99-736CITY OF SAINT PAt7L COUNC L FILE NO. �4 -��p
FINAL ORDER IN SY � S �
CONDE�A7ATION PROCEEDINGS 0 R I G I N A L FILE NO. 18902-5
VOTING WARD 6
Ia the M,atter of condemaing and takiag aa easemeat in the laad necessary for the
slope, cuts and fills ia conneatioa with the grading aad paving of the alley in
Block 3, Phalen 8eights Park,(bounded by Earl,Hyacinth,Frank and Orange).
under Preliminary Order 1 1
A public hearing having been had upon the above improvem�nt upon due notice,
and the Council having heard all persons, objections and recommendations relative
thereto, and having fully considered the same; herefore, be it
RESOLVED, That the Council of the City of Saint Pau1 hereby orders said
improvement to be made.
Furthex Resolved, That the Council hereby determines that the estate required
for this improvement be as described above, and that the proper City officers submit
a report to the City Council for the purpose of the Council's making an award of
damages for the interest acquired and determination of assessments, if any, against
the benefitted property.
COUNCILPERSONS
Yeas Nays
�enanav
c�8lakey
+�Sostrom
�leman
�arris
v�antry
y Fteiter
t In Favor
� Against
Adopted by Council: Date_����"�
Certified Passed by Council Secretary
�
Public Hearin Date Re uested: July 28,1999
T.M.S.JREAL ESTATE DIVI5ION Date:
Condct Peison and Pho¢e Nomber: �
PAULST.MARTIN(PUB.WKS.) 266-6118
(«,�+)
co�u n n 7-14-99
, # OF SIGNATURE PAGES
LOCATIONS
���� �l.q-�3�
Green Sheet Nnmber: 09429
R1'h1ENT DIILECfOR CITY COUNCII.
A7TORNEY Tl'Y CLERK
:El'DIILECI'OR FFICEOFFAIANCIAI.SVCS
JR (OR ASSLSTANl) � COUNCII. RESEARCFI
Condemning and taking an easement in the land necessary for the slope, cuts and fills in connection with the grading
and paving of the alley in Block 3, Phalen Heights Pazk (Block bounded by Earl,Hyacinth, Frank and Orange)
TMS F'ile#189025
ECOMMENDATIONS: APPROVE (A) OR REJECf (R) �RS�N ERVSCE CAN
PLANNW G COMMISSION
CR'II. SERViCE CAMMLSSION
AL S S MUST ANSWER THE FOLLOR'IlVG.
Has the personlfirm erer worked under a Conttact for this depaclment? YFS NO
Has t6is persoMfirm ever been a City employee?
YES NO
. Does this person/£u�m posses,s a sidll not norinally possessed by any YES NO
cm corvmnlTee ��t City employee?
E lain a11 YES answers on a se azate sheet and attach.
1RTS WfTICH COUNCIL OBJECTIVE?
COUNCII. WARD(S) (� DISTRICT PLANNING COUNCIL 5
�TING PROBLEM, ISSUE, OPPOR'PUNIT'1 (Who� Whak �4 �ere, 4Vhy?):
iunprovement was initiated by a petition signed by 75% of the property owners.
>VANl'AGES IF APPRO'VED:
Amount of maintenance needed on the alley will be reduced.
TAGES TF APPROVED:
problems associated with construc6on, such as noise, dust and general disrugtions.
ISADVANTAGES IF NOT APPROVED:
The improved alley will deteriorate much quicker without the proper slopes, cuts and fills.
rox,u, aMOnrrr oF TxaNSacrtox: To be determiued. coszrn�vErtt� suucE�n ccu�cf.E o�
?UNDING SOURCE: AC'1'IVI7'Y NUMBER:
�II3ANCIAL INFORMATION: iEXPLA]N)
.. �1�..,��..
1. . -' C t
�s xo
A STeIFF
�
Summary of Engineering Recommendations
Report Prepazed - Apri120, 1999
Final Order Hearing
PROJECT
�q_2��
Improve the Alley in Block 3, Phalen Heights Park (bounded by Eazl, Hyacinth, Frank and Orange) hy
grading and paving with bituminous material. Also, condemning and taking an easement in the land
necessary for the slopes, cuts and fills, including right of removal of lateral support from subject land or
remainder thereof, occasioned by excavations thereof of construction of slopes in the grading and paving
of said alley.
INiTLATING ACTION:
This improvement was initiated by a petition signed by 75%o of the property owners.
EXISTING CONDITIONS
The alley is platted 20 feet wide. The surface of the alley is oiled.
