 Saint Paul, MN 55102-I660 Facsimile: 651-292-b315 Responsive Services �• Quality Facilities • Employee Pride � �RIGINAL _�qa Summary of Engineering Recommendations �� Report Prepared - July 8,1999 Final Order Hearing PRO.TECT: Improve the Alley in Block 3, Ryan Place (bounded by Hartford, Mississippi River Blvd., Randolph and IvIount Curve Blvd.) by constructing storm sewer and a ading and paving with bituminous material. Also, condemning and taking an easement in the land necessary for the slopes and cuts and fills, including righK of removal of lateral support from subject tand or land remainder thereof, occasioned by excavations thereof or construction of slopes in the a ading and paving of said alley. INITIATING ACTION: This improvement was initiated by a petition signed by 81 %o of the property owners. EXISTING CONDITIONS: The alley is platted 20 feet wide. The surface of the alley is oiled. PROPOSEDIMPROVEMENT: Construct storm sewer and grade the alley to a width of 16' and place a hot mix bituminous pavement. ESTIMATED COST AND FINANCING: Estimated ConstrucCion Cost Engineering/Inspection Service Fee Miscellaneous Estimated Total Expenditures $61,500.00 18,460.00 5,54Q.00 I2 300.00 $97,840.00 Financing - Assessments Estimated Rate per Assessable Foot INFORMATIONAL MEETING: Not scheduled yet. $47,840.00 ' il. SOURCE OF ADDITIONAL INFORMATION: For additional iInformation, contact Paul St. Martin at 651-266-6118. SUMMARY OF RECOMMENDATIONS: The Department of Public Works recommends that this project be constructed. Respectfully submitted, Paul St. Mar[in Project Engineer � 1 ..� �) 1�� � r - l 4� / I � � I � �� � � ` V � � �\ � (�) i d ��� � J L � ti N N � „. K � t L � RAN DO L PH qg.��o �.c za , .,s a ,oc.or r` ' �oc zc (,�� i -. �, - �J1_9J ` s 1812t i i + eG • r �. ' Q '27 ��� �It) 2 a • i -'_-- , i9: 1S . r9J.ZL � � �° � z � ■ i '_' ' '� / � � �� - - — — -- L — ' (�t� 3 .-.� � 2r � rz 6d.1 _ � Sl -- l.^0.2[ � ' .. o z9 . - C2� (,�, 4 (��.� z _-- za: s+ _ ,s7.zc e�l _ 3J �3� �rll 5 ��<., _ ` . � __-_'?f: r 2 7 �Jr.2s -_ �- ,., - _ '._ 3f _ _ _ _ _ �_� : 6 - ��•; 3 1 LC9 52 _. �99.25 S2 �:� ��.J 7 (a�� z� ._� _ 2�1 g" 2eL2S 3 S ��� (��> s �___.216 i6 205.:5 �irl °' -��` �_ ' __ _' 3i�_° y.� c ( -'i> 9 �'-l) 3i _ — 2ae 2S 35 (C) (�sJ 10 . '-:. 2ez �y 1i� zs � (-ta> >s �Y= � 3C �7� ��� 11 (+r� 3c '__' 226 u ' _ Z/Y.2S lv°: ' ' — 3Z .�.>.. <3 _ �.) IZ � __ ! ' i 229 SCp ( ��� � r. z ,s,.,_ 3 � C�� ---- • -- ��-- z -- ___3EL_'_ 2 3d �L � , 22o.1V ' F75: _ _ �_ _��2y3.4G / � - - _ � l �� > �� - �47) �9 - 2'3 2 9 _ _ _ 223.,2-Y- . � �c l'i �� ��� `ZB; �S -_--�.!,��-'-. 257 �S L; ----- — -•ct— .zzc.zY � �_ a�� ti �— — �� 91 ---r--IE----- � . �'( . ��� ---zs)cz i zz�.7v M r--, i5a�^,� ` 42 (,o) �� 17 a o(_9 }Z -- � 2s! 3d 232.2Y o �( v ��� - _ _ _ _ _ - - 43 (30� IB � � ; �-- 21S 7$� 23S 2Y �� � L IS. 44 ,u� � �9 � / -- . 295ii 23C ZY l- l S� '�r � � c ., e 45 -'---` ----- •��<�. - ' — reir (3z, 20 302.6r 74/2ro �6Z� '15 � ia Yr � i- tC! = ._ __' r.. a. — ! 3C2�Od ^ �33) zy jlr � f,°l3) �i6 , ��� " IP � /�� _. _ „ 57 � �> _'____ -�2_ _ __ —_' _:/ SS 2�7. 13 � �3-1 G � o; , ` -- -�': :t � — �� 4r �>> ----- 23 �..r, ;5J G � _.�_� Jc/ 03 ._ ._ 2S: ze____^ '_ � ,(� IjS; 3�1 _ �L'� O G �5�� ^ �y_�___ _� —IrfT ____ � COO 'tJ� _ - r `CC F So ` � 3 � 25 � � �� � : t ; Joo z � _S( a/ °' �oe.or Ic++ �. ' �-i �. . .� i + 4: • 99- �9a CITY OF ST. PAI7L FINAL ORDSR OR{G{NAL In In the MaCter o£ improving the alley in Block 3, Ryan Place. (Bounded by Randolph, Mount Curve, Aartford, and Mississippi Blvd. Project # 18891) by grading and paving with a bituminous material. under Preliminary Order 10 ' 1` �+� approved �u • a3 1{`p The Council of the City of Saint Paul has conducted a public hearing upon the above improvement, due notice thereof having been given as prescribed by the City Charter; and WHEREAS, The Council has heard all persons, objections and recommendations pertaining to said proposed improvement and has fully considered the same; now, therefore, be it RESOLVED, That the Council of the City of Saint Paul does hereby order that the above-described improvement be made, and the proper City officers are hereby directed and authorized to proceed with the improvement; and be it FURTHER RESOLVED, That upon the completion of said improvement, the proper City officers shall calculaCe all expenses incurred therein and shall report the same to the City Council in accordance with Chapter 14 of the City Charter. COUNCILPERSON Yea Nay Benanav Blakey Sostrom Coleman Harris Lantry Reiter Against . „ : .. - -,.,� l / �- 1 �.�►�� FILE NO. 18891 VOT=NG WARD - -3- - - Adopted by the Date: Certi£ied Passes by Council Secretary � Mayor y9-�9a Interdepartmental Memorandum CITY OF SAINT PAUL TO: Nancy Anderson "f.i,I:�;J c C;n;�e�. JUL �. 4 i�� From: Peter White �` Right of WaylEngineer 140 City Hall Date: July 9, 1999 Subject: BI:OCK "3, RYAN PI.ACE �� � � M� �� ����� � Please take the necessary steps to schedule a public hearing on the following matter: Improve the alley in BLOCK 3, RXAN PLACE (Bounded by Hartford, Mississippi River Blvd., Randolph and Mount Curve Slvd.) by constructing storm sewer and grading and paving with bituminous material. Also, condemning and taking an easement in the land necessary for the slopes, cuts and fills, including right of removal of lateral support from subject land or remainder thereof, occasioned by excavations thereof or construction of slopes in the grading and paving of said alley. This project was laid over indefinitely at public hearing an February 10, 1999. We have since added stotm sewer to proposal and revised the estimate. The residents would like to have this work completed this year, so I would like you to set up the public hearing for August 11, 1999. P�iblic Heazin : Febru 