99-113QRfGINAL
CITY OF ST. PAUL
FINAI, ORDSR
a�
COUN L FILE C � �3
r
BY
FILB NO. 18884A
VOTING WARD 5
In the Matter of improving the following streets with bituminous roadway, construct
concrete curb and gutter, concrete driveway aprons and outwalks, boulevard sodding, tree
planting, construction of a lantern style lighting system, and doing all other work necessary
to complete said improvement for the GROTTOI HOYT STREET PAVING AND LIGHTING PROJECT :
VICTORIA STREET -Larpenteur Avenue to Arlington Avenue
under Preliminary Order 1 � - ����-- approved � �-- �� � `��
The Council of the City of Saint Paul has conducted a public hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City of£icers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSON
Yea Nays
�Benanav
✓ Blakey
✓ Bostrom
✓ Coleman
� Aarris
� Lantry
;/ 'Reiter
� In
O Against
Adopted by the Date: "� �� 1 Ci c�.-,4
�-
Certified Passes by Council Secretary
By �-(�$ � �.� �
,�
�
Mayor
Public Hearin : Febru 3, 1999 �.�.
T.M.S./RSAL ESTATE DIVISION Date: 11/30/98 Graen Sheet Number: 63087
R9 -�t3
oat8ct PBFSOa dIId PhOne N�ax: EPARTAffiiT DIRBCTOR Z CITY COUNCIL
�m
Peter White 266-8850 ^� _'''� A1'T°'e�r I''7 c�axx
�
ust be on Comcil Agenda by_ 12l16/1998 "" "�° °"°°�" `
ust be in Comcil Research �ce 12/4/1998
y noon on Frlday ioa .s.xaa�� y ss e....��n
AL # OF SIGPATQRE PAGSS 1 (CLIP ALL LOCATIONS FOR SIGf171TQRE)
TION RBQIIBSTBD:
his is an add on project to the Grotto-Hoyt Project area RSVP Projeck This Project is being completed as part of the Residential
treet Vitality Program (RSVP). This is one of several RSVP projects selected for 1999 construction by Public Works, and
pproved by the Long Range Capital Improvement Budget Committee and City CounciL (project 188S4A) .
wvs: vexova �a� oa �mna �n� gggONAI. SBRVICB CONTRACTS MfJST AN54PSR T8E FOLLOWING:
1. 8as the Bersoa/fixm ever morked uader a coatract for this
epartmeat7 YES No
erata�xxc coxm�xsssow A sxxee
Has this yaraonlEizm ever baea a City employee2 YES NO
CML SCRVICS COlPII85I09
Does this persoa/£ixm poasess a skill aot aozmally possesaed by
YES NO
curreat City employee?
cxa co�ntxxmss
Explain all Y83 answers oa a saparate sheat aad attach.
PORTS S4HIC8 COT7NCIL OSJSCTIVE? '
COVNCIL WARD(S) C DISTRICT PLANNZLIG COLiNCIL lO
IIJITIATING PROBLEM, IS3DS, OPPORTONITY (Who, SQhat, Wl1ea, WheYe, ➢7}1y3):
his is an add on ro'ect to the Grotto-Ho t Area RSVP Pro'ect.
ANTAGES IF APPROVED: �
eneral improvement of the right-uf-way will enhance and add quality to the neigh6orhood. The newly rebuilt
oadways will improve drivability of the neighborhood, and continue the City's efforts to improve the street system in
aint Paul. Street oiling in this neighborhood will be eliminated. Lantern style lighting will also enhance neighborhood
afet and aesthetics.
ISApVANTAGE3 IF APPROVSD:
Normal roblems associated with construction, such as noise, dust, and eneral disru tion will occur.
I3ADVANTAGES IF NOT APPROVED:
e pavement structure will confinue to deteriorate, maintenance costs will rise, and the level of service provided by
hese streets will dro .
TAL AMOIINT OF TRANSACTION: $ 1, 354, 320.00* COST/REV&NVS SUDGETBD (CIRCLB ONE) Y83 NO
xare souxca: CIB, ASSESSMENTS, MSA ACTNITY NfIDffiER:
INANCIAL INFORMATION: (SXPLAIN)
This figure is the total estimated cost to construct entire Grotto-Hoyt Area RSVP Project.
-� ��, �°� �,�
bN .a .:... .... .... r . -..