PROPOSED IMPROVEMENT:
Grade the alley to a width of 16' and place a hot mix bituminous pavement.
ESTIMATED COST AND FINANCING:
Estimated Construction Cost
Engineering(Inspection
Service Fee
Miscellaneous
Estimafed Total Expenditures
$I 1,740.00
3,525.00
920.00
2 354.20
$18,539.20
Pinancing - Assessments
Estimated Rate per Assessable Foot
INFORMATIONAL MEETING:
Noi scheduled yet.
SOURCE OF ADDITIONAL INFOItMATION:
$18,539.20
$ 16.00
For additional information, contact Paal St. Martin at (651) 266-6118.
SUMMARY OF RECOMMENDATIONS:
The Department of Public Works recommends ihat this project be constructed.
Respectfully submitted,
Paul St. Mutin
Project Engineer
�-��
, _ �; _; �
�' I m � `-' j 6:
1
Q li � � � �I �
\
6G
�
�
�
` _ < , (1
\
if.lJ �
, � .
�, - --,�,,
, �, � o
� w ^
ti o'
� 0 4 .
� � O`
n
Q m �
� v �
m
� � `,
i
� �
��, �� ��
�-�.
■
�
F 2PN 4c.
��—*. 66 Jt � fa - . ' � " ie � �i...i.f
�n:/ .^. W � I_ i�, - I w. .
, b � 4 1 � � � � ~ ~'� �
�`I� "' � � � � � � v }, �V \
� � b�. 1 v � q b� �Z',- �� h �
� � � � i � I _ �� � �� A \ �
. � o i j '�. Y" +�
'C�
�.. � I s, i � �o �i,�
, �
' � � � � l ii.
� i1/.
.a, ,� , . �� �
�j c.. b � .,a e
. � DN \ �
� ' N;, A O NO � � ,
w .
y ':�S_-Y— � W ;� .
l.� y � ^ ♦ v �
Y �
A � H N T'= � �_
N V w �
�^y' • � (u' �.
v
� '� G
_ � `°- i'
M � � �
�• o �,�, w I `� N'
� I
� � p q K �� �
� T
T !�
O > � � —IV- �. W \/ �
m o r S
p � � J Y � `-' , I
� �a � � � yco',
v C� m � ' � �
: �
• �--=—
S T. �
" —
ti y' ry; �� �
.o o ,� o . � 1— ' ° I �
4 "�/ �
_ � : �---�.
� b o � � ���?
� .. ,. �
�� N � � ' W ��
�' q � i.
o �r 1
�` \ �`
R.��. `'�.� .G i. l� .
�
I
�
F
�t,`( -'� 3 �
CITY OF ST. PAVL COUNCIL FILE NO. �`� yS9
PRELIMIIQP.RY ORDER � BY � � ,��
ORIG(NAL FILE N . 18902-5 ��
VOTZNG WARD 6
In the Matter a£ condemning and talsing an easemeat in the land necessary for the
slope, cuts and fills ia connection with tha grading and paving o£ the alley in
Block 3, Phalen Heights Park,(bounded by Earl,Hyaciath,Frank and Orange)_
The Council of the City of Saint Paul having received the report of the Mayor
upon the above improvement, and having considered said report, hereby resolves:
1
2
3
That the said report and the same is hereby approved with no alterraatives, and
that the estimated cost thereof is not yet dete�ined.
That a public hearing be had on said improvement on the 28nd dav of ,3u1v,1999.
at 5:30 o'clock P.M.. in the Council Chambers of the City EIall and Court House
Building in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimateci.
COUNCILPERSONS
Yeas Nays
✓Benanav
�akey
v�ostrom
�leman
�farri s
�ntry
t�Reiter
�In Favor
�.Agains t
Adopted by Council: Date���l l��
Certified Passed by Council Sec etary
BY � C�- )°�crv—�
�
Mayor
�°� -���t
NOTSCB Or PUBLIC 'r'.EARING
A public hearing will be held before the Saint Paul City Council
on August 11, 1999 at 5:30 P.M. in the Council Chambers on the 3
floor-of C�ty Hal1. The purpose of the hearing is to approve the
slopes, cuts and fill easements necessary to complete the alley
i;nprovement in B1ock 3, Phalen Heights Park_
Dated July 28, 199°
Shari Moore
Deputy City Clerk
(Ju1y 31, 1°99)
�`�.3a� '4�i'�S�a�� Cs'2.;9��'t
��i� �i e� ���5
CITY OF SAINT PAt7L COUNC L FILE NO. �4 -��p
FINAL ORDER IN SY � S �
CONDE�A7ATION PROCEEDINGS 0 R I G I N A L FILE NO. 18902-5
VOTING WARD 6
Ia the M,atter of condemaing and takiag aa easemeat in the laad necessary for the
slope, cuts and fills ia conneatioa with the grading aad paving of the alley in
Block 3, Phalen 8eights Park,(bounded by Earl,Hyacinth,Frank and Orange).