10, 1999 T.M.S./REAL ESTATE DIVISION Date: ontact Persoa aad Phoae iiumber: Paul St. Martin 266-6118 tust be on Council Agenda by: 1]J23/IS fost be in Councii Research �ce y noon on Friday 19/1U1998 'OTAL # OF SIGNA7'URE PAGES (CLIP ALL LC nrui � �- • 12/10/98 GreenSheetNumber: 38624 ARTAffiNT aZRSCTOR 2 iTY COONCIL ITY ATTOPNSY ITY Q,BR% toa�.ss¢cvrp I r[oNxeQVES�n: Improve the alley in BLOCIC 3, RYAN PLACE (BOUnded by Hartford, ssissippi Blvd., Randolph and Mouat Curve Blvd.) by grading and paving with bituminous material Project # 18891. PLANNWC COh1MISS10N CIVIL SERVICE COMMISSION A SIAFF Public Health .RSONAL SERVICE CANTRACTS MUST ANSWER TAE FOLIAR'ING: � Has the persodfirm ever worked under a contract for Wis department? YES NO Elas tLis person/frm ever been a City�ployee? YES NO Does this persodficm possess a sldll not normally possessed by any YES NO cm comt.�m'ee — v �� B�� �'rent City employee? Ezylain aVl YFS answers on a sepaz2te sheet and aUach. �TING PROBLEM, ISSUE, OPFORTIIIVITY (Who, Whay When, Where, Why?): This improvement was initiated by a petition signed by 81 % of the property owners. VTAGESIFAPPROVED: � will have imoroved ride. anaearance and drainaee. �ANTAGES IF APPROVED: Normal problems associated with �ANTAGES IF NOT APPROVED: will continue to deteriorate. such as noise. dust AMOUNT OF'CRANSACT[ON: �j$ ,259.00 COSTlREVENUE BUDGETED (CIRCLE ONE) IG SOURCE: A55CSSM8IIfS O11I}' ACTIVI'PY NOMBER: 'IAL INFORMATION: (F,XPLAII� . Propertv owners will be notified of the nublic hearing and charees. .y� � g,�es:j t�' !V^° �CSg?fo{ Q�€� .E� 9� 4��� . . _..,.__. .._ - - � -- __' yy-�� �,. CITY OF ST. PAUL PRELIMINARY ORD&R ORIGfNAL 3/ BY I F E I30. �� '���� ���1wi FILL+ NO. 18891 VOTING WARD 3 In the Matter of improving the alley in Block 3, Ryan Place by grading and paving with bituminous material. (Bounded by Randolph, Mount Curve, Hartford, and Mississippi Blvd. project # 18891). The Council of the CiCy of Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: l. That the said report and the same is hereby approved with no alternatives, and that the estimated cost thereof is $ 40788.00 financed by assessments only. 2. That a public hearing be had on said improvement on Wednesday, lOth dav of Februarv, 1999, at 5:30 o'clock P.M., in the Council Chambers of the City Hall and Court House Building in the City of 5aint Paul. 3. That notice of said public hearing be given to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cost thereof as estimated. COUNCILPERSONS Yeas Nays ✓ Blakey ✓ Bostrom n, , o,-; ,. ✓ Harris �d- ✓ &ett.man �/ Tl-�nnP �G�.fq✓ � (.���nr 1 In Favor G O/L ir79� (A6� t�r 1 L��'��c� �Ag q a / inst /Zc.YC/ Z HaSI�JZ Adopted by Council: Certi� f;z�Tass B �c�� Y il Secretary Mayor i18891P0) DEPARTMENT OF PUBLIC WORKS Stacy M. Becker, Directar Thomas J. Eggum, City Engineer CITY OF SAINT PAUL Norm Caleman, Mayor 99-�qo �`� � Larry Lueth, Construction Engineer 900 Ciry Hal! Arsnez Telephone: 612-266-6080 Sairst Paul, MN 55102 Facsimi[e: 6I2-292-63I5 November 18, 1998 Mr. Peter White Right-of-Way �ngineer 140 City Hall Saint Paul, Minnesota 55102 � �: . . �E.;',!. F RE: BLOCK 3, RYAN PLACE Dear Mr. White: Please take the necessary steps to schedule a public hearing on the following matter: Improve the alley in BLOCK 3, RYAN PLACE (bounded by Hartford, Mississippi River Blvd., Randolph and Mount Curve Blvd.) By grading and paving with bituminous material. Also, condemning and taking an easement in the land necessary for the slopes, cuts and fills, including right of removal of lateral support from subject land or remainder thereof, occasioned by excavations thereof or construction of slopes in the gradinc and paving of said alley. Attached are a Summary of Engineering Recommendations, an area map, and Green Sheet. Sincerely, ?,.� �� �� Paul St. Martin Civil Engineer IV PSM:bk Attachments Responsive Services • Qualiry FaciliNes • Employee Pride � I i 1 �) i � .Q ` � � G v '/ \ � � 0 � (�) Y � �� v M N N 'r " 9 0 \� � • 4 O � I i } RANDOLPH ,,,,.. � /.0 2G � .S q ioo.JY TN'_'__ 100 Z� tr3� I ^ �'' CG iD1.93 > /Bf.TI '' �' .�v� � _�_ _ . ` � '" 27 (,� (IC 2 � � �u �T� 27 J , i9: z5 �Pl.2C ` i3'.a2 J _ ' � - - - - L - - - („� 3 J - 28 `z' � i99.S7 L z 1�0.26 � 13P 69 e 29 (2� (fb7 '� ' c �3b� 21 �" 202 BP �g3.1( •-rr 7c Qe� 4 30 C3> C�v 5 (� j 2 �2 /0(.2S �42.23 6 __Z , -_31-____ � 2e) 6 _ �.wJ 31 � _ 209 52 199.25 /Y? S 3z (a� (a 7 ( 32 2�z 8r za1.zS wv 7f 33 (5) (2zJ, 8 ° �4z> 3'S _ 216.i6 205.25 146Ca 34 �2i> 9 �°3) 34 _ _ _ __ 2/9 XI- -- � 20B>ZS �� 3 35 ��� �Z9� IO . �44) fs 2Z2 �9 2//.2S raE S� 3 C <n �zn �� rAs� sc �. 226.// 2/M.2S � IV9.B4 - � - � �''�j- - (z`> �Z : (�, 37 z zzs.sc �. ' � ' �U sa �e� ------_13-?--- ---�rg�--� z3e.x ' 220.2M ' / 2.3P i z- -.'Siz43.L r, - � - - , Cz'> 14 : (a�l) 39 2Y .29 -' _ 233-2-Y-PYJ:�Z � /53 6S C-is oa � H 257 �5 9) �Ze) T2052Y (A6) �� i A '� ` N N I . �i� �_JZc`�'� � 'TI >O� z6�oz zz�.�v M ti ----�= ' + /56/9 42 (ioJ �Zy� 17 ° ° �4q� -02 z�l.31 232.2Y �°, � � i57 v6 _ _ - _ -[=L°L - 43 �So� I8 � ( 43 21S.7S 235.24 IS ]3 44 (ir> (5» 19 � ( -04 _ 295 2sa.zv r /59 9 qS Yo.�Y �sz> 20 ----- �en 45 302.6i Z �Zµ `F� �. /G/2G :"/3.7r 2t>, � 46 (33� -�--21i i°�3) �Q6 301 Od " 2vY,13 �l � �lZ.S+ 1 2i �r � 9 97 (�J ------�----- /sw� .Q7 -_ __3o/..5� .___ _. ZvL23 � `_ i63 �29.e2 �3 oi� .��. 4B / __ _ 23 0 � t55! 4a _ 30/ a3 ____ 2SO.L3 -- �65 0' _ - _ 92 - _ �3� 24 . (SC�� � S` S e ° soo 49 r.s» (rzc ?ao. �__ ._ __-^--z3'37T.��'- � o: i66��v 50 �ia] �'Sr.