99-209ORIGINAL
CITY OF ST. PAIIL
FINAL ORDER
�
�o� =� N . �� -ao9
BY �
FILE NO. 18892d-i
VOTING WARD 3
In the Matter of improving the alley in Block 3,Sylvan Park Addition and
Block 2, Vernon's RE.(Bounded by Brimhall, St. Clair, Saratoga, and Sandford
Project # 18892d-i with Pascal-Jefferson Project 18882) by grading and paving
with a bituminous material.
under Preliminary
� \ °--
'3 �,"�;
The Council of the City of Saint Paul has conducted a public hearing
upon the above improvement, due notice thereof having been given as
prescribed by the City Charter; and
WHEREAS, The Council has heard all persons, objections and
recommendations pertaining to said proposed improvement and has fully
considered the same; now, therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order
that the above-described improvement be made, and the proper City officers
are hereby directed and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the
proper City officers shall calculate all expenses incurred therein and shall
report the same to the City Council in accordance with Chapter 14 of the City
Charter.
COIINCILPERSON
Yea Nay
✓Benanav
�Blakey
_�CBostrom
�Coleman
�Harris
�Lantry
_�eiter
{-", In
� Against
Adopted by the Date: �`�� l�cl�
Certified Passes by Council Secretary
$y �- ,
� �
3 /�/� Mayor
Public Hearing : March 3, 1999
T.M.S./REAL ESTATE DIVISION
'ontact Persan aad Phone Pl�ber:
Paul St. Martin 266-6118
Sos[ be on Comd Agenda by:
Comcil Reuarch �ce
Date:
���
12/24/98 Green Sheet Number:
EPdFtTdffiTf DIRECTOR 'L CITY CODNCIL
ITY STTORNEY ITY CLERR
1
38470
provement of the alley in Block 3,Sylvan Park Addition and Block 2, Vernon's
.(Boundad by Brimhall, St. Clair, Saratoga, and Sandford Project # 18892d-i
th Pascal-Jefferson Project 18882) by grading and paving with a bituminous
tarial.
IRSONAL SERVICE CONTRACTS M[IST ANSWER THE FOLLOWING:
Has the person/£rm ever worked mder a contract for Utis deparhnent? YES NO
PLANMNG COMMLSSION
A STAFF
Has this perso�firm ever been a Cily employee?
C[VIL
Pubtic Health
YES NO
. Does this perso�&rm possess a skill not nornially possessed by any YES NO
current Cl'ty employee?
Cffi COMMITT&E Vacant Bidgs
Eaplain all YES answers on a separate sheet and attacL.
�TING PROBLEM, ISSi7E, OPPORTlJNITY (Whq What, Wh�, Where, Why?): �
IFAPPROVED:
will have improved ride, appearance and drainage. This project will be coordinated with the
UJefferson Residental Street Vitality Project ..;, n„„�,. �
�nrrrncES � nrraov�: _ .. . . .v a..... _
��� � � t�`�'�
APPROVED:
.C+� i1
dOUNTOFTRANSACTION: 19�LOO.00 COST/AEVENOEBUDGETED(CIRCLEONE)
so�cE: Assessments only AcTivizY rrUnlsm:
.L INFORMATiON: (EXPLAI�
tv owners will be no6tied of the nublic hearing and chazges.
� NO
DEPARTMENT OF PUBLIC WORKS
Stacy M. Becker, Director
Thomas J. Eggum, Ciry Engineer � q_ ao q
CITY OF SAINT PAUL
Norm Colemars, Mayvr
Larry Lueth, Consduction Engineer
900 City Ha11 Annes Telephone: 612-266-6080
Saint Pauf, MN 55102 Facsimile: 612-292-6315
December 18, 1998
Mr. Peter White
Right-of-Way Engineer
140 City Hall
Saint Paul, Minnesota 55102
RE: File 18892D
Block 3, Sylvan Park Addition and Block 2, Vernon's RE.