under Preliminary Order 1 1
A public hearing having been had upon the above improvem�nt upon due notice,
and the Council having heard all persons, objections and recommendations relative
thereto, and having fully considered the same; herefore, be it
RESOLVED, That the Council of the City of Saint Pau1 hereby orders said
improvement to be made.
Furthex Resolved, That the Council hereby determines that the estate required
for this improvement be as described above, and that the proper City officers submit
a report to the City Council for the purpose of the Council's making an award of
damages for the interest acquired and determination of assessments, if any, against
the benefitted property.
COUNCILPERSONS
Yeas Nays
�enanav
c�8lakey
+�Sostrom
�leman
�arris
v�antry
y Fteiter
t In Favor
� Against
Adopted by Council: Date_����"�
Certified Passed by Council Secretary
�
Public Hearin Date Re uested: July 28,1999
T.M.S.JREAL ESTATE DIVI5ION Date:
Condct Peison and Pho¢e Nomber: �
PAULST.MARTIN(PUB.WKS.) 266-6118
(«,�+)
co�u n n 7-14-99
, # OF SIGNATURE PAGES
LOCATIONS
���� �l.q-�3�
Green Sheet Nnmber: 09429
R1'h1ENT DIILECfOR CITY COUNCII.
A7TORNEY Tl'Y CLERK
:El'DIILECI'OR FFICEOFFAIANCIAI.SVCS
JR (OR ASSLSTANl) � COUNCII. RESEARCFI
Condemning and taking an easement in the land necessary for the slope, cuts and fills in connection with the grading
and paving of the alley in Block 3, Phalen Heights Pazk (Block bounded by Earl,Hyacinth, Frank and Orange)
TMS F'ile#189025
ECOMMENDATIONS: APPROVE (A) OR REJECf (R) �RS�N ERVSCE CAN
PLANNW G COMMISSION
CR'II. SERViCE CAMMLSSION
AL S S MUST ANSWER THE FOLLOR'IlVG.
Has the personlfirm erer worked under a Conttact for this depaclment? YFS NO
Has t6is persoMfirm ever been a City employee?
YES NO
. Does this person/£u�m posses,s a sidll not norinally possessed by any YES NO
cm corvmnlTee ��t City employee?
E lain a11 YES answers on a se azate sheet and attach.
1RTS WfTICH COUNCIL OBJECTIVE?
COUNCII. WARD(S) (� DISTRICT PLANNING COUNCIL 5
�TING PROBLEM, ISSUE, OPPOR'PUNIT'1 (Who� Whak �4 �ere, 4Vhy?):
iunprovement was initiated by a petition signed by 75% of the property owners.
>VANl'AGES IF APPRO'VED:
Amount of maintenance needed on the alley will be reduced.
TAGES TF APPROVED:
problems associated with construc6on, such as noise, dust and general disrugtions.
ISADVANTAGES IF NOT APPROVED:
The improved alley will deteriorate much quicker without the proper slopes, cuts and fills.
rox,u, aMOnrrr oF TxaNSacrtox: To be determiued. coszrn�vErtt� suucE�n ccu�cf.E o�
?UNDING SOURCE: AC'1'IVI7'Y NUMBER:
�II3ANCIAL INFORMATION: iEXPLA]N)
.. �1�..,��..
1. . -' C t
�s xo
A STeIFF
�
Summary of Engineering Recommendations
Report Prepazed - Apri120, 1999
Final Order Hearing
PROJECT
�q_2��
Improve the Alley in Block 3, Phalen Heights Park (bounded by Eazl, Hyacinth, Frank and Orange) hy
grading and paving with bituminous material. Also, condemning and taking an easement in the land
necessary for the slopes, cuts and fills, including right of removal of lateral support from subject land or
remainder thereof, occasioned by excavations thereof of construction of slopes in the grading and paving
of said alley.
INiTLATING ACTION:
This improvement was initiated by a petition signed by 75%o of the property owners.
EXISTING CONDITIONS
The alley is platted 20 feet wide. The surface of the alley is oiled.