� ZS � ,� 50 � c+ Joo a 2SC.B/ �oo.oY C1. SS 99-�9a 0 Summary of Engineering Recommendations Report Prepared - October 18, 1998 Finial Order PROJECT Imptove the alley in Block 3, Ryan Place (bounded by Hartford, Mississippi Blvd., Randolph, and Moun[ Curve Blvd.) by grading and paving with a bituminous material. Also condemning and taking an easement in the necessary for the slopes, cuts, and fills, including right of removal of lateral support from subject land or land reminder [hereof, occasional by excavations thereof or construction of slopes in the grading and paving of said alley. INTfIATING ACTIONS This improvement was initiated by a petition of 81 % of the property owners. the alley is plat[ed 20 feet wide. The surface of the alley is oiled. PROPOSED IMPROVEMENT: Grade the alley to a width of 16' and place a hot mix bituminous pavement. ESTIMATED COST AND FINANCING: Estimated Constmction Cost Engineering/Inspection Service Fee Miscellaneous Estimated Tota] Expenditures $32,040.00 9,610.00 2,880.00 13,729.00 $58,259.00 Financing - Assessments INFORMATIONAL MEETING Not scheduled yet. SOURCE OF ADDTI'IONAL INFORMATION: $58,259.00 For additional inforrna[ion, contac[ Paul St. Martin at 266-6ll 8. SUMMARY OF RECOMMENDATIONS: The Department of Public Works recommends [ha[ this project be constmcted. Respectfully submitted, Paul St. Martin Project Engineer ORIGINAL CITY OF ST. PAUL FINAL ORDSR �� co iL = ° l�l - ��O B FILS NO. 18891 VOTING WARD 3 In the Matter of improving the alley in Block 3, Ryan Place (Bounded by Randolph, Mount Curve, Hartford, and Mississippi Blvd.) by constructing storm sewer and by grading and paving with a bituminous material. under Preliminary Order approved The Council of the City of Saint Pau1 has conducted a public hearing upon the above improvement, due notice thereof having been given as prescribed by the City Charter; and WHEREAS, The Council has heard a11 persons, objections and recommendations pertaining to said proposed improvement ancl has fully considered the same; now, therefore, be it RESOLVED, That the Council of the City of Saint Pau1 does hereby order that the above-described improvement be made, and the proper City officers are hereby directed and authorized to proceed with the improvement; and be it FURTHER RESOLVED, That upon the completion of said improvement, the proper City officers shall calculate all expenses incurred therein and shall report the same to the City Council in accordance with Chapter 14 of the City Charter. COUNCILPERSON Yea Nay fBenanav Adopted by the Date: �� l� ��q9 Certified Passes by Council Secretary ✓ Blakey Bostrom—��,� � � By �Co l eman �°� �Harris d Against ��Lantry , ����� ��Reiter Public Hearing : August 11, 1499 T.M.S.IREAL ESTATE DIVISION :oatact ParsOa aa8 PhoAa Number: Paul St. Martia 266-6118 Qust be on Counril Agenda by: Alreadp done �ost be in Comcil Research Office �p nuon on Ftidap 7!9/1999 .� 5'�' Date: w�uww � �� r 7/9/99 Green Sheet Number: 09438 HTt1TffiPt DIR%CTOR 2 ITY CdQNCZL xxr axxo�x xxr cus�ex 1 �# OF SIGNATURE PAGFS (CLIP ALL LOCATIONS FOR SIGNATURE) v�Quxs�rcn: Improve the alley in BLOCIC 3, RYAN PLACE (Bounded by Hartford, ,issippi 81vd., Randolph and Mouat Curve Blvd.) by coastructing storm sewer by grading and paving with a bituminous material Project # 18891. PLANNA'G COMM[SSION CNII. SERVICE COMMLSSION "" `' ERSONAL SERVICE CONTRACTS M[JST ANSWER THE FOLLOWING: . FIas the person/Cu�m ever worked under a coniraM for this deparhuent? YES NO A srnee . Has this personlffrm ever been a City employee? YE,S NO Public Hea1W Does this persoNFrm possess a slull not normally possessed by any YES NO carrent City employee? c�aconcm�n�Ee — Y�„csw�y. Explain a11 YES aaswers on a separate s6eet and attach. 11'ING PROBLEM, ISSUE, OPPORI'ONITY (Who� What� When, Where, Why?): improvement was inifiated by a pefition signed by 81 % of the property owners. NTAGESZFAPPROVED: � will have improved ride, appearance and drainage. rVANTAGESIF APPROVED: such as noise, dust APPBOVED: rIOUNT OF TRANSACTION: �(�7�840 COSTIREVEI3QE BUDGETED (CIRCLE ONE) SOURCE: ASSCSSIT1CIItS OI11V AC77VITYNUMBER: YES 230 be ORfGINAL CITY OF SAINT PAUL Norm Co(eman, Mayor July 8. 1999 Mr. Peter White . Right-of-Way Engineer 140 City Hall Saint Paul, Minnesota 55102 RE: BLOCK 3, RYAN PLACE Dear Mr. White: RECEIVEQ JUL 0 g �g9 REAL ESTqTE D��� Piease take the necessary steps to schedule a public hearing on the following matter: lmprove the alley in BLOCK 3, RYAN PLACE (Bounded by Hartford, Mississippi River B{vd., Randoiph and Mount Curve Blvd.) by constructing storm sewer and grading and paving with bituminous material. Also, condemning and taking an easement in the land necessary for the slopes, cuts and fills, inciuding right of removai of lateral support from subject land or remainder thereof, occasioned by excavations thereof or construction of slopes in the grading and paving of said afley. Attached are a Summary of Engineering Recommendations, an area map, and Green Sheet. This project was laid over indefinitefy at public hearing on February 10, 1999. We have since added storm sewer to the proposal and revised the estimate. The residents wou(d like to have this work completed this year, so I would like you to set up the public hearing as soon as possible. Sincerely, �� ld t R q �o�� Paul St. Martin Civi1 Eng+neer IV PSM:bk Attachments DEPARTMENTOFPUBLICWORKS � Thomas J. Eggum, Directar -� Larry Lueth, Consuuctiors Engineer 25 W. Fourth Street 900 Ciry Ha[I Anne� Telephone: 651-266-6080 Saint Paul, MN 55102-I660 Facsimile: 651-292-b315 Responsive Services �• Quality Facilities • Employee Pride � �RIGINAL _�qa Summary of Engineering Recommendations �� Report Prepared - July 8,1999 Final Order Hearing PRO.TECT: Improve the Alley in Block 3, Ryan Place (bounded by Hartford, Mississippi River Blvd., Randolph and IvIount Curve Blvd.) by constructing storm sewer and a ading and paving with bituminous material. Also, condemning and taking an easement in the land necessary for the slopes and cuts and fills, including righK of