Dear Mr. White:
Please take the necessary steps to schedule a public hearing on the following matter:
Improve the alley in BLOCK 3, SYLVAN PARK ADDITION AND
BLOCK 2, VERNON'S RE. (bounded by Brimhall, St. Clair, Saratoga
and Stanfordj by grading and paving with bituminous material. Also,
condemning and taking an easement in the land necessary for the slopes,
cuts and fills, including right of removal of lateral support from subject
land or remainder thereof, occasioned by excavations thereof or construction
of slopes in the grading and paving of said alley.
Attached are a Summary of Engineering Recommendations, an area map, and Green
Sheet.
S� er , <1 �� n ���
� � r
Paul St. Martin
Civil Engineer IV
Attachments
ResponsiveServices • QualityFacilities • EmployeePride
�
Summary of Engineering Recommendations
Report Prepared - December 18, 1998
Final Order Hearing
PROJECT:
��-�.09
Improve the Alley in Block 3, Sylvan Park Addition and Block 2, Vernon's RE. (bounded by
Brimhall, St.Clair, Sazatoga and Stanford) by grading and paving with bituminous material.
Also, condemning and taking an easement in the land necessary for the siopes, cuts and fills,
including right of removal of lateral support from subject land or remainder thereof, occasioned
by excavauons tltereof of construction of slopes in grading and paving of said alley.
INTI'IATING ACTION:
This improvement was initiated by a petition signed by 62% of the property owners.
EXISTING CONDTTIONS:
The alley is platted 15 feet wide. The surface of the alley is oiled.
PROPOSED IMPROVEMENT:
Grade the alley to a width of 14' and piace a hot mix bituminous pavement.
ESTIMATED COST AND FINANCING:
Estimated Construction Cost
Engineering/Inspection
Service Fee
Miscellaneous
Estimated Total Bxpenditures
$12,020.00
3,610.00
1,090.00
2.480.00
$19,200.00
Financing - Assessments
Estimated Rate per Assessable Foot
INFORMATIONAL MEETING:
Not scheduled yet.
SOURCE OF ADDTI'IONAL INFORMATION:
$19,200.00
$ 16.00
For additional information, contacY Paul St. Martin at 266-6118.
SUMMARY OF RECOMMENDATIONS:
The Department of Public Works recommends that this project be constructed.
Respectfully submitted,
Paul St. Martin
Project Engineer
/ � Y•
ALLEY II�IPROVEMENT
ALLEY BOUNDED BY BRIMHALL, ST. CLAIR, SARATOGA, AND STANDFORD
FILE i\0.18892D OF PASCAL-JEFFERSON PI20JECT
Esitimated project cost-�19,200
Esitimated rate per foot-S 16.00
Financed 100 % by Assessments
FILE NO. 18892D-S
Condemning and taking an easement in the land necessary for the slopes, cuts, and fills,
including the right of removal of lateral support from subject land or reminder thereof, occasional
by excavations thereof or construction of slopes in the grading and paving of the north south
alley bounded by Brimhall, St. Clair, Saratoga, and Sandford Project # 18892d-3 with Pascal-
Jefferson Project 18852.
A� 0 (Z "T 1-I
� "'"—£��9�f� '
� ,
� �,�
lzi.3Y r Ve ip. '+'..3Y a �i i ief� �+.xi . • �• n
1 UVr) � .d• � i
1 �'� t
- . 1 '_" ^ J..... � � Z �J
2 � "�Z' s ^ � 1 2 3 24 23 2' .
/ � / : 1" f'ea �
_`Vl � f C���� � � O.�b/ �laei ~
(lG51 � n^�7. 1 � � ` � "
3 ,�. ° . �.,.. .
� � ' � . � P3CA (119) QS+� 4
� C/:L) ; (�bU-., �. irii } ;aa.`u's) _ (.I73� 2� ~ Y �' S �4
5 � i Ua�>.�. .
i "�
� ... _ 6 ..
6 �2,� � uso> -
Cnn '-
_... _.;._....
I i ._ —
7 � i (�'.t) _ g.._.:
�-
8 �vLb' i U,n �;' g
�' � '
� (im� .. i o -
9 � ::.
� 0�5)-.... �� '-
10 (l49 ) �
� •
� (n<�.�.../z.....
il !„o� ; p,n :� i3 ,
1
� Z ; �
a . CII1>
_' �.'_' �,�bs-
-� _ ..s ' mv� �
� _..
s
G G :� Oz+�
� 7t: Gzn
� .. y . ...