..�.o'��� �6£ Bw��V
ORIGINAL
CITY OF ST. PAUL
PRELIMINARY ORDSR
`1 In Favor
VOTING WARD 5
In the Matter of improving the following streets wi[h bituminous roadway, construct concrete
curb and gutter, concYete driveway aprons and outwalks, boulevard sodding, tree planting,
construction of a lantern style lighting system, and doing all other work necessary to
complete said improvement for the GROTTO/ HOYT STREET PAVING AND LIGHTING PROJECT :
VICTORIA STREET -Larpenteur Avenue to Arlington Avenue
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
F�
2
3
That the said report and the same is hereby approved with no
alternatives, and that the estimated cost thereof is $ 1,354,320.00
financed by assessments of $351,120 and CIB of $1,003,200.
That a public hearing be had on said improvement on Wednesday, 3rd
day of Februarv, 1999, at 5:30 o'clock P.M., in the Council Chambers of
the City Hall and Court House Building in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the
manner provided by the Charter, stating the time and place of hearing,
the nature of the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas / Nays
✓�-lakey
� �/ strom
fteriTr �cir
�a� GT0.h4�
� �.r'
`" �C �o�c�.ca.N
� Against
a�-��3 �
COUN IL FILE O "I �- 105'�
s
BY
FIL NO. 18884A
Adopted by Council: Date � � �`q`1�
Certified Passed by Council Secretary
BY i���. f�' . !—! � .� .
Mayor
(18884P0)
QRfGINAL
CITY OF ST. PAUL
FINAI, ORDSR
a�
COUN L FILE C � �3
r
BY
FILB NO. 18884A
VOTING WARD 5
In the Matter of improving the following streets with bituminous roadway, construct
concrete curb and gutter, concrete driveway aprons and outwalks, boulevard sodding, tree
planting, construction of a lantern style lighting system, and doing all other work necessary
to complete said improvement for the GROTTOI HOYT STREET PAVING AND LIGHTING PROJECT :
VICTORIA STREET -Larpenteur Avenue to Arlington Avenue
under Preliminary Order 1 � - ����-- approved � �-- �� � `��
The Council of the City of Saint Paul has conducted a public hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City of£icers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSON
Yea Nays
�Benanav
✓ Blakey
✓ Bostrom
✓ Coleman
� Aarris
� Lantry
;/ 'Reiter
� In
O Against
Adopted by the Date: "� �� 1 Ci c�.-,4
�-
Certified Passes by Council Secretary
By �-(�$ � �.� �
,�
�
Mayor
Public Hearin : Febru 3, 1999 �.�.
T.M.S./RSAL ESTATE DIVISION Date: 11/30/98 Graen Sheet Number: 63087
R9 -�t3
oat8ct PBFSOa dIId PhOne N�ax: EPARTAffiiT DIRBCTOR Z CITY COUNCIL
�m
Peter White 266-8850 ^� _'''� A1'T°'e�r I''7 c�axx
�
ust be on Comcil Agenda by_ 12l16/1998 "" "�° °"°°�" `
ust be in Comcil Research �ce 12/4/1998
y noon on Frlday ioa .s.xaa�� y ss e....��n
AL # OF SIGPATQRE PAGSS 1 (CLIP ALL LOCATIONS FOR SIGf171TQRE)
TION RBQIIBSTBD:
his is an add on project to the Grotto-Hoyt Project area RSVP Projeck This Project is being completed as part of the Residential
treet Vitality Program (RSVP). This is one of several RSVP projects selected for 1999 construction by Public Works, and
pproved by the Long Range Capital Improvement Budget Committee and City CounciL (project 188S4A) .
wvs: vexova �a� oa �mna �n� gggONAI. SBRVICB CONTRACTS MfJST AN54PSR T8E FOLLOWING:
1. 8as the Bersoa/fixm ever morked uader a coatract for this
epartmeat7 YES No
erata�xxc coxm�xsssow A sxxee
Has this yaraonlEizm ever baea a City employee2 YES NO
CML SCRVICS COlPII85I09
Does this persoa/£ixm poasess a skill aot aozmally possesaed by
YES NO
curreat City employee?
cxa co�ntxxmss
Explain all Y83 answers oa a saparate sheat aad attach.