removal of lateral support from subject tand or land remainder thereof, occasioned by excavations thereof or construction of slopes in the a ading and paving of said alley. INITIATING ACTION: This improvement was initiated by a petition signed by 81 %o of the property owners. EXISTING CONDITIONS: The alley is platted 20 feet wide. The surface of the alley is oiled. PROPOSEDIMPROVEMENT: Construct storm sewer and grade the alley to a width of 16' and place a hot mix bituminous pavement. ESTIMATED COST AND FINANCING: Estimated ConstrucCion Cost Engineering/Inspection Service Fee Miscellaneous Estimated Total Expenditures $61,500.00 18,460.00 5,54Q.00 I2 300.00 $97,840.00 Financing - Assessments Estimated Rate per Assessable Foot INFORMATIONAL MEETING: Not scheduled yet. $47,840.00 ' il. SOURCE OF ADDITIONAL INFORMATION: For additional iInformation, contact Paul St. Martin at 651-266-6118. SUMMARY OF RECOMMENDATIONS: The Department of Public Works recommends that this project be constructed. Respectfully submitted, Paul St. Mar[in Project Engineer � 1 ..� �) 1�� � r - l 4� / I � � I � �� � � ` V � � �\ � (�) i d ��� � J L � ti N N � „. K � t L � RAN DO L PH qg.��o �.c za , .,s a ,oc.or r` ' �oc zc (,�� i -. �, - �J1_9J ` s 1812t i i + eG • r �. ' Q '27 ��� �It) 2 a • i -'_-- , i9: 1S . r9J.ZL � � �° � z � ■ i '_' ' '� / � � �� - - — — -- L — ' (�t� 3 .-.� � 2r � rz 6d.1 _ � Sl -- l.^0.2[ � ' .. o z9 . - C2� (,�, 4 (��.� z _-- za: s+ _ ,s7.zc e�l _ 3J �3� �rll 5 ��<., _ ` . � __-_'?f: r 2 7 �Jr.2s -_ �- ,., - _ '._ 3f _ _ _ _ _ �_� : 6 - ��•; 3 1 LC9 52 _. �99.25 S2 �:� ��.J 7 (a�� z� ._� _ 2�1 g" 2eL2S 3 S ��� (��> s �___.216 i6 205.:5 �irl °' -��` �_ ' __ _' 3i�_° y.� c ( -'i> 9 �'-l) 3i _ — 2ae 2S 35 (C) (�sJ 10 . '-:. 2ez �y 1i� zs � (-ta> >s �Y= � 3C �7� ��� 11 (+r� 3c '__' 226 u ' _ Z/Y.2S lv°: ' ' — 3Z .�.>.. <3 _ �.) IZ � __ ! ' i 229 SCp ( ��� � r. z ,s,.,_ 3 � C�� ---- • -- ��-- z -- ___3EL_'_ 2 3d �L � , 22o.1V ' F75: _ _ �_ _��2y3.4G / � - - _ � l �� > �� - �47) �9 - 2'3 2 9 _ _ _ 223.,2-Y- . � �c l'i �� ��� `ZB; �S -_--�.!,��-'-. 257 �S L; ----- — -•ct— .zzc.zY � �_ a�� ti �— — �� 91 ---r--IE----- � . �'( . ��� ---zs)cz i zz�.7v M r--, i5a�^,� ` 42 (,o) �� 17 a o(_9 }Z -- � 2s! 3d 232.2Y o �( v ��� - _ _ _ _ _ - - 43 (30� IB � � ; �-- 21S 7$� 23S 2Y �� � L IS. 44 ,u� � �9 � / -- . 295ii 23C ZY l- l S� '�r � � c ., e 45 -'---` ----- •��<�. - ' — reir (3z, 20 302.6r 74/2ro �6Z� '15 � ia Yr � i- tC! = ._ __' r.. a. — ! 3C2�Od ^ �33) zy jlr � f,°l3) �i6 , ��� " IP � /�� _. _ „ 57 � �> _'____ -�2_ _ __ —_' _:/ SS 2�7. 13 � �3-1 G � o; , ` -- -�': :t � — �� 4r �>> ----- 23 �..r, ;5J G � _.�_� Jc/ 03 ._ ._ 2S: ze____^ '_ � ,(� IjS; 3�1 _ �L'� O G �5�� ^ �y_�___ _� —IrfT ____ � COO 'tJ� _ - r `CC F So ` � 3 � 25 � � �� � : t ; Joo z � _S( a/ °' �oe.or Ic++ �. ' �-i �. . .� i + 4: • 99- �9a CITY OF ST. PAI7L FINAL ORDSR OR{G{NAL In In the MaCter o£ improving the alley in Block 3, Ryan Place. (Bounded by Randolph, Mount Curve, Aartford, and Mississippi Blvd. Project # 18891) by grading and paving with a bituminous material. under Preliminary Order 10 ' 1` �+� approved �u • a3 1{`p The Council of the City of Saint Paul has conducted a public hearing upon the above improvement, due notice thereof having been given as prescribed by the City Charter; and WHEREAS, The Council has heard all persons, objections and recommendations pertaining to said proposed improvement and has fully considered the same; now, therefore, be it RESOLVED, That the Council of the City of Saint Paul does hereby order that the above-described improvement be made, and the proper City officers are hereby directed and authorized to proceed with the improvement; and be it FURTHER RESOLVED, That upon the completion of said improvement, the proper City officers shall calculaCe all expenses incurred therein and shall report the same to the City Council in accordance with Chapter 14 of the City Charter. COUNCILPERSON Yea Nay Benanav Blakey Sostrom Coleman Harris Lantry Reiter Against . „ : .. - -,.,� l / �- 1 �.�►�� FILE NO. 18891 VOT=NG WARD - -3- - - Adopted by the Date: Certi£ied Passes by Council Secretary � Mayor y9-�9a Interdepartmental Memorandum CITY OF SAINT PAUL TO: Nancy Anderson "f.i,I:�;J c C;n;�e�. JUL �. 4 i�� From: Peter White �` Right of WaylEngineer 140 City Hall Date: July 9, 1999 Subject: BI:OCK "3, RYAN PI.ACE �� � � M� �� ����� � Please take the necessary steps to schedule a public hearing on the following matter: Improve the alley in BLOCK 3, RXAN PLACE (Bounded by Hartford, Mississippi River Blvd., Randolph and Mount Curve Slvd.) by constructing storm sewer and grading and paving with bituminous material. Also, condemning and taking an easement in the land necessary for the slopes, cuts and fills, including right of removal of lateral support from subject land or remainder thereof, occasioned by excavations thereof or construction of slopes in the grading and paving of said alley. This project was laid over indefinitely at public hearing an February 10, 1999. We have since added stotm sewer to proposal and revised the estimate. The residents would like to have this work completed this year, so I would like you to set up the public hearing for August 11, 1999. P�iblic Heazin : Febru 10, 1999 T.M.S./REAL ESTATE DIVISION Date: ontact Persoa aad Phoae iiumber: Paul St. Martin 266-6118 tust be on Council Agenda by: 1]J23/IS fost be in Councii Research �ce y noon on Friday 19/1U1998 'OTAL # OF SIGNA7'URE PAGES (CLIP ALL LC nrui � �- • 12/10/98 GreenSheetNumber: 38624 ARTAffiNT aZRSCTOR 2 iTY COONCIL ITY ATTOPNSY ITY Q,BR% toa�.ss¢cvrp I r[oNxeQVES�n: Improve the alley in BLOCIC 3, RYAN PLACE (BOUnded by Hartford, ssissippi Blvd., Randolph and Mouat Curve Blvd.) by grading and paving with bituminous material Project # 18891. PLANNWC COh1MISS10N CIVIL SERVICE COMMISSION A SIAFF Public Health .RSONAL SERVICE CANTRACTS MUST ANSWER TAE FOLIAR'ING: � Has the persodfirm ever worked under a contract for Wis department? YES NO Elas tLis person/frm ever been a City�ployee? YES NO Does this persodficm possess a sldll not normally possessed by any YES NO cm comt.