� ���� C�tei
io �_nes�
Usz. 7 D
ds�> �9
tn=e 18
t�zt� 17
—�_
(iza� 16
(ieii �S
pu� �4
L
�
(��
`�J
6
7 (�:�
8 C�»
9 (��
IO (!��
II �w�
�Z, (671
I_ 3 J
�'I (6
15 <xo�
.,.> � �
�'TANf
, yp-(n') �(i�n i>{I �.. Ni'.i(�zh�`= (iz3� �3 51
� ..1 I � . .r�Jg ., b.
i
--- - - - � STAr� F6rLfl � � -
+ ,%,.,, p { oe»;,. AREA TO BE � ���,� � ���s z4 �
I�i 1PROVED .-. . -- '
Z (2u , I (�6t) : . QYJI 1
, ��uit�iuunun.u i p` 23
t,
i � I (33�
p 2 :BK�
Questions? Construction 266-61 IS Assessments 256-8862
ORIGIN�
CITY OF 53'.. �
PRELIMII�tyv'��
�,�1-2-� 9
COII FILE NO. �� s`�
BY i°7'� ['��
FILE NO. 18892d-i — r
VOTI23G WARD 3
In the MattErol�' Tm= roving the alley in Block 3,Sylvan Park Addition and
Block 2, Vernoci� RE_(Bounded by Brimhall, St. Clair, Saratoga, and Sandford
Project # 18�9�i.with Pascal-Jefferson Project 18882) by grading and paving
with a bit� material.
The Co�crf the City of Saint Paul having received the report of the
Mayor upon t� �zave improvement, and having considered said report, hereby
resolves:
1. That �e said report and the same is hereby approved with no
a1t�Eives, and that the estimated cost thereof is $ 19,200.00
f»°Ad by assessments only.
2. Tha'� � public hearing be had on said improvement on Wednesday,
3rs3 �av of March, 1999, at 5:30 o'clock P.M., in the Council
Cham�rs of the City Hall and Court House Building in the City of
Sain� Paul.
3. That arstice of said public hearing be given to the persons and in
the m�nner provided by the Charter, stating the time and place of
heari.ng, the nature of the improvement and the total cost thereof
as esLimated.
COUNCILPERSOI�
Yeas Nays
✓B,.akey
✓BOStrom
��-r+"�^-r- ��r l..vv.� �l
{�bs�}—Harris
�/en,.� �,-a t1 cvwv..,J
� 'R �:i-�,/
� Co\aw.4�
ra In Favor
O Against
� ��se��
Adopted by Council: Date �'a � q
Certified Passed by Counci Secretary
By� � � � „_ �� -
�
Mayor
(18892d-iP0)
ORIGINAL
CITY OF ST. PAIIL
FINAL ORDER
�
�o� =� N . �� -ao9
BY �
FILE NO. 18892d-i
VOTING WARD 3
In the Matter of improving the alley in Block 3,Sylvan Park Addition and
Block 2, Vernon's RE.(Bounded by Brimhall, St. Clair, Saratoga, and Sandford
Project # 18892d-i with Pascal-Jefferson Project 18882) by grading and paving
with a bituminous material.
under Preliminary
� \ °--
'3 �,"�;
The Council of the City of Saint Paul has conducted a public hearing
upon the above improvement, due notice thereof having been given as
prescribed by the City Charter; and
WHEREAS, The Council has heard all persons, objections and
recommendations pertaining to said proposed improvement and has fully
considered the same; now, therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order
that the above-described improvement be made, and the proper City officers
are hereby directed and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the
proper City officers shall calculate all expenses incurred therein and shall
report the same to the City Council in accordance with Chapter 14 of the City
Charter.
