Loading...
98-749t' CITY OE ST. PAUL FINPS, ORDER .�iyi� ��� �'/jz /as� �3 0 R! G 1 N A L COUNC L F ✓� I�yO � "� � B �/1( Fi e . S98085-598108 & 598110-598132 Votinq Ward 1,2,3,4,5,6,7_ In the Matter of sidewalk reconstruction at the £olloming locations: (see attached Exhibit A� *ESTIMATED CONSTRUCTION RATES RESIDENTIAL RATES (One, two or three £amily structures) Reconstruction (replacement of old sidewalk) -$7.65 per front foot for a£ive (5) foot wide walk and $9.18 per front foot for a six (6) foot wide , walk. All other widths will be prorated accordingly. New construction (where no walk existed) - 100°s of the actual cost estimated to be approximately $3.42 per square foot. All corner residential properties will receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abutting the "long side" of the property. MULTI-RESIDENTIAL (More than three family structures), NON RESIDENTIAL RATES For new and reconstructed sidewalk; 100°s of actual cost estimated to be approximately $4.62 per square foot. under Preliminary order � p ^ b� p approved � The Council of the City of Saint Pau1 has conducte a pu 1ic hearing upon the above improvement, due notice thereof having been given as prescribed by the City Charter; and WHEREAS, The Council has heard all persons, objections and recommendations pertaining to said proposed improvement and has fully considered the same; now, therefore, be it RESOLVED, That the Council of the City o£ Saint Paul does hereby order that the above-described improvement be made, and the proper City of£icers are hereby directed and authorized to proceed with the improvement; and be it FURTHER RESOLVED, That upon the completion of said improvement, the proper City officers shall calculate all expenses incurred therein and shall report the same to the City Council in accordance with Chapter 14 of the City Charter. COUNCILPERSONS Yeas Nays .� Benanav ✓ Blakey ,� Bostrom ,/ Coleman ✓ Harris ✓ Lantry ,/ Reiter Adopted by Council: Certified Passed by �In �Aga' Date1�G"� /yS°S� Council Secretary s CITY OE ST. PAUL COUNCIL EILE NO. �� +��� FINAL ORDER By File No. 598085-598108 & 598110-598132 Exhibit A Voting Ward_ 1,2,3,4,5,6,7_ In the Matte= of sidewalk =econstruction at the following locations: Ward 1 S98094 - Both sides Aurora Ave. from N. Grotto St. to N. Dale St. � ,y� 598095 - Both sides Carroll Ave. from N. Dale St. to N. Grotto St.� L d �Ai�.,Z6��9d� 598096 - Both sides Hague Ave. from N. Dunlap St, to Griggs St. S9809� - North side Portland Ave. £rom N. Griggs St. to 1241 Portland Ave. & South side Portland Ave. from N. Griggs St. to 1234 Portland Ave. Ward 2 598125 - Both sides Daly St. from Jefferson Ave. to Palace Ave. Wasd 3 598093 - Both sides Cretin Ave. from Berkeley Ave. to St. Clair Ave. & South side St. Clair Ave. from Mt. Curve Blvd. to S. Cretin Ave. 598098 - South side Munster Ave. from Sue St. to 5. Prior Ave, at 1916 Munster Ave. Only. � 598099 - South side Randolph Ave. from S. Fairview Ave. to S. Wheeler St.� �r�/ �vy 26,9s' 598110 - Both sides Hartford Ave. from S. Cretin Ave. to S. Cleveland Ave. � 598111 - Both sides Juno Ave. from S. Cretin Ave. to S. Finn St.*2161 June Ave. deleted 598112 - Both sides S. Prior Ave. from Jefferson Ave. to Wellesley Ave. & South side Wellesley Ave. from Kenneth St. to S. Prior Ave. 598121 - Both sides Beechwood Ave. from S. Snelling Ave. to Davern St. � 598122 - Both sides Bohland Ave. from S. Fairview Ave. to Davern St.