PROPOSED IMPROVEMENT:
Grade the alley to a width of 16' and place a hot mix bituminous pavement.
ESTIMATED COST AND FINANCING:
Estimated Construction Cost
Engineering(Inspection
Service Fee
Miscellaneous
Estimafed Total Expenditures
$I 1,740.00
3,525.00
920.00
2 354.20
$18,539.20
Pinancing - Assessments
Estimated Rate per Assessable Foot
INFORMATIONAL MEETING:
Noi scheduled yet.
SOURCE OF ADDITIONAL INFOItMATION:
$18,539.20
$ 16.00
For additional information, contact Paal St. Martin at (651) 266-6118.
SUMMARY OF RECOMMENDATIONS:
The Department of Public Works recommends ihat this project be constructed.
Respectfully submitted,
Paul St. Mutin
Project Engineer
�-��
, _ �; _; �
�' I m � `-' j 6:
1
Q li � � � �I �
\
6G
�
�
�
` _ < , (1
\
if.lJ �
, � .
�, - --,�,,
, �, � o
� w ^
ti o'
� 0 4 .
� � O`
n
Q m �
� v �
m
� � `,
i
� �
��, �� ��
�-�.
■
�
F 2PN 4c.
��—*. 66 Jt � fa - . ' � " ie � �i...i.f
�n:/ .^. W � I_ i�, - I w. .
, b � 4 1 � � � � ~ ~'� �
�`I� "' � � � � � � v }, �V \
� � b�. 1 v � q b� �Z',- �� h �
� � � � i � I _ �� � �� A \ �
. � o i j '�. Y" +�
'C�
�.. � I s, i � �o �i,�
, �
' � � � � l ii.
� i1/.
.a, ,� , . �� �
�j c.. b � .,a e
. � DN \ �
� ' N;, A O NO � � ,
w .
y ':�S_-Y— � W ;� .
l.� y � ^ ♦ v �
Y �
A � H N T'= � �_
N V w �
�^y' • � (u' �.
v
� '� G
_ � `°- i'
M � � �
�• o �,�, w I `� N'
� I
� � p q K �� �
� T
T !�
O > � � —IV- �. W \/ �
m o r S
p � � J Y � `-' , I
� �a � � � yco',
v C� m � ' � �
: �
• �--=—
S T. �
" —
ti y' ry; �� �
.o o ,� o . � 1— ' ° I �
4 "�/ �
_ � : �---�.
� b o � � ���?
� .. ,. �
�� N � � ' W ��
�' q � i.
o �r 1
�` \ �`
R.��. `'�.� .G i. l� .
�
I
�
F
�t,`( -'� 3 �
CITY OF ST. PAVL COUNCIL FILE NO. �`� yS9
PRELIMIIQP.RY ORDER � BY � � ,��
ORIG(NAL FILE N . 18902-5 ��
VOTZNG WARD 6
In the Matter a£ condemning and talsing an easemeat in the land necessary for the
slope, cuts and fills ia connection with tha grading and paving o£ the alley in
Block 3, Phalen Heights Park,(bounded by Earl,Hyaciath,Frank and Orange)_
The Council of the City of Saint Paul having received the report of the Mayor
upon the above improvement, and having considered said report, hereby resolves:
1
2
3
That the said report and the same is hereby approved with no alterraatives, and
that the estimated cost thereof is not yet dete�ined.
That a public hearing be had on said improvement on the 28nd dav of ,3u1v,1999.
at 5:30 o'clock P.M.. in the Council Chambers of the City EIall and Court House
Building in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimateci.
COUNCILPERSONS
Yeas Nays
✓Benanav
�akey
v�ostrom
�leman
�farri s
�ntry
t�Reiter
�In Favor
�.Agains t
Adopted by Council: Date���l l��
Certified Passed by Council Sec etary
BY � C�- )°�crv—�
�
Mayor
�°� -���t
NOTSCB Or PUBLIC 'r'.EARING
A public hearing will be held before the Saint Paul City Council
on August 11, 1999 at 5:30 P.M. in the Council Chambers on the 3
floor-of C�ty Hal1. The purpose of the hearing is to approve the
slopes, cuts and fill easements necessary to complete the alley
i;nprovement in B1ock 3, Phalen Heights Park_
Dated July 28, 199°
Shari Moore
Deputy City Clerk
(Ju1y 31, 1°99)
�`�.3a� '4�i'�S�a�� Cs'2.;9��'t
��i� �i e� ���5
CITY OF SAINT PAt7L COUNC L FILE NO. �4 -��p
FINAL ORDER IN SY � S �
CONDE�A7ATION PROCEEDINGS 0 R I G I N A L FILE NO. 18902-5
VOTING WARD 6
Ia the M,atter of condemaing and takiag aa easemeat in the laad necessary for the
slope, cuts and fills ia conneatioa with the grading aad paving of the alley in
Block 3, Phalen 8eights Park,(bounded by Earl,Hyacinth,Frank and Orange).