COIINCILPERSON
Yea Nay
✓Benanav
�Blakey
_�CBostrom
�Coleman
�Harris
�Lantry
_�eiter
{-", In
� Against
Adopted by the Date: �`�� l�cl�
Certified Passes by Council Secretary
$y �- ,
� �
3 /�/� Mayor
Public Hearing : March 3, 1999
T.M.S./REAL ESTATE DIVISION
'ontact Persan aad Phone Pl�ber:
Paul St. Martin 266-6118
Sos[ be on Comd Agenda by:
Comcil Reuarch �ce
Date:
���
12/24/98 Green Sheet Number:
EPdFtTdffiTf DIRECTOR 'L CITY CODNCIL
ITY STTORNEY ITY CLERR
1
38470
provement of the alley in Block 3,Sylvan Park Addition and Block 2, Vernon's
.(Boundad by Brimhall, St. Clair, Saratoga, and Sandford Project # 18892d-i
th Pascal-Jefferson Project 18882) by grading and paving with a bituminous
tarial.
IRSONAL SERVICE CONTRACTS M[IST ANSWER THE FOLLOWING:
Has the person/£rm ever worked mder a contract for Utis deparhnent? YES NO
PLANMNG COMMLSSION
A STAFF
Has this perso�firm ever been a Cily employee?
C[VIL
Pubtic Health
YES NO
. Does this perso�&rm possess a skill not nornially possessed by any YES NO
current Cl'ty employee?
Cffi COMMITT&E Vacant Bidgs
Eaplain all YES answers on a separate sheet and attacL.
�TING PROBLEM, ISSi7E, OPPORTlJNITY (Whq What, Wh�, Where, Why?): �
IFAPPROVED:
will have improved ride, appearance and drainage. This project will be coordinated with the
UJefferson Residental Street Vitality Project ..;, n„„�,. �
�nrrrncES � nrraov�: _ .. . . .v a..... _
��� � � t�`�'�
APPROVED:
.C+� i1
dOUNTOFTRANSACTION: 19�LOO.00 COST/AEVENOEBUDGETED(CIRCLEONE)
so�cE: Assessments only AcTivizY rrUnlsm:
.L INFORMATiON: (EXPLAI�
tv owners will be no6tied of the nublic hearing and chazges.
� NO
DEPARTMENT OF PUBLIC WORKS
Stacy M. Becker, Director
Thomas J. Eggum, Ciry Engineer � q_ ao q
CITY OF SAINT PAUL
Norm Colemars, Mayvr
Larry Lueth, Consduction Engineer
900 City Ha11 Annes Telephone: 612-266-6080
Saint Pauf, MN 55102 Facsimile: 612-292-6315
December 18, 1998
Mr. Peter White
Right-of-Way Engineer
140 City Hall
Saint Paul, Minnesota 55102
RE: File 18892D
Block 3, Sylvan Park Addition and Block 2, Vernon's RE.
Dear Mr. White:
Please take the necessary steps to schedule a public hearing on the following matter:
Improve the alley in BLOCK 3, SYLVAN PARK ADDITION AND
BLOCK 2, VERNON'S RE. (bounded by Brimhall, St. Clair, Saratoga
and Stanfordj by grading and paving with bituminous material. Also,
condemning and taking an easement in the land necessary for the slopes,
cuts and fills, including right of removal of lateral support from subject
land or remainder thereof, occasioned by excavations thereof or construction
of slopes in the grading and paving of said alley.
Attached are a Summary of Engineering Recommendations, an area map, and Green
Sheet.
S� er , <1 �� n ���
� � r
Paul St. Martin
Civil Engineer IV
Attachments
ResponsiveServices • QualityFacilities • EmployeePride
�
Summary of Engineering Recommendations
Report Prepared - December 18, 1998
Final Order Hearing
PROJECT:
��-�.09
Improve the Alley in Block 3, Sylvan Park Addition and Block 2, Vernon's RE. (bounded by
Brimhall, St.Clair, Sazatoga and Stanford) by grading and paving with bituminous material.
Also, condemning and taking an easement in the land necessary for the siopes, cuts and fills,
including right of removal of lateral support from subject land or remainder thereof, occasioned
by excavauons tltereof of construction of slopes in grading and paving of said alley.
INTI'IATING ACTION:
This improvement was initiated by a petition signed by 62% of the property owners.
EXISTING CONDTTIONS:
The alley is platted 15 feet wide. The surface of the alley is oiled.
PROPOSED IMPROVEMENT:
Grade the alley to a width of 14' and piace a hot mix bituminous pavement.