�m'ee — v �� B�� �'rent City employee? Ezylain aVl YFS answers on a sepaz2te sheet and aUach. �TING PROBLEM, ISSUE, OPFORTIIIVITY (Who, Whay When, Where, Why?): This improvement was initiated by a petition signed by 81 % of the property owners. VTAGESIFAPPROVED: � will have imoroved ride. anaearance and drainaee. �ANTAGES IF APPROVED: Normal problems associated with �ANTAGES IF NOT APPROVED: will continue to deteriorate. such as noise. dust AMOUNT OF'CRANSACT[ON: �j$ ,259.00 COSTlREVENUE BUDGETED (CIRCLE ONE) IG SOURCE: A55CSSM8IIfS O11I}' ACTIVI'PY NOMBER: 'IAL INFORMATION: (F,XPLAII� . Propertv owners will be notified of the nublic hearing and charees. .y� � g,�es:j t�' !V^° �CSg?fo{ Q�€� .E� 9� 4��� . . _..,.__. .._ - - � -- __' yy-�� �,. CITY OF ST. PAUL PRELIMINARY ORD&R ORIGfNAL 3/ BY I F E I30. �� '���� ���1wi FILL+ NO. 18891 VOTING WARD 3 In the Matter of improving the alley in Block 3, Ryan Place by grading and paving with bituminous material. (Bounded by Randolph, Mount Curve, Hartford, and Mississippi Blvd. project # 18891). The Council of the CiCy of Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: l. That the said report and the same is hereby approved with no alternatives, and that the estimated cost thereof is $ 40788.00 financed by assessments only. 2. That a public hearing be had on said improvement on Wednesday, lOth dav of Februarv, 1999, at 5:30 o'clock P.M., in the Council Chambers of the City Hall and Court House Building in the City of 5aint Paul. 3. That notice of said public hearing be given to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cost thereof as estimated. COUNCILPERSONS Yeas Nays ✓ Blakey ✓ Bostrom n, , o,-; ,. ✓ Harris �d- ✓ &ett.man �/ Tl-�nnP �G�.fq✓ � (.���nr 1 In Favor G O/L ir79� (A6� t�r 1 L��'��c� �Ag q a / inst /Zc.YC/ Z HaSI�JZ Adopted by Council: Certi� f;z�Tass B �c�� Y il Secretary Mayor i18891P0) DEPARTMENT OF PUBLIC WORKS Stacy M. Becker, Directar Thomas J. Eggum, City Engineer CITY OF SAINT PAUL Norm Caleman, Mayor 99-�qo �`� � Larry Lueth, Construction Engineer 900 Ciry Hal! Arsnez Telephone: 612-266-6080 Sairst Paul, MN 55102 Facsimi[e: 6I2-292-63I5 November 18, 1998 Mr. Peter White Right-of-Way �ngineer 140 City Hall Saint Paul, Minnesota 55102 � �: . . �E.;',!. F RE: BLOCK 3, RYAN PLACE Dear Mr. White: Please take the necessary steps to schedule a public hearing on the following matter: Improve the alley in BLOCK 3, RYAN PLACE (bounded by Hartford, Mississippi River Blvd., Randolph and Mount Curve Blvd.) By grading and paving with bituminous material. Also, condemning and taking an easement in the land necessary for the slopes, cuts and fills, including right of removal of lateral support from subject land or remainder thereof, occasioned by excavations thereof or construction of slopes in the gradinc and paving of said alley. Attached are a Summary of Engineering Recommendations, an area map, and Green Sheet. Sincerely, ?,.� �� �� Paul St. Martin Civil Engineer IV PSM:bk Attachments Responsive Services • Qualiry FaciliNes • Employee Pride � I i 1 �) i � .Q ` � � G v '/ \ � � 0 � (�) Y � �� v M N N 'r " 9 0 \� � • 4 O � I i } RANDOLPH ,,,,.. � /.0 2G � .S q ioo.JY TN'_'__ 100 Z� tr3� I ^ �'' CG iD1.93 > /Bf.TI '' �' .�v� � _�_ _ . ` � '" 27 (,� (IC 2 � � �u �T� 27 J , i9: z5 �Pl.2C ` i3'.a2 J _ ' � - - - - L - - - („� 3 J - 28 `z' � i99.S7 L z 1�0.26 � 13P 69 e 29 (2� (fb7 '� ' c �3b� 21 �" 202 BP �g3.1( •-rr 7c Qe� 4 30 C3> C�v 5 (� j 2 �2 /0(.2S �42.23 6 __Z , -_31-____ � 2e) 6 _ �.wJ 31 � _ 209 52 199.25 /Y? S 3z (a� (a 7 ( 32 2�z 8r za1.zS wv 7f 33 (5) (2zJ, 8 ° �4z> 3'S _ 216.i6 205.25 146Ca 34 �2i> 9 �°3) 34 _ _ _ __ 2/9 XI- -- � 20B>ZS �� 3 35 ��� �Z9� IO . �44) fs 2Z2 �9 2//.2S raE S� 3 C <n �zn �� rAs� sc �. 226.// 2/M.2S � IV9.B4 - � - � �''�j- - (z`> �Z : (�, 37 z zzs.sc �. ' � ' �U sa �e� ------_13-?--- ---�rg�--� z3e.x ' 220.2M ' / 2.3P i z- -.'Siz43.L r, - � - - , Cz'> 14 : (a�l) 39 2Y .29 -' _ 233-2-Y-PYJ:�Z � /53 6S C-is oa � H 257 �5 9) �Ze) T2052Y (A6) �� i A '� ` N N I . �i� �_JZc`�'� � 'TI >O� z6�oz zz�.�v M ti ----�= ' + /56/9 42 (ioJ �Zy� 17 ° ° �4q� -02 z�l.31 232.2Y �°, � � i57 v6 _ _ - _ -[=L°L - 43 �So� I8 � ( 43 21S.7S 235.24 IS ]3 44 (ir> (5» 19 � ( -04 _ 295 2sa.zv r /59 9 qS Yo.�Y �sz> 20 ----- �en 45 302.6i Z �Zµ `F� �. /G/2G :"/3.7r 2t>, � 46 (33� -�--21i i°�3) �Q6 301 Od " 2vY,13 �l � �lZ.S+ 1 2i �r � 9 97 (�J ------�----- /sw� .Q7 -_ __3o/..5� .___ _. ZvL23 � `_ i63 �29.e2 �3 oi� .��. 4B / __ _ 23 0 � t55! 4a _ 30/ a3 ____ 2SO.L3 -- �65 0' _ - _ 92 - _ �3� 24 . (SC�� � S` S e ° soo 49 r.s» (rzc ?ao. �__ ._ __-^--z3'37T.��'- � o: i66��v 50 �ia] �'Sr.