under Preliminary Order 1 1
A public hearing having been had upon the above improvem�nt upon due notice,
and the Council having heard all persons, objections and recommendations relative
thereto, and having fully considered the same; herefore, be it
RESOLVED, That the Council of the City of Saint Pau1 hereby orders said
improvement to be made.
Furthex Resolved, That the Council hereby determines that the estate required
for this improvement be as described above, and that the proper City officers submit
a report to the City Council for the purpose of the Council's making an award of
damages for the interest acquired and determination of assessments, if any, against
the benefitted property.
COUNCILPERSONS
Yeas Nays
�enanav
c�8lakey
+�Sostrom
�leman
�arris
v�antry
y Fteiter
t In Favor
� Against
Adopted by Council: Date_����"�
Certified Passed by Council Secretary
�
Public Hearin Date Re uested: July 28,1999
T.M.S.JREAL ESTATE DIVI5ION Date:
Condct Peison and Pho¢e Nomber: �
PAULST.MARTIN(PUB.WKS.) 266-6118
(«,�+)
co�u n n 7-14-99
, # OF SIGNATURE PAGES
LOCATIONS
���� �l.q-�3�
Green Sheet Nnmber: 09429
R1'h1ENT DIILECfOR CITY COUNCII.
A7TORNEY Tl'Y CLERK
:El'DIILECI'OR FFICEOFFAIANCIAI.SVCS
JR (OR ASSLSTANl) � COUNCII. RESEARCFI
Condemning and taking an easement in the land necessary for the slope, cuts and fills in connection with the grading
and paving of the alley in Block 3, Phalen Heights Pazk (Block bounded by Earl,Hyacinth, Frank and Orange)
TMS F'ile#189025
ECOMMENDATIONS: APPROVE (A) OR REJECf (R) �RS�N ERVSCE CAN
PLANNW G COMMISSION
CR'II. SERViCE CAMMLSSION
AL S S MUST ANSWER THE FOLLOR'IlVG.
Has the personlfirm erer worked under a Conttact for this depaclment? YFS NO
Has t6is persoMfirm ever been a City employee?
YES NO
. Does this person/£u�m posses,s a sidll not norinally possessed by any YES NO
cm corvmnlTee ��t City employee?
E lain a11 YES answers on a se azate sheet and attach.
1RTS WfTICH COUNCIL OBJECTIVE?
COUNCII. WARD(S) (� DISTRICT PLANNING COUNCIL 5
�TING PROBLEM, ISSUE, OPPOR'PUNIT'1 (Who� Whak �4 �ere, 4Vhy?):
iunprovement was initiated by a petition signed by 75% of the property owners.
>VANl'AGES IF APPRO'VED:
Amount of maintenance needed on the alley will be reduced.
TAGES TF APPROVED:
problems associated with construc6on, such as noise, dust and general disrugtions.
ISADVANTAGES IF NOT APPROVED:
The improved alley will deteriorate much quicker without the proper slopes, cuts and fills.
rox,u, aMOnrrr oF TxaNSacrtox: To be determiued. coszrn�vErtt� suucE�n ccu�cf.E o�
?UNDING SOURCE: AC'1'IVI7'Y NUMBER:
�II3ANCIAL INFORMATION: iEXPLA]N)
.. �1�..,��..
1. . -' C t
�s xo
A STeIFF
�
Summary of Engineering Recommendations
Report Prepazed - Apri120, 1999
Final Order Hearing
PROJECT
�q_2��
Improve the Alley in Block 3, Phalen Heights Park (bounded by Eazl, Hyacinth, Frank and Orange) hy
grading and paving with bituminous material. Also, condemning and taking an easement in the land
necessary for the slopes, cuts and fills, including right of removal of lateral support from subject land or
remainder thereof, occasioned by excavations thereof of construction of slopes in the grading and paving
of said alley.
INiTLATING ACTION:
This improvement was initiated by a petition signed by 75%o of the property owners.
EXISTING CONDITIONS
The alley is platted 20 feet wide. The surface of the alley is oiled.