ESTIMATED COST AND FINANCING:
Estimated Construction Cost
Engineering/Inspection
Service Fee
Miscellaneous
Estimated Total Bxpenditures
$12,020.00
3,610.00
1,090.00
2.480.00
$19,200.00
Financing - Assessments
Estimated Rate per Assessable Foot
INFORMATIONAL MEETING:
Not scheduled yet.
SOURCE OF ADDTI'IONAL INFORMATION:
$19,200.00
$ 16.00
For additional information, contacY Paul St. Martin at 266-6118.
SUMMARY OF RECOMMENDATIONS:
The Department of Public Works recommends that this project be constructed.
Respectfully submitted,
Paul St. Martin
Project Engineer
/ � Y•
ALLEY II�IPROVEMENT
ALLEY BOUNDED BY BRIMHALL, ST. CLAIR, SARATOGA, AND STANDFORD
FILE i\0.18892D OF PASCAL-JEFFERSON PI20JECT
Esitimated project cost-�19,200
Esitimated rate per foot-S 16.00
Financed 100 % by Assessments
FILE NO. 18892D-S
Condemning and taking an easement in the land necessary for the slopes, cuts, and fills,
including the right of removal of lateral support from subject land or reminder thereof, occasional
by excavations thereof or construction of slopes in the grading and paving of the north south
alley bounded by Brimhall, St. Clair, Saratoga, and Sandford Project # 18892d-3 with Pascal-
Jefferson Project 18852.
A� 0 (Z "T 1-I
� "'"—£��9�f� '
� ,
� �,�
lzi.3Y r Ve ip. '+'..3Y a �i i ief� �+.xi . • �• n
1 UVr) � .d• � i
1 �'� t
- . 1 '_" ^ J..... � � Z �J
2 � "�Z' s ^ � 1 2 3 24 23 2' .
/ � / : 1" f'ea �
_`Vl � f C���� � � O.�b/ �laei ~
(lG51 � n^�7. 1 � � ` � "
3 ,�. ° . �.,.. .
� � ' � . � P3CA (119) QS+� 4
� C/:L) ; (�bU-., �. irii } ;aa.`u's) _ (.I73� 2� ~ Y �' S �4
5 � i Ua�>.�. .
i "�
� ... _ 6 ..
6 �2,� � uso> -
Cnn '-
_... _.;._....
I i ._ —
7 � i (�'.t) _ g.._.:
�-
8 �vLb' i U,n �;' g
�' � '
� (im� .. i o -
9 � ::.
� 0�5)-.... �� '-
10 (l49 ) �
� •
� (n<�.�.../z.....
il !„o� ; p,n :� i3 ,
1
� Z ; �
a . CII1>
_' �.'_' �,�bs-
-� _ ..s ' mv� �
� _..
s
G G :� Oz+�
� 7t: Gzn
� .. y . ...
� ���� C�tei
io �_nes�
Usz. 7 D
ds�> �9
tn=e 18
t�zt� 17
—�_
(iza� 16
(ieii �S
pu� �4
L
�
(��
`�J
6
7 (�:�
8 C�»
9 (��
IO (!��
II �w�
�Z, (671
I_ 3 J
�'I (6
15 <xo�
.,.> � �
�'TANf
, yp-(n') �(i�n i>{I �.. Ni'.i(�zh�`= (iz3� �3 51
� ..1 I � . .r�Jg ., b.
i
--- - - - � STAr� F6rLfl � � -
+ ,%,.,, p { oe»;,. AREA TO BE � ���,� � ���s z4 �
I�i 1PROVED .-. . -- '
Z (2u , I (�6t) : . QYJI 1
, ��uit�iuunun.u i p` 23
t,
i � I (33�
p 2 :BK�
Questions? Construction 266-61 IS Assessments 256-8862
ORIGIN�
CITY OF 53'.. �
PRELIMII�tyv'��
�,�1-2-� 9
COII FILE NO. �� s`�
BY i°7'� ['��
FILE NO. 18892d-i — r
VOTI23G WARD 3
In the MattErol�' Tm= roving the alley in Block 3,Sylvan Park Addition and
Block 2, Vernoci� RE_(Bounded by Brimhall, St. Clair, Saratoga, and Sandford
Project # 18�9�i.with Pascal-Jefferson Project 18882) by grading and paving
with a bit� material.