� ZS � ,� 50 � c+ Joo a 2SC.B/ �oo.oY C1. SS 99-�9a 0 Summary of Engineering Recommendations Report Prepared - October 18, 1998 Finial Order PROJECT Imptove the alley in Block 3, Ryan Place (bounded by Hartford, Mississippi Blvd., Randolph, and Moun[ Curve Blvd.) by grading and paving with a bituminous material. Also condemning and taking an easement in the necessary for the slopes, cuts, and fills, including right of removal of lateral support from subject land or land reminder [hereof, occasional by excavations thereof or construction of slopes in the grading and paving of said alley. INTfIATING ACTIONS This improvement was initiated by a petition of 81 % of the property owners. the alley is plat[ed 20 feet wide. The surface of the alley is oiled. PROPOSED IMPROVEMENT: Grade the alley to a width of 16' and place a hot mix bituminous pavement. ESTIMATED COST AND FINANCING: Estimated Constmction Cost Engineering/Inspection Service Fee Miscellaneous Estimated Tota] Expenditures $32,040.00 9,610.00 2,880.00 13,729.00 $58,259.00 Financing - Assessments INFORMATIONAL MEETING Not scheduled yet. SOURCE OF ADDTI'IONAL INFORMATION: $58,259.00 For additional inforrna[ion, contac[ Paul St. Martin at 266-6ll 8. SUMMARY OF RECOMMENDATIONS: The Department of Public Works recommends [ha[ this project be constmcted. Respectfully submitted, Paul St. Martin Project Engineer ORIGINAL CITY OF ST. PAUL FINAL ORDSR �� co iL = ° l�l - ��O B FILS NO. 18891 VOTING WARD 3 In the Matter of improving the alley in Block 3, Ryan Place (Bounded by Randolph, Mount Curve, Hartford, and Mississippi Blvd.) by constructing storm sewer and by grading and paving with a bituminous material. under Preliminary Order approved The Council of the City of Saint Pau1 has conducted a public hearing upon the above improvement, due notice thereof having been given as prescribed by the City Charter; and WHEREAS, The Council has heard a11 persons, objections and recommendations pertaining to said proposed improvement ancl has fully considered the same; now, therefore, be it RESOLVED, That the Council of the City of Saint Pau1 does hereby order that the above-described improvement be made, and the proper City officers are hereby directed and authorized to proceed with the improvement; and be it FURTHER RESOLVED, That upon the completion of said improvement, the proper City officers shall calculate all expenses incurred therein and shall report the same to the City Council in accordance with Chapter 14 of the City Charter. COUNCILPERSON Yea Nay fBenanav Adopted by the Date: �� l� ��q9 Certified Passes by Council Secretary ✓ Blakey Bostrom—��,� � � By �Co l eman �°� �Harris d Against ��Lantry , ����� ��Reiter Public Hearing : August 11, 1499 T.M.S.IREAL ESTATE DIVISION :oatact ParsOa aa8 PhoAa Number: Paul St. Martia 266-6118 Qust be on Counril Agenda by: Alreadp done �ost be in Comcil Research Office �p nuon on Ftidap 7!9/1999 .� 5'�' Date: w�uww � �� r 7/9/99 Green Sheet Number: 09438 HTt1TffiPt DIR%CTOR 2 ITY CdQNCZL xxr axxo�x xxr cus�ex 1 �# OF SIGNATURE PAGFS (CLIP ALL LOCATIONS FOR SIGNATURE) v�Quxs�rcn: Improve the alley in BLOCIC 3, RYAN PLACE (Bounded by Hartford, ,issippi 81vd., Randolph and Mouat Curve Blvd.) by coastructing storm sewer by grading and paving with a bituminous material Project # 18891. PLANNA'G COMM[SSION CNII. SERVICE COMMLSSION "" `' ERSONAL SERVICE CONTRACTS M[JST ANSWER THE FOLLOWING: . FIas the person/Cu�m ever worked under a coniraM for this deparhuent? YES NO A srnee . Has this personlffrm ever been a City employee? YE,S NO Public Hea1W Does this persoNFrm possess a slull not normally possessed by any YES NO carrent City employee? c�aconcm�n�Ee — Y�„csw�y. Explain a11 YES aaswers on a separate s6eet and attach. 11'ING PROBLEM, ISSUE, OPPORI'ONITY (Who� What� When, Where, Why?): improvement was inifiated by a pefition signed by 81 % of the property owners. NTAGESZFAPPROVED: � will have improved ride, appearance and drainage. rVANTAGESIF APPROVED: such as noise, dust APPBOVED: rIOUNT OF TRANSACTION: �(�7�840 COSTIREVEI3QE BUDGETED (CIRCLE ONE) SOURCE: ASSCSSIT1CIItS OI11V AC77VITYNUMBER: YES 230 be ORfGINAL CITY OF SAINT PAUL Norm Co(eman, Mayor July 8. 1999 Mr. Peter White . Right-of-Way Engineer 140 City Hall Saint Paul, Minnesota 55102 RE: BLOCK 3, RYAN PLACE Dear Mr. White: RECEIVEQ JUL 0 g �g9 REAL ESTqTE D��� Piease take the necessary steps to schedule a public hearing on the following matter: lmprove the alley in BLOCK 3, RYAN PLACE (Bounded by Hartford, Mississippi River B{vd., Randoiph and Mount Curve Blvd.) by constructing storm sewer and grading and paving with bituminous material. Also, condemning and taking an easement in the land necessary for the slopes, cuts and fills, inciuding right of removai of lateral support from subject land or remainder thereof, occasioned by excavations thereof or construction of slopes in the grading and paving of said afley. Attached are a Summary of Engineering Recommendations, an area map, and Green Sheet. This project was laid over indefinitefy at public hearing on February 10, 1999. We have since added storm sewer to the proposal and revised the estimate. The residents wou(d like to have this work completed this year, so I would like you to set up the public hearing as soon as possible. Sincerely, �� ld t R q �o�� Paul St. Martin Civi1 Eng+neer IV PSM:bk Attachments DEPARTMENTOFPUBLICWORKS � Thomas J. Eggum, Directar -� Larry Lueth, Consuuctiors Engineer 25 W. Fourth Street 900 Ciry Ha[I Anne� Telephone: 651-266-6080 Saint Paul, MN 55102-I660 Facsimile: 651-292-b315 Responsive Services �• Quality Facilities • Employee Pride � �RIGINAL _�qa Summary of Engineering Recommendations �� Report Prepared - July 8,1999 Final Order Hearing PRO.TECT: Improve the Alley in Block 3, Ryan Place (bounded by Hartford, Mississippi River Blvd., Randolph and IvIount Curve Blvd.) by constructing storm sewer and a ading and paving with bituminous material. Also, condemning and taking an easement in the land necessary for the slopes and cuts and fills, including righK of removal of lateral support from subject tand or land remainder thereof, occasioned by excavations thereof or construction of slopes in the a ading and paving of said alley. INITIATING ACTION: This improvement was initiated by a petition signed by 81 %o of the property owners. EXISTING CONDITIONS: The alley is platted 20 feet wide. The surface of the alley is oiled. PROPOSEDIMPROVEMENT: Construct storm sewer and grade the alley to a width of 16' and place a hot mix bituminous pavement. ESTIMATED COST AND FINANCING: Estimated ConstrucCion Cost Engineering/Inspection Service Fee Miscellaneous Estimated Total Expenditures $61,500.00 18,460.00 5,54Q.00 I2 300.00 $97,840.00 Financing - Assessments Estimated Rate per Assessable Foot INFORMATIONAL MEETING: Not scheduled yet. $47,840.00 ' il. SOURCE OF ADDITIONAL INFORMATION: For additional iInformation, contact Paul St. Martin at 651-266-6118. SUMMARY OF RECOMMENDATIONS: The Department of Public Works recommends that this project be constructed. Respectfully submitted, Paul St. Mar[in Project Engineer � 1 ..