99-114ORIGINAL
CITY OF ST. PAUL
FINAL ORDER
30
COUNC L FIL �r70. �q �I��
a �
BY
FILE O. 18888
VOTIIdG 4TARD 5
Ia the Matter of constructing the following streets with bituminous roadway, concrete curh and b tter, concrete
driveway aprons, boulevard sodding, tree planting, constmction of a lantern style lighting system, water sanitary sewer and
storm sewer service connections, watermain, and doing all other work necessary to complete said impravement for the
COHANSEY PARK PAVING AND LIGHTING PROJECT :
MACKUBIN STREET
COHANSEY STREET
IDAHO AVENUE
-From Larpenteur Avenue to Idaho Avenue.
-from Idaho Avenue north to Cul-de-sac.
-from Mackubin Street to Cohansey Street.
under Preliminary Order b O`� }�,G�j approved k� �-- �� � ���,�
The Council of tlze City of Saint Paul has conducted a public hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, ThaC upon the completion of said improvement, the nroper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSON
Yea Nays
✓ Benanav
� Blakey
� Bostrom
� Coleman
Aarris
�-
�� Lantry
� Reiter
� In
—� Against
Adopted by the Date: � � � `�c�e,�
�
Certified Passes by Council Secretary
By `�` ��- �n�..,a
�C_� ��
Mayor
� ��
Public Hearin : Febru 3, 1999 �� 1
T.M.S./REAL ESTATE DIVISION Date: 11/30/98 Greea Sheet Number: 63088
9- �
OIItact PBxsOII dIId Phoae NUIDl)BS: BPART!ffi�7T DZRECTOR 2 CSTY COi1NCIL
Peter White 266-8850 =� H1TO _� `
nst be on Comci{ Agenda by: 1218/1999 "' � ""° °' `�" �-
ust be in Comd Research O�ce lY4/1999
y noon on FYiday . ro.. ns�n�� 1 i n....Ke
AL # OF SIGI�AII\TQRE PAGHS 1 (CLIP ALL LOCATIONS FOR SIGlATORE)
TION RBQIISSTED:
e construction of bit�inons roadway, concrete curb and gntter, concrete driveway aprons, boulevard sodding, tree
lanting, construction of a lantern style lighting system, water sanitary sewer and storm sewer service connections,
atermain, and doing all other work necessary to compiete said improvement for the COHANSEY PARK PAVING
LIGHTINGPROJECT: (project lses8).
aoes: usnova <.� oa vs.ma ui gRSpi7AT, SSRVICE CONTRACTS MUST ANSWSR T88 FOLLOWIt3G:
1. Has the persoa/Eirm ever worked vader a contract for this
epastmeat? YES No
PLASIIiIpO COP3[ISSION A STApP
8as this yarson/Firm evar baea a City employae? YES NO
CML SBRVICB C0141ISSI06
Does this persoa/firm eossess a skill aot aormally Hossessed by
y Y&S NO
currant City employee7
C2H COD]YITTEE
Explaia all YSS aaswers oa a se8arate shaet aad attach.
UPPORTS WHICH COVNCIL OSJBCTNE?
COSINCIL 47ARD(S) 5 DISIRICT PLANNING COUNCIL (
INITIATING PROBLB[4, ISSUfi� OPPORTONITY (LPho, SPhat, LPhea, Where, Why?):
0 Townhomes will not have bituminous roadway, lantern style lighting system, water sanitary sewer and stoTTn sewer
ervice connections, watermain, and aU other work necessa to com lete the COAANSEY PARK PROJECT..,.:
AN'PAGES IF APPROVED: ������ ,a �� ` � ' �(n ' �. r`-
0 new townhomes will enhance the nei hborhood aesthetics. ��
ISADVANlAG88 IF APPROVED: '"� �
ormal roblems associated with construction, such as noise, dust, and eneral disru tion will occur.
ISADVANTAGBS IF NOT APPROVED:
3U townhomes will not be developed.
ar. nmovrrr oF TRANSACTION: �Z9S ,424.52 cosTix�vsmoe soncaxaa ccincne oNS> zES No
ING SOURCE: A ACTIVITY NOPffi8R: �
INANCIAL INFORI4ATION: (BXPLAIN)
ORIGINAL
CITY OF ST. PAUL
PRELIMINARY ORDER
qg-ti�{
3a
COUNCIL FI E NO. �l�` ���S
! �
BY
FILE NO. 18888
VOTING WARD
Ia the Matter of constructing the following streets with bituminous roadway, concrete curb and gutter, concrete
driveway aprons, bonlevazd sodding, tree planting, construction of a lantem style lighting system, water sanitary sewer and
storm sewer service connections, watermain, and doing all other work necessary to complete said improvement for the
COHANSEY PARK PAVING AND LIGHTING PROJECT :
MACKUBIN STREET
COHANSEY STREET
IDAHO AVENUE
-from Lazpenteur Avenue to Idaho Avenue.