The Co�crf the City of Saint Paul having received the report of the
Mayor upon t� �zave improvement, and having considered said report, hereby
resolves:
1. That �e said report and the same is hereby approved with no
a1t�Eives, and that the estimated cost thereof is $ 19,200.00
f»°Ad by assessments only.
2. Tha'� � public hearing be had on said improvement on Wednesday,
3rs3 �av of March, 1999, at 5:30 o'clock P.M., in the Council
Cham�rs of the City Hall and Court House Building in the City of
Sain� Paul.
3. That arstice of said public hearing be given to the persons and in
the m�nner provided by the Charter, stating the time and place of
heari.ng, the nature of the improvement and the total cost thereof
as esLimated.
COUNCILPERSOI�
Yeas Nays
✓B,.akey
✓BOStrom
��-r+"�^-r- ��r l..vv.� �l
{�bs�}—Harris
�/en,.� �,-a t1 cvwv..,J
� 'R �:i-�,/
� Co\aw.4�
ra In Favor
O Against
� ��se��
Adopted by Council: Date �'a � q
Certified Passed by Counci Secretary
By� � � � „_ �� -
�
Mayor
(18892d-iP0)
ORIGINAL
CITY OF ST. PAIIL
FINAL ORDER
�
�o� =� N . �� -ao9
BY �
FILE NO. 18892d-i
VOTING WARD 3
In the Matter of improving the alley in Block 3,Sylvan Park Addition and
Block 2, Vernon's RE.(Bounded by Brimhall, St. Clair, Saratoga, and Sandford
Project # 18892d-i with Pascal-Jefferson Project 18882) by grading and paving
with a bituminous material.
under Preliminary
� \ °--
'3 �,"�;
The Council of the City of Saint Paul has conducted a public hearing
upon the above improvement, due notice thereof having been given as
prescribed by the City Charter; and
WHEREAS, The Council has heard all persons, objections and
recommendations pertaining to said proposed improvement and has fully
considered the same; now, therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order
that the above-described improvement be made, and the proper City officers
are hereby directed and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the
proper City officers shall calculate all expenses incurred therein and shall
report the same to the City Council in accordance with Chapter 14 of the City
Charter.
COIINCILPERSON
Yea Nay
✓Benanav
�Blakey
_�CBostrom
�Coleman
�Harris
�Lantry
_�eiter
{-", In
� Against
Adopted by the Date: �`�� l�cl�
Certified Passes by Council Secretary
$y �- ,
� �
3 /�/� Mayor
Public Hearing : March 3, 1999
T.M.S./REAL ESTATE DIVISION
'ontact Persan aad Phone Pl�ber:
Paul St. Martin 266-6118
Sos[ be on Comd Agenda by:
Comcil Reuarch �ce
Date:
���
12/24/98 Green Sheet Number:
EPdFtTdffiTf DIRECTOR 'L CITY CODNCIL
ITY STTORNEY ITY CLERR
1
38470
provement of the alley in Block 3,Sylvan Park Addition and Block 2, Vernon's
.(Boundad by Brimhall, St. Clair, Saratoga, and Sandford Project # 18892d-i
th Pascal-Jefferson Project 18882) by grading and paving with a bituminous
tarial.
IRSONAL SERVICE CONTRACTS M[IST ANSWER THE FOLLOWING:
Has the person/£rm ever worked mder a contract for Utis deparhnent? YES NO
PLANMNG COMMLSSION
A STAFF
Has this perso�firm ever been a Cily employee?
C[VIL
Pubtic Health
YES NO
. Does this perso�&rm possess a skill not nornially possessed by any YES NO
current Cl'ty employee?
Cffi COMMITT&E Vacant Bidgs
Eaplain all YES answers on a separate sheet and attacL.