*1741 Bohland Ave. deleted Y� 598123 - Both sides Rome Ave. from S. Fairview Ave. to Davern St.*1741 Rome Ave. deleted 598124 - Both sides Summit Ave. from S. Fairview Ave. to S. Prior Ave. 598126 - Both sides Juno Ave. from S. Milton St. to View St. * S�}&4-�3 I�ox�-���--fxrmr-Ydvrber��asa-to-£u3�=sa�- Deleted 8(12J98 598128 - West side View St, from Juno Ave. to Randolph Ave. � Ward 4 ! C/���� 598100 - East side Fulham St. from Hendon Ave. to W. Hoyt Ave. at 1554 Fulham St. Only. 5981�1 - South side W. Hoyt Ave. from N. Cleveland Ave. to Grantham St. at 2218 W. Hoyt Ave. Only & East side Grantham St. from Dudley Ave. to W. Hoyt Ave. 598113 - East side Branston St. fram Hendon Ave. to W. Hoyt Ave. at 1546 Branston St. Only. 598114 - Both sides Doswell Ave. from Keston St. to Eustis St. 598115 - South side W. Hoyt Ave. from N. Cleveland Ave. to Grantham St. at 2200 W. Hoyt Ave. Only. S98129 - East side Grantham St. from Dudley Ave. to W. Hoyt Ave. at 1550 Grantham St. Only. S98130 - Both sides Sargent Ave. from S. Prior Ave. to S. Howell St. Ward 5 ,� S98091 - Both sides Chelsea St. from W. Arlington Ave. to W. Hoyt Ave.� ' %d ��zG�q� 598092 - South side Front Ave. from N. St. Albans St. to N. Dale St. & North side Front Ave. from N. St. Albans St. to Como Ave. � 598102 - Both sides Bradley St. from Case Ave. to 951 Bradley St.> �� id ��zv/q� 598103 - Both sides Jenks Ave. from Westminster St. to Arlcwright St. � 598104 - North side W. Nebraska Ave. from N. Milton St. to N. Victoria St � d T � s' /zG/9t� 598116 - South side Case Ave. from Clark St. to Desoto St. S98117 - Both sides N. Dale St. from W. Arlington Ave. to W. Nebraska Ave. Ward 6 598087 - Both sides N. Hazel St. from E. Hyacinth Ave. to Clear Ave. 598088 - Both sides E. Maryland Ave. from Mendota 5t. to Forest St. 598089 - West side Nokomis Ave. from E. Geranium Ave. to E. Rose Ave. at 2367 Nokomis Ave. Only. S98090 - Both sides Payne Ave. from Wells St. to Sims Ave., 5outh side York Ave. from Payne Ave. to Greenbrier St. & North side York Ave. from Edgerton St. to Payne Ave. S98105 - Both sides Kennard St. from E. Nevada Ave. to E. Nebraska Ave. 598106 - North side E. Magnolia Ave. from Barclay St. to Hazelwood St. E East side Sarclay St. from E. Magnolia Ave. to E. Rose Ave. 598107 - Both sides E. Montana Ave. from Hazelwood St. to Germain St. 598120 - Both sides E. Orange Ave. from N. Ruth St. to Pedersen St, , 598131 - Both sides Geranium Ave. from Nokomis Ave. to Edgewwater Blvd. ��' 7� 9 598132 - Both sides E. Rose Ave. from Nokomis Ave. to Hdgewater Blvd. Ward 7 S98085 - Both sides Falcon Ave. from S. Winthrop St, to S. McKnight Rd. S98086 - West side N. McKnight Rd. from E. Seventh St. to Stillwater Ave. 598108 - West side N. White Bear Ave. from Beech St_ to E. Minnehaha Ave. 598118 - East side Cypress St. from E. Fourth St. to E. Fifth St. & West side Cypress St. from Fremont Ave. to E. Fifth St. S98119 - North side Upper Afton Rd. from Kennard Ct. to Flandrau P1. rl� 7� �� DEPAflTMENT/OFFICFJCAUNqL OATEINITIA7ED GREEN SHEET `� N ��613 Public Works Sidewalks 6-3-98 INITIAL/DATE INITIAVDATE CONTACTPEASONBPHONE �DEPARTMEMDIREGTOR �CffYCOUNCIL JerryTvedt-266-6t21 � �CfTYA7TOflNEY �GTYCLERK MUST BE ON COUNCiI AGENDA BY (DATE) � � BUDGET DIRECTOR � FIN. & MGT. SERVICES DIR. � MAYOR (Oq ASSISTAN'n 1� COUnCII f�.E522I(�1 TOTAL %OF SIGNATURE PAGES _(CLIP ALL LOCA710N5 FOR SIGNANpE) � ASSOCIATE � DEP ACTION flE�UESTED ��'`