PORTS S4HIC8 COT7NCIL OSJSCTIVE? '
COVNCIL WARD(S) C DISTRICT PLANNZLIG COLiNCIL lO
IIJITIATING PROBLEM, IS3DS, OPPORTONITY (Who, SQhat, Wl1ea, WheYe, ➢7}1y3):
his is an add on ro'ect to the Grotto-Ho t Area RSVP Pro'ect.
ANTAGES IF APPROVED: �
eneral improvement of the right-uf-way will enhance and add quality to the neigh6orhood. The newly rebuilt
oadways will improve drivability of the neighborhood, and continue the City's efforts to improve the street system in
aint Paul. Street oiling in this neighborhood will be eliminated. Lantern style lighting will also enhance neighborhood
afet and aesthetics.
ISApVANTAGE3 IF APPROVSD:
Normal roblems associated with construction, such as noise, dust, and eneral disru tion will occur.
I3ADVANTAGES IF NOT APPROVED:
e pavement structure will confinue to deteriorate, maintenance costs will rise, and the level of service provided by
hese streets will dro .
TAL AMOIINT OF TRANSACTION: $ 1, 354, 320.00* COST/REV&NVS SUDGETBD (CIRCLB ONE) Y83 NO
xare souxca: CIB, ASSESSMENTS, MSA ACTNITY NfIDffiER:
INANCIAL INFORMATION: (SXPLAIN)
This figure is the total estimated cost to construct entire Grotto-Hoyt Area RSVP Project.
-� ��, �°� �,�
bN .a .:... .... .... r . -..
..�.o'��� �6£ Bw��V
ORIGINAL
CITY OF ST. PAUL
PRELIMINARY ORDSR
`1 In Favor
VOTING WARD 5
In the Matter of improving the following streets wi[h bituminous roadway, construct concrete
curb and gutter, concYete driveway aprons and outwalks, boulevard sodding, tree planting,
construction of a lantern style lighting system, and doing all other work necessary to
complete said improvement for the GROTTO/ HOYT STREET PAVING AND LIGHTING PROJECT :
VICTORIA STREET -Larpenteur Avenue to Arlington Avenue
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
F�
2
3
That the said report and the same is hereby approved with no
alternatives, and that the estimated cost thereof is $ 1,354,320.00
financed by assessments of $351,120 and CIB of $1,003,200.
That a public hearing be had on said improvement on Wednesday, 3rd
day of Februarv, 1999, at 5:30 o'clock P.M., in the Council Chambers of
the City Hall and Court House Building in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the
manner provided by the Charter, stating the time and place of hearing,
the nature of the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas / Nays
✓�-lakey
� �/ strom
fteriTr �cir
�a� GT0.h4�
� �.r'
`" �C �o�c�.ca.N
� Against
a�-��3 �
COUN IL FILE O "I �- 105'�
s
BY
FIL NO. 18884A
Adopted by Council: Date � � �`q`1�
Certified Passed by Council Secretary
BY i���. f�' . !—! � .� .
Mayor
(18884P0)
QRfGINAL
CITY OF ST. PAUL
FINAI, ORDSR
a�
COUN L FILE C � �3
r
BY
FILB NO. 18884A
VOTING WARD 5
In the Matter of improving the following streets with bituminous roadway, construct
concrete curb and gutter, concrete driveway aprons and outwalks, boulevard sodding, tree
planting, construction of a lantern style lighting system, and doing all other work necessary
to complete said improvement for the GROTTOI HOYT STREET PAVING AND LIGHTING PROJECT :
VICTORIA STREET -Larpenteur Avenue to Arlington Avenue
under Preliminary Order 1 � - ����-- approved � �-- �� � `��
The Council of the City of Saint Paul has conducted a public hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City of£icers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSON
Yea Nays
�Benanav
✓ Blakey
✓ Bostrom
✓ Coleman
� Aarris
� Lantry
;/ 'Reiter
� In
O Against
Adopted by the Date: "� �� 1 Ci c�.-,4
�-
Certified Passes by Council Secretary
By �-(�$ � �.� �
,�
�
Mayor
Public Hearin : Febru 3, 1999 �.�.