�TING PROBLEM, ISSi7E, OPPORTlJNITY (Whq What, Wh�, Where, Why?): �
IFAPPROVED:
will have improved ride, appearance and drainage. This project will be coordinated with the
UJefferson Residental Street Vitality Project ..;, n„„�,. �
�nrrrncES � nrraov�: _ .. . . .v a..... _
��� � � t�`�'�
APPROVED:
.C+� i1
dOUNTOFTRANSACTION: 19�LOO.00 COST/AEVENOEBUDGETED(CIRCLEONE)
so�cE: Assessments only AcTivizY rrUnlsm:
.L INFORMATiON: (EXPLAI�
tv owners will be no6tied of the nublic hearing and chazges.
� NO
DEPARTMENT OF PUBLIC WORKS
Stacy M. Becker, Director
Thomas J. Eggum, Ciry Engineer � q_ ao q
CITY OF SAINT PAUL
Norm Colemars, Mayvr
Larry Lueth, Consduction Engineer
900 City Ha11 Annes Telephone: 612-266-6080
Saint Pauf, MN 55102 Facsimile: 612-292-6315
December 18, 1998
Mr. Peter White
Right-of-Way Engineer
140 City Hall
Saint Paul, Minnesota 55102
RE: File 18892D
Block 3, Sylvan Park Addition and Block 2, Vernon's RE.
Dear Mr. White:
Please take the necessary steps to schedule a public hearing on the following matter:
Improve the alley in BLOCK 3, SYLVAN PARK ADDITION AND
BLOCK 2, VERNON'S RE. (bounded by Brimhall, St. Clair, Saratoga
and Stanfordj by grading and paving with bituminous material. Also,
condemning and taking an easement in the land necessary for the slopes,
cuts and fills, including right of removal of lateral support from subject
land or remainder thereof, occasioned by excavations thereof or construction
of slopes in the grading and paving of said alley.
Attached are a Summary of Engineering Recommendations, an area map, and Green
Sheet.
S� er , <1 �� n ���
� � r
Paul St. Martin
Civil Engineer IV
Attachments
ResponsiveServices • QualityFacilities • EmployeePride
�
Summary of Engineering Recommendations
Report Prepared - December 18, 1998
Final Order Hearing
PROJECT:
��-�.09
Improve the Alley in Block 3, Sylvan Park Addition and Block 2, Vernon's RE. (bounded by
Brimhall, St.Clair, Sazatoga and Stanford) by grading and paving with bituminous material.
Also, condemning and taking an easement in the land necessary for the siopes, cuts and fills,
including right of removal of lateral support from subject land or remainder thereof, occasioned
by excavauons tltereof of construction of slopes in grading and paving of said alley.
INTI'IATING ACTION:
This improvement was initiated by a petition signed by 62% of the property owners.
EXISTING CONDTTIONS:
The alley is platted 15 feet wide. The surface of the alley is oiled.
PROPOSED IMPROVEMENT:
Grade the alley to a width of 14' and piace a hot mix bituminous pavement.
ESTIMATED COST AND FINANCING:
Estimated Construction Cost
Engineering/Inspection
Service Fee
Miscellaneous
Estimated Total Bxpenditures
$12,020.00
3,610.00
1,090.00
2.480.00
$19,200.00
Financing - Assessments
Estimated Rate per Assessable Foot
INFORMATIONAL MEETING:
Not scheduled yet.
SOURCE OF ADDTI'IONAL INFORMATION:
$19,200.00
$ 16.00
For additional information, contacY Paul St. Martin at 266-6118.
SUMMARY OF RECOMMENDATIONS:
The Department of Public Works recommends that this project be constructed.
Respectfully submitted,
Paul St. Martin
Project Engineer
/ � Y•
ALLEY II�IPROVEMENT
ALLEY BOUNDED BY BRIMHALL, ST. CLAIR, SARATOGA, AND STANDFORD
FILE i\0.18892D OF PASCAL-JEFFERSON PI20JECT
Esitimated project cost-�19,200
Esitimated rate per foot-S 16.00
Financed 100 % by Assessments
FILE NO. 18892D-S
Condemning and taking an easement in the land necessary for the slopes, cuts, and fills,
including the right of removal of lateral support from subject land or reminder thereof, occasional
by excavations thereof or construction of slopes in the grading and paving of the north south
alley bounded by Brimhall, St. Clair, Saratoga, and Sandford Project # 18892d-3 with Pascal-
Jefferson Project 18852.