-from Idaho Avenue north to C�1-de-sac.
-from Mackubin Street to Cohansey Street.
The Council of the City of Saint Pau1 having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1. That the said report and the same is hereby approved with no
alternatives, and that the estimated cost thereof is $295,424.52 financed
by assessments.
2_
3
That a public hearing be had on said improvement on Wednesday, the
3rd dav of Februarv, 1999. at 5:30 o'clock P.M., in the Council Chambers
of the City Hall and Court House Building in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the
manner provided by the Charter, stating the time and place of hearing,
the nature of the improvement and the total cost thereof as estimated.
COUNCILPERSQNS
Yeas Nays
✓lakey
✓Bostrom
�✓�x�ia 1..�,�.�-�
✓�fegar�l 15 ev�a�.✓
ncc. �n,cn kZc : � � ,�
'�' .�II.€Col�W�nv�
�In Favor
QAgainst
Adopted by Council: Date �
Certified Passed by Council Secretary
BY � —_, �l. �. _� �.�
Mayor
�
ORIGINAL
CITY OF ST. PAUL
FINAL ORDER
30
COUNC L FIL �r70. �q �I��
a �
BY
FILE O. 18888
VOTIIdG 4TARD 5
Ia the Matter of constructing the following streets with bituminous roadway, concrete curh and b tter, concrete
driveway aprons, boulevard sodding, tree planting, constmction of a lantern style lighting system, water sanitary sewer and
storm sewer service connections, watermain, and doing all other work necessary to complete said impravement for the
COHANSEY PARK PAVING AND LIGHTING PROJECT :
MACKUBIN STREET
COHANSEY STREET
IDAHO AVENUE
-From Larpenteur Avenue to Idaho Avenue.
-from Idaho Avenue north to Cul-de-sac.
-from Mackubin Street to Cohansey Street.
under Preliminary Order b O`� }�,G�j approved k� �-- �� � ���,�
The Council of tlze City of Saint Paul has conducted a public hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, ThaC upon the completion of said improvement, the nroper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSON
Yea Nays
✓ Benanav
� Blakey
� Bostrom
� Coleman
Aarris
�-
�� Lantry
� Reiter
� In
—� Against
Adopted by the Date: � � � `�c�e,�
�
Certified Passes by Council Secretary
By `�` ��- �n�..,a
�C_� ��
Mayor
� ��
Public Hearin : Febru 3, 1999 �� 1
T.M.S./REAL ESTATE DIVISION Date: 11/30/98 Greea Sheet Number: 63088
9- �
OIItact PBxsOII dIId Phoae NUIDl)BS: BPART!ffi�7T DZRECTOR 2 CSTY COi1NCIL
Peter White 266-8850 =� H1TO _� `
nst be on Comci{ Agenda by: 1218/1999 "' � ""° °' `�" �-
ust be in Comd Research O�ce lY4/1999
y noon on FYiday . ro.. ns�n�� 1 i n....Ke
AL # OF SIGI�AII\TQRE PAGHS 1 (CLIP ALL LOCATIONS FOR SIGlATORE)
TION RBQIISSTED:
e construction of bit�inons roadway, concrete curb and gntter, concrete driveway aprons, boulevard sodding, tree
lanting, construction of a lantern style lighting system, water sanitary sewer and storm sewer service connections,
atermain, and doing all other work necessary to compiete said improvement for the COHANSEY PARK PAVING
LIGHTINGPROJECT: (project lses8).
aoes: usnova <.� oa vs.ma ui gRSpi7AT, SSRVICE CONTRACTS MUST ANSWSR T88 FOLLOWIt3G:
1. Has the persoa/Eirm ever worked vader a contract for this
epastmeat? YES No
PLASIIiIpO COP3[ISSION A STApP
8as this yarson/Firm evar baea a City employae? YES NO
CML SBRVICB C0141ISSI06
Does this persoa/firm eossess a skill aot aormally Hossessed by
y Y&S NO
currant City employee7
C2H COD]YITTEE
Explaia all YSS aaswers oa a se8arate shaet aad attach.