T.M.S./RSAL ESTATE DIVISION Date: 11/30/98 Graen Sheet Number: 63087
R9 -�t3
oat8ct PBFSOa dIId PhOne N�ax: EPARTAffiiT DIRBCTOR Z CITY COUNCIL
�m
Peter White 266-8850 ^� _'''� A1'T°'e�r I''7 c�axx
�
ust be on Comcil Agenda by_ 12l16/1998 "" "�° °"°°�" `
ust be in Comcil Research �ce 12/4/1998
y noon on Frlday ioa .s.xaa�� y ss e....��n
AL # OF SIGPATQRE PAGSS 1 (CLIP ALL LOCATIONS FOR SIGf171TQRE)
TION RBQIIBSTBD:
his is an add on project to the Grotto-Hoyt Project area RSVP Projeck This Project is being completed as part of the Residential
treet Vitality Program (RSVP). This is one of several RSVP projects selected for 1999 construction by Public Works, and
pproved by the Long Range Capital Improvement Budget Committee and City CounciL (project 188S4A) .
wvs: vexova �a� oa �mna �n� gggONAI. SBRVICB CONTRACTS MfJST AN54PSR T8E FOLLOWING:
1. 8as the Bersoa/fixm ever morked uader a coatract for this
epartmeat7 YES No
erata�xxc coxm�xsssow A sxxee
Has this yaraonlEizm ever baea a City employee2 YES NO
CML SCRVICS COlPII85I09
Does this persoa/£ixm poasess a skill aot aozmally possesaed by
YES NO
curreat City employee?
cxa co�ntxxmss
Explain all Y83 answers oa a saparate sheat aad attach.
PORTS S4HIC8 COT7NCIL OSJSCTIVE? '
COVNCIL WARD(S) C DISTRICT PLANNZLIG COLiNCIL lO
IIJITIATING PROBLEM, IS3DS, OPPORTONITY (Who, SQhat, Wl1ea, WheYe, ➢7}1y3):
his is an add on ro'ect to the Grotto-Ho t Area RSVP Pro'ect.
ANTAGES IF APPROVED: �
eneral improvement of the right-uf-way will enhance and add quality to the neigh6orhood. The newly rebuilt
oadways will improve drivability of the neighborhood, and continue the City's efforts to improve the street system in
aint Paul. Street oiling in this neighborhood will be eliminated. Lantern style lighting will also enhance neighborhood
afet and aesthetics.
ISApVANTAGE3 IF APPROVSD:
Normal roblems associated with construction, such as noise, dust, and eneral disru tion will occur.
I3ADVANTAGES IF NOT APPROVED:
e pavement structure will confinue to deteriorate, maintenance costs will rise, and the level of service provided by
hese streets will dro .
TAL AMOIINT OF TRANSACTION: $ 1, 354, 320.00* COST/REV&NVS SUDGETBD (CIRCLB ONE) Y83 NO
xare souxca: CIB, ASSESSMENTS, MSA ACTNITY NfIDffiER:
INANCIAL INFORMATION: (SXPLAIN)
This figure is the total estimated cost to construct entire Grotto-Hoyt Area RSVP Project.
-� ��, �°� �,�
bN .a .:... .... .... r . -..
..�.o'��� �6£ Bw��V
ORIGINAL
CITY OF ST. PAUL
PRELIMINARY ORDSR
`1 In Favor
VOTING WARD 5
In the Matter of improving the following streets wi[h bituminous roadway, construct concrete
curb and gutter, concYete driveway aprons and outwalks, boulevard sodding, tree planting,
construction of a lantern style lighting system, and doing all other work necessary to
complete said improvement for the GROTTO/ HOYT STREET PAVING AND LIGHTING PROJECT :
VICTORIA STREET -Larpenteur Avenue to Arlington Avenue
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
F�
2
3
That the said report and the same is hereby approved with no
alternatives, and that the estimated cost thereof is $ 1,354,320.00
financed by assessments of $351,120 and CIB of $1,003,200.
That a public hearing be had on said improvement on Wednesday, 3rd
day of Februarv, 1999, at 5:30 o'clock P.M., in the Council Chambers of
the City Hall and Court House Building in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the
manner provided by the Charter, stating the time and place of hearing,
the nature of the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas / Nays
✓�-lakey
� �/ strom
fteriTr �cir
�a� GT0.h4�
� �.r'
`" �C �o�c�.ca.N
� Against
a�-��3 �
COUN IL FILE O "I �- 105'�
s
BY
FIL NO. 18884A
Adopted by Council: Date � � �`q`1�
Certified Passed by Council Secretary
BY i���. f�' . !—! � .� .
Mayor
(18884P0)