� �) 1�� � r - l 4� / I � � I � �� � � ` V � � �\ � (�) i d ��� � J L � ti N N � „. K � t L � RAN DO L PH qg.��o �.c za , .,s a ,oc.or r` ' �oc zc (,�� i -. �, - �J1_9J ` s 1812t i i + eG • r �. ' Q '27 ��� �It) 2 a • i -'_-- , i9: 1S . r9J.ZL � � �° � z � ■ i '_' ' '� / � � �� - - — — -- L — ' (�t� 3 .-.� � 2r � rz 6d.1 _ � Sl -- l.^0.2[ � ' .. o z9 . - C2� (,�, 4 (��.� z _-- za: s+ _ ,s7.zc e�l _ 3J �3� �rll 5 ��<., _ ` . � __-_'?f: r 2 7 �Jr.2s -_ �- ,., - _ '._ 3f _ _ _ _ _ �_� : 6 - ��•; 3 1 LC9 52 _. �99.25 S2 �:� ��.J 7 (a�� z� ._� _ 2�1 g" 2eL2S 3 S ��� (��> s �___.216 i6 205.:5 �irl °' -��` �_ ' __ _' 3i�_° y.� c ( -'i> 9 �'-l) 3i _ — 2ae 2S 35 (C) (�sJ 10 . '-:. 2ez �y 1i� zs � (-ta> >s �Y= � 3C �7� ��� 11 (+r� 3c '__' 226 u ' _ Z/Y.2S lv°: ' ' — 3Z .�.>.. <3 _ �.) IZ � __ ! ' i 229 SCp ( ��� � r. z ,s,.,_ 3 � C�� ---- • -- ��-- z -- ___3EL_'_ 2 3d �L � , 22o.1V ' F75: _ _ �_ _��2y3.4G / � - - _ � l �� > �� - �47) �9 - 2'3 2 9 _ _ _ 223.,2-Y- . � �c l'i �� ��� `ZB; �S -_--�.!,��-'-. 257 �S L; ----- — -•ct— .zzc.zY � �_ a�� ti �— — �� 91 ---r--IE----- � . �'( . ��� ---zs)cz i zz�.7v M r--, i5a�^,� ` 42 (,o) �� 17 a o(_9 }Z -- � 2s! 3d 232.2Y o �( v ��� - _ _ _ _ _ - - 43 (30� IB � � ; �-- 21S 7$� 23S 2Y �� � L IS. 44 ,u� � �9 � / -- . 295ii 23C ZY l- l S� '�r � � c ., e 45 -'---` ----- •��<�. - ' — reir (3z, 20 302.6r 74/2ro �6Z� '15 � ia Yr � i- tC! = ._ __' r.. a. — ! 3C2�Od ^ �33) zy jlr � f,°l3) �i6 , ��� " IP � /�� _. _ „ 57 � �> _'____ -�2_ _ __ —_' _:/ SS 2�7. 13 � �3-1 G � o; , ` -- -�': :t � — �� 4r �>> ----- 23 �..r, ;5J G � _.�_� Jc/ 03 ._ ._ 2S: ze____^ '_ � ,(� IjS; 3�1 _ �L'� O G �5�� ^ �y_�___ _� —IrfT ____ � COO 'tJ� _ - r `CC F So ` � 3 � 25 � � �� � : t ; Joo z � _S( a/ °' �oe.or Ic++ �. ' �-i �. . .� i + 4: • 99- �9a CITY OF ST. PAI7L FINAL ORDSR OR{G{NAL In In the MaCter o£ improving the alley in Block 3, Ryan Place. (Bounded by Randolph, Mount Curve, Aartford, and Mississippi Blvd. Project # 18891) by grading and paving with a bituminous material. under Preliminary Order 10 ' 1` �+� approved �u • a3 1{`p The Council of the City of Saint Paul has conducted a public hearing upon the above improvement, due notice thereof having been given as prescribed by the City Charter; and WHEREAS, The Council has heard all persons, objections and recommendations pertaining to said proposed improvement and has fully considered the same; now, therefore, be it RESOLVED, That the Council of the City of Saint Paul does hereby order that the above-described improvement be made, and the proper City officers are hereby directed and authorized to proceed with the improvement; and be it FURTHER RESOLVED, That upon the completion of said improvement, the proper City officers shall calculaCe all expenses incurred therein and shall report the same to the City Council in accordance with Chapter 14 of the City Charter. COUNCILPERSON Yea Nay Benanav Blakey Sostrom Coleman Harris Lantry Reiter Against . „ : .. - -,.,� l / �- 1 �.�►�� FILE NO. 18891 VOT=NG WARD - -3- - - Adopted by the Date: Certi£ied Passes by Council Secretary � Mayor y9-�9a Interdepartmental Memorandum CITY OF SAINT PAUL TO: Nancy Anderson "f.i,I:�;J c C;n;�e�. JUL �. 4 i�� From: Peter White �` Right of WaylEngineer 140 City Hall Date: July 9, 1999 Subject: BI:OCK "3, RYAN PI.ACE �� � � M� �� ����� � Please take the necessary steps to schedule a public hearing on the following matter: Improve the alley in BLOCK 3, RXAN PLACE (Bounded by Hartford, Mississippi River Blvd., Randolph and Mount Curve Slvd.) by constructing storm sewer and grading and paving with bituminous material. Also, condemning and taking an easement in the land necessary for the slopes, cuts and fills, including right of removal of lateral support from subject land or remainder thereof, occasioned by excavations thereof or construction of slopes in the grading and paving of said alley. This project was laid over indefinitely at public hearing an February 10, 1999. We have since added stotm sewer to proposal and revised the estimate. The residents would like to have this work completed this year, so I would like you to set up the public hearing for August 11, 1999. P�iblic Heazin : Febru 10, 1999 T.M.S./REAL ESTATE DIVISION Date: ontact Persoa aad Phoae iiumber: Paul St. Martin 266-6118 tust be on Council Agenda by: 1]J23/IS fost be in Councii Research �ce y noon on Friday 19/1U1998 'OTAL # OF SIGNA7'URE PAGES (CLIP ALL LC nrui � �- • 12/10/98 GreenSheetNumber: 38624 ARTAffiNT aZRSCTOR 2 iTY COONCIL ITY ATTOPNSY ITY Q,BR% toa�.ss¢cvrp I r[oNxeQVES�n: Improve the alley in BLOCIC 3, RYAN PLACE (BOUnded by Hartford, ssissippi Blvd., Randolph and Mouat Curve Blvd.) by grading and paving with bituminous material Project # 18891. PLANNWC COh1MISS10N CIVIL SERVICE COMMISSION A SIAFF Public Health .RSONAL SERVICE CANTRACTS MUST ANSWER TAE FOLIAR'ING: � Has the persodfirm ever worked under a contract for Wis department? YES NO Elas tLis person/frm ever been a City�ployee? YES NO Does this persodficm possess a sldll not normally possessed by any YES NO cm comt.