UPPORTS WHICH COVNCIL OSJBCTNE?
COSINCIL 47ARD(S) 5 DISIRICT PLANNING COUNCIL (
INITIATING PROBLB[4, ISSUfi� OPPORTONITY (LPho, SPhat, LPhea, Where, Why?):
0 Townhomes will not have bituminous roadway, lantern style lighting system, water sanitary sewer and stoTTn sewer
ervice connections, watermain, and aU other work necessa to com lete the COAANSEY PARK PROJECT..,.:
AN'PAGES IF APPROVED: ������ ,a �� ` � ' �(n ' �. r`-
0 new townhomes will enhance the nei hborhood aesthetics. ��
ISADVANlAG88 IF APPROVED: '"� �
ormal roblems associated with construction, such as noise, dust, and eneral disru tion will occur.
ISADVANTAGBS IF NOT APPROVED:
3U townhomes will not be developed.
ar. nmovrrr oF TRANSACTION: �Z9S ,424.52 cosTix�vsmoe soncaxaa ccincne oNS> zES No
ING SOURCE: A ACTIVITY NOPffi8R: �
INANCIAL INFORI4ATION: (BXPLAIN)
ORIGINAL
CITY OF ST. PAUL
PRELIMINARY ORDER
qg-ti�{
3a
COUNCIL FI E NO. �l�` ���S
! �
BY
FILE NO. 18888
VOTING WARD
Ia the Matter of constructing the following streets with bituminous roadway, concrete curb and gutter, concrete
driveway aprons, bonlevazd sodding, tree planting, construction of a lantem style lighting system, water sanitary sewer and
storm sewer service connections, watermain, and doing all other work necessary to complete said improvement for the
COHANSEY PARK PAVING AND LIGHTING PROJECT :
MACKUBIN STREET
COHANSEY STREET
IDAHO AVENUE
-from Lazpenteur Avenue to Idaho Avenue.
-from Idaho Avenue north to C�1-de-sac.
-from Mackubin Street to Cohansey Street.
The Council of the City of Saint Pau1 having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1. That the said report and the same is hereby approved with no
alternatives, and that the estimated cost thereof is $295,424.52 financed
by assessments.
2_
3
That a public hearing be had on said improvement on Wednesday, the
3rd dav of Februarv, 1999. at 5:30 o'clock P.M., in the Council Chambers
of the City Hall and Court House Building in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the
manner provided by the Charter, stating the time and place of hearing,
the nature of the improvement and the total cost thereof as estimated.
COUNCILPERSQNS
Yeas Nays
✓lakey
✓Bostrom
�✓�x�ia 1..�,�.�-�
✓�fegar�l 15 ev�a�.✓
ncc. �n,cn kZc : � � ,�
'�' .�II.€Col�W�nv�
�In Favor
QAgainst
Adopted by Council: Date �
Certified Passed by Council Secretary
BY � —_, �l. �. _� �.�
Mayor
�
ORIGINAL
CITY OF ST. PAUL
FINAL ORDER
30
COUNC L FIL �r70. �q �I��
a �
BY
FILE O. 18888
VOTIIdG 4TARD 5
Ia the Matter of constructing the following streets with bituminous roadway, concrete curh and b tter, concrete
driveway aprons, boulevard sodding, tree planting, constmction of a lantern style lighting system, water sanitary sewer and
storm sewer service connections, watermain, and doing all other work necessary to complete said impravement for the
COHANSEY PARK PAVING AND LIGHTING PROJECT :
MACKUBIN STREET
COHANSEY STREET
IDAHO AVENUE
-From Larpenteur Avenue to Idaho Avenue.
-from Idaho Avenue north to Cul-de-sac.
-from Mackubin Street to Cohansey Street.