A� 0 (Z "T 1-I
� "'"—£��9�f� '
� ,
� �,�
lzi.3Y r Ve ip. '+'..3Y a �i i ief� �+.xi . • �• n
1 UVr) � .d• � i
1 �'� t
- . 1 '_" ^ J..... � � Z �J
2 � "�Z' s ^ � 1 2 3 24 23 2' .
/ � / : 1" f'ea �
_`Vl � f C���� � � O.�b/ �laei ~
(lG51 � n^�7. 1 � � ` � "
3 ,�. ° . �.,.. .
� � ' � . � P3CA (119) QS+� 4
� C/:L) ; (�bU-., �. irii } ;aa.`u's) _ (.I73� 2� ~ Y �' S �4
5 � i Ua�>.�. .
i "�
� ... _ 6 ..
6 �2,� � uso> -
Cnn '-
_... _.;._....
I i ._ —
7 � i (�'.t) _ g.._.:
�-
8 �vLb' i U,n �;' g
�' � '
� (im� .. i o -
9 � ::.
� 0�5)-.... �� '-
10 (l49 ) �
� •
� (n<�.�.../z.....
il !„o� ; p,n :� i3 ,
1
� Z ; �
a . CII1>
_' �.'_' �,�bs-
-� _ ..s ' mv� �
� _..
s
G G :� Oz+�
� 7t: Gzn
� .. y . ...
� ���� C�tei
io �_nes�
Usz. 7 D
ds�> �9
tn=e 18
t�zt� 17
—�_
(iza� 16
(ieii �S
pu� �4
L
�
(��
`�J
6
7 (�:�
8 C�»
9 (��
IO (!��
II �w�
�Z, (671
I_ 3 J
�'I (6
15 <xo�
.,.> � �
�'TANf
, yp-(n') �(i�n i>{I �.. Ni'.i(�zh�`= (iz3� �3 51
� ..1 I � . .r�Jg ., b.
i
--- - - - � STAr� F6rLfl � � -
+ ,%,.,, p { oe»;,. AREA TO BE � ���,� � ���s z4 �
I�i 1PROVED .-. . -- '
Z (2u , I (�6t) : . QYJI 1
, ��uit�iuunun.u i p` 23
t,
i � I (33�
p 2 :BK�
Questions? Construction 266-61 IS Assessments 256-8862
ORIGIN�
CITY OF 53'.. �
PRELIMII�tyv'��
�,�1-2-� 9
COII FILE NO. �� s`�
BY i°7'� ['��
FILE NO. 18892d-i — r
VOTI23G WARD 3
In the MattErol�' Tm= roving the alley in Block 3,Sylvan Park Addition and
Block 2, Vernoci� RE_(Bounded by Brimhall, St. Clair, Saratoga, and Sandford
Project # 18�9�i.with Pascal-Jefferson Project 18882) by grading and paving
with a bit� material.
The Co�crf the City of Saint Paul having received the report of the
Mayor upon t� �zave improvement, and having considered said report, hereby
resolves:
1. That �e said report and the same is hereby approved with no
a1t�Eives, and that the estimated cost thereof is $ 19,200.00
f»°Ad by assessments only.
2. Tha'� � public hearing be had on said improvement on Wednesday,
3rs3 �av of March, 1999, at 5:30 o'clock P.M., in the Council
Cham�rs of the City Hall and Court House Building in the City of
Sain� Paul.
3. That arstice of said public hearing be given to the persons and in
the m�nner provided by the Charter, stating the time and place of
heari.ng, the nature of the improvement and the total cost thereof
as esLimated.
COUNCILPERSOI�
Yeas Nays
✓B,.akey
✓BOStrom
��-r+"�^-r- ��r l..vv.� �l
{�bs�}—Harris
�/en,.� �,-a t1 cvwv..,J
� 'R �:i-�,/
� Co\aw.4�
ra In Favor
O Against
� ��se��
Adopted by Council: Date �'a � q
Certified Passed by Counci Secretary
By� � � � „_ �� -
�
Mayor
(18892d-iP0)