�m'ee — v �� B�� �'rent City employee? Ezylain aVl YFS answers on a sepaz2te sheet and aUach. �TING PROBLEM, ISSUE, OPFORTIIIVITY (Who, Whay When, Where, Why?): This improvement was initiated by a petition signed by 81 % of the property owners. VTAGESIFAPPROVED: � will have imoroved ride. anaearance and drainaee. �ANTAGES IF APPROVED: Normal problems associated with �ANTAGES IF NOT APPROVED: will continue to deteriorate. such as noise. dust AMOUNT OF'CRANSACT[ON: �j$ ,259.00 COSTlREVENUE BUDGETED (CIRCLE ONE) IG SOURCE: A55CSSM8IIfS O11I}' ACTIVI'PY NOMBER: 'IAL INFORMATION: (F,XPLAII� . Propertv owners will be notified of the nublic hearing and charees. .y� � g,�es:j t�' !V^° �CSg?fo{ Q�€� .E� 9� 4��� . . _..,.__. .._ - - � -- __' yy-�� �,. CITY OF ST. PAUL PRELIMINARY ORD&R ORIGfNAL 3/ BY I F E I30. �� '���� ���1wi FILL+ NO. 18891 VOTING WARD 3 In the Matter of improving the alley in Block 3, Ryan Place by grading and paving with bituminous material. (Bounded by Randolph, Mount Curve, Hartford, and Mississippi Blvd. project # 18891). The Council of the CiCy of Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: l. That the said report and the same is hereby approved with no alternatives, and that the estimated cost thereof is $ 40788.00 financed by assessments only. 2. That a public hearing be had on said improvement on Wednesday, lOth dav of Februarv, 1999, at 5:30 o'clock P.M., in the Council Chambers of the City Hall and Court House Building in the City of 5aint Paul. 3. That notice of said public hearing be given to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cost thereof as estimated. COUNCILPERSONS Yeas Nays ✓ Blakey ✓ Bostrom n, , o,-; ,. ✓ Harris �d- ✓ &ett.man �/ Tl-�nnP �G�.fq✓ � (.���nr 1 In Favor G O/L ir79� (A6� t�r 1 L��'��c� �Ag q a / inst /Zc.YC/ Z HaSI�JZ Adopted by Council: Certi� f;z�Tass B �c�� Y il Secretary Mayor i18891P0) DEPARTMENT OF PUBLIC WORKS Stacy M. Becker, Directar Thomas J. Eggum, City Engineer CITY OF SAINT PAUL Norm Caleman, Mayor 99-�qo �`� � Larry Lueth, Construction Engineer 900 Ciry Hal! Arsnez Telephone: 612-266-6080 Sairst Paul, MN 55102 Facsimi[e: 6I2-292-63I5 November 18, 1998 Mr. Peter White Right-of-Way �ngineer 140 City Hall Saint Paul, Minnesota 55102 � �: . . �E.;',!. F RE: BLOCK 3, RYAN PLACE Dear Mr. White: Please take the necessary steps to schedule a public hearing on the following matter: Improve the alley in BLOCK 3, RYAN PLACE (bounded by Hartford, Mississippi River Blvd., Randolph and Mount Curve Blvd.) By grading and paving with bituminous material. Also, condemning and taking an easement in the land necessary for the slopes, cuts and fills, including right of removal of lateral support from subject land or remainder thereof, occasioned by excavations thereof or construction of slopes in the gradinc and paving of said alley. Attached are a Summary of Engineering Recommendations, an area map, and Green Sheet. Sincerely, ?,.� �� �� Paul St. Martin Civil Engineer IV PSM:bk Attachments Responsive Services • Qualiry FaciliNes • Employee Pride � I i 1 �) i � .Q ` � � G v '/ \ � � 0 � (�) Y � �� v M N N 'r " 9 0 \� � • 4 O � I i } RANDOLPH ,,,,.. � /.0 2G � .S q ioo.JY TN'_'__ 100 Z� tr3� I ^ �'' CG iD1.93 > /Bf.TI '' �' .�v� � _�_ _ . ` � '" 27 (,� (IC 2 � � �u �T� 27 J , i9: z5 �Pl.2C ` i3'.a2 J _ ' � - - - - L - - - („� 3 J - 28 `z' � i99.S7 L z 1�0.26 � 13P 69 e 29 (2� (fb7 '� ' c �3b� 21 �" 202 BP �g3.1( •-rr 7c Qe� 4 30 C3> C�v 5 (� j 2 �2 /0(.2S �42.23 6 __Z , -_31-____ � 2e) 6 _ �.wJ 31 � _ 209 52 199.25 /Y? S 3z (a� (a 7 ( 32 2�z 8r za1.zS wv 7f 33 (5) (2zJ, 8 ° �4z> 3'S _ 216.i6 205.25 146Ca 34 �2i> 9 �°3) 34 _ _ _ __ 2/9 XI- -- � 20B>ZS �� 3 35 ��� �Z9� IO . �44) fs 2Z2 �9 2//.2S raE S� 3 C <n �zn �� rAs� sc �. 226.// 2/M.2S � IV9.B4 - � - � �''�j- - (z`> �Z : (�, 37 z zzs.sc �. ' � ' �U sa �e� ------_13-?--- ---�rg�--� z3e.x ' 220.2M ' / 2.3P i z- -.'Siz43.L r, - � - - , Cz'> 14 : (a�l) 39 2Y .29 -' _ 233-2-Y-PYJ:�Z � /53 6S C-is oa � H 257 �5 9) �Ze) T2052Y (A6) �� i A '� ` N N I . �i� �_JZc`�'� � 'TI >O� z6�oz zz�.�v M ti ----�= ' + /56/9 42 (ioJ �Zy� 17 ° ° �4q� -02 z�l.31 232.2Y �°, � � i57 v6 _ _ - _ -[=L°L - 43 �So� I8 � ( 43 21S.7S 235.24 IS ]3 44 (ir> (5» 19 � ( -04 _ 295 2sa.zv r /59 9 qS Yo.�Y �sz> 20 ----- �en 45 302.6i Z �Zµ `F� �. /G/2G :"/3.7r 2t>, � 46 (33� -�--21i i°�3) �Q6 301 Od " 2vY,13 �l � �lZ.S+ 1 2i �r � 9 97 (�J ------�----- /sw� .Q7 -_ __3o/..5� .___ _. ZvL23 � `_ i63 �29.e2 �3 oi� .��. 4B / __ _ 23 0 � t55! 4a _ 30/ a3 ____ 2SO.L3 -- �65 0' _ - _ 92 - _ �3� 24 . (SC�� � S` S e ° soo 49 r.s» (rzc ?ao. �__ ._ __-^--z3'37T.��'- � o: i66��v 50 �ia] �'Sr.� ZS � ,� 50 � c+ Joo a 2SC.B/ �oo.oY C1. SS 99-�9a 0 Summary of Engineering Recommendations Report Prepared - October 18, 1998 Finial Order PROJECT Imptove the alley in Block 3, Ryan Place (bounded by Hartford, Mississippi Blvd., Randolph, and Moun[ Curve Blvd.) by grading and paving with a bituminous material. Also condemning and taking an easement in the necessary for the slopes, cuts, and fills, including right of removal of lateral support from subject land or land reminder [hereof, occasional by excavations thereof or construction of slopes in the grading and paving of said alley. INTfIATING ACTIONS This improvement was initiated by a petition of 81 % of the property owners. the alley is plat[ed 20 feet wide. The surface of the alley is oiled. PROPOSED IMPROVEMENT: Grade the alley to a width of 16' and place a hot mix bituminous pavement. ESTIMATED COST AND FINANCING: Estimated Constmction Cost Engineering/Inspection Service Fee Miscellaneous Estimated Tota] Expenditures $32,040.00 9,610.00 2,880.00 13,729.00 $58,259.00 Financing - Assessments INFORMATIONAL MEETING Not scheduled yet. SOURCE OF ADDTI'IONAL INFORMATION: $58,259.00 For additional inforrna[ion, contac[ Paul St. Martin at 266-6ll 8. SUMMARY OF RECOMMENDATIONS: The Department of Public Works recommends [ha[ this project be constmcted. Respectfully submitted, Paul St. Martin Project Engineer