under Preliminary Order b O`� }�,G�j approved k� �-- �� � ���,�
The Council of tlze City of Saint Paul has conducted a public hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, ThaC upon the completion of said improvement, the nroper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSON
Yea Nays
✓ Benanav
� Blakey
� Bostrom
� Coleman
Aarris
�-
�� Lantry
� Reiter
� In
—� Against
Adopted by the Date: � � � `�c�e,�
�
Certified Passes by Council Secretary
By `�` ��- �n�..,a
�C_� ��
Mayor
� ��
Public Hearin : Febru 3, 1999 �� 1
T.M.S./REAL ESTATE DIVISION Date: 11/30/98 Greea Sheet Number: 63088
9- �
OIItact PBxsOII dIId Phoae NUIDl)BS: BPART!ffi�7T DZRECTOR 2 CSTY COi1NCIL
Peter White 266-8850 =� H1TO _� `
nst be on Comci{ Agenda by: 1218/1999 "' � ""° °' `�" �-
ust be in Comd Research O�ce lY4/1999
y noon on FYiday . ro.. ns�n�� 1 i n....Ke
AL # OF SIGI�AII\TQRE PAGHS 1 (CLIP ALL LOCATIONS FOR SIGlATORE)
TION RBQIISSTED:
e construction of bit�inons roadway, concrete curb and gntter, concrete driveway aprons, boulevard sodding, tree
lanting, construction of a lantern style lighting system, water sanitary sewer and storm sewer service connections,
atermain, and doing all other work necessary to compiete said improvement for the COHANSEY PARK PAVING
LIGHTINGPROJECT: (project lses8).
aoes: usnova <.� oa vs.ma ui gRSpi7AT, SSRVICE CONTRACTS MUST ANSWSR T88 FOLLOWIt3G:
1. Has the persoa/Eirm ever worked vader a contract for this
epastmeat? YES No
PLASIIiIpO COP3[ISSION A STApP
8as this yarson/Firm evar baea a City employae? YES NO
CML SBRVICB C0141ISSI06
Does this persoa/firm eossess a skill aot aormally Hossessed by
y Y&S NO
currant City employee7
C2H COD]YITTEE
Explaia all YSS aaswers oa a se8arate shaet aad attach.
UPPORTS WHICH COVNCIL OSJBCTNE?
COSINCIL 47ARD(S) 5 DISIRICT PLANNING COUNCIL (
INITIATING PROBLB[4, ISSUfi� OPPORTONITY (LPho, SPhat, LPhea, Where, Why?):
0 Townhomes will not have bituminous roadway, lantern style lighting system, water sanitary sewer and stoTTn sewer
ervice connections, watermain, and aU other work necessa to com lete the COAANSEY PARK PROJECT..,.:
AN'PAGES IF APPROVED: ������ ,a �� ` � ' �(n ' �. r`-
0 new townhomes will enhance the nei hborhood aesthetics. ��
ISADVANlAG88 IF APPROVED: '"� �
ormal roblems associated with construction, such as noise, dust, and eneral disru tion will occur.
ISADVANTAGBS IF NOT APPROVED:
3U townhomes will not be developed.
ar. nmovrrr oF TRANSACTION: �Z9S ,424.52 cosTix�vsmoe soncaxaa ccincne oNS> zES No
ING SOURCE: A ACTIVITY NOPffi8R: �
INANCIAL INFORI4ATION: (BXPLAIN)
ORIGINAL
CITY OF ST. PAUL
PRELIMINARY ORDER
qg-ti�{
3a
COUNCIL FI E NO. �l�` ���S
! �
BY
FILE NO. 18888
VOTING WARD
Ia the Matter of constructing the following streets with bituminous roadway, concrete curb and gutter, concrete
driveway aprons, bonlevazd sodding, tree planting, construction of a lantem style lighting system, water sanitary sewer and
storm sewer service connections, watermain, and doing all other work necessary to complete said improvement for the
COHANSEY PARK PAVING AND LIGHTING PROJECT :
MACKUBIN STREET
COHANSEY STREET
IDAHO AVENUE
-from Lazpenteur Avenue to Idaho Avenue.
-from Idaho Avenue north to C�1-de-sac.
-from Mackubin Street to Cohansey Street.
The Council of the City of Saint Pau1 having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1. That the said report and the same is hereby approved with no
alternatives, and that the estimated cost thereof is $295,424.52 financed
by assessments.
2_
3
That a public hearing be had on said improvement on Wednesday, the
3rd dav of Februarv, 1999. at 5:30 o'clock P.M., in the Council Chambers
of the City Hall and Court House Building in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the
manner provided by the Charter, stating the time and place of hearing,
the nature of the improvement and the total cost thereof as estimated.
COUNCILPERSQNS
Yeas Nays
✓lakey
✓Bostrom
�✓�x�ia 1..�,�.�-�
✓�fegar�l 15 ev�a�.✓
ncc. �n,cn kZc : � � ,�
'�' .�II.€Col�W�nv�
�In Favor
QAgainst
Adopted by Council: Date �
Certified Passed by Council Secretary
BY � —_, �l. �. _� �.�
Mayor