PROPOSED IMPROVEMENT:
Grade the alley to a width of 16' and place a hot mix bituminous pavement.
ESTIMATED COST AND FINANCING:
Estimated Construction Cost
Engineering(Inspection
Service Fee
Miscellaneous
Estimafed Total Expenditures
$I 1,740.00
3,525.00
920.00
2 354.20
$18,539.20
Pinancing - Assessments
Estimated Rate per Assessable Foot
INFORMATIONAL MEETING:
Noi scheduled yet.
SOURCE OF ADDITIONAL INFOItMATION:
$18,539.20
$ 16.00
For additional information, contact Paal St. Martin at (651) 266-6118.
SUMMARY OF RECOMMENDATIONS:
The Department of Public Works recommends ihat this project be constructed.
Respectfully submitted,
Paul St. Mutin
Project Engineer
�-��
, _ �; _; �
�' I m � `-' j 6:
1
Q li � � � �I �
\
6G
�
�
�
` _ < , (1
\
if.lJ �
, � .
�, - --,�,,
, �, � o
� w ^
ti o'
� 0 4 .
� � O`
n
Q m �
� v �
m
� � `,
i
� �
��, �� ��
�-�.
■
�
F 2PN 4c.
��—*. 66 Jt � fa - . ' � " ie � �i...i.f
�n:/ .^. W � I_ i�, - I w. .
, b � 4 1 � � � � ~ ~'� �
�`I� "' � � � � � � v }, �V \
� � b�. 1 v � q b� �Z',- �� h �
� � � � i � I _ �� � �� A \ �
. � o i j '�. Y" +�
'C�
�.. � I s, i � �o �i,�
, �
' � � � � l ii.
� i1/.
.a, ,� , . �� �
�j c.. b � .,a e
. � DN \ �
� ' N;, A O NO � � ,
w .
y ':�S_-Y— � W ;� .
l.� y � ^ ♦ v �
Y �
A � H N T'= � �_
N V w �
�^y' • � (u' �.
v
� '� G
_ � `°- i'
M � � �
�• o �,�, w I `� N'
� I
� � p q K �� �
� T
T !�
O > � � —IV- �. W \/ �
m o r S
p � � J Y � `-' , I
� �a � � � yco',
v C� m � ' � �
: �
• �--=—
S T. �
" —
ti y' ry; �� �
.o o ,� o . � 1— ' ° I �
4 "�/ �
_ � : �---�.
� b o � � ���?
� .. ,. �
�� N � � ' W ��
�' q � i.
o �r 1
�` \ �`
R.��. `'�.� .G i. l� .
�
I
�
F
�t,`( -'� 3 �
CITY OF ST. PAVL COUNCIL FILE NO. �`� yS9
PRELIMIIQP.RY ORDER � BY � � ,��
ORIG(NAL FILE N . 18902-5 ��
VOTZNG WARD 6
In the Matter a£ condemning and talsing an easemeat in the land necessary for the
slope, cuts and fills ia connection with tha grading and paving o£ the alley in
Block 3, Phalen Heights Park,(bounded by Earl,Hyaciath,Frank and Orange)_
The Council of the City of Saint Paul having received the report of the Mayor
upon the above improvement, and having considered said report, hereby resolves:
1
2
3
That the said report and the same is hereby approved with no alterraatives, and
that the estimated cost thereof is not yet dete�ined.
That a public hearing be had on said improvement on the 28nd dav of ,3u1v,1999.
at 5:30 o'clock P.M.. in the Council Chambers of the City EIall and Court House
Building in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimateci.
COUNCILPERSONS
Yeas Nays
✓Benanav
�akey
v�ostrom
�leman
�farri s
�ntry
t�Reiter
�In Favor
�.Agains t
Adopted by Council: Date���l l��
Certified Passed by Council Sec etary
BY � C�- )°�crv—�
�
Mayor
�°� -���t
NOTSCB Or PUBLIC 'r'.EARING
A public hearing will be held before the Saint Paul City Council
on August 11, 1999 at 5:30 P.M. in the Council Chambers on the 3
floor-of C�ty Hal1. The purpose of the hearing is to approve the
slopes, cuts and fill easements necessary to complete the alley
i;nprovement in B1ock 3, Phalen Heights Park_
Dated July 28, 199°
Shari Moore
Deputy City Clerk
(Ju1y 31, 1°99)
�`�.3a� '4�i'�S�a�� Cs'2.;9��'t
��i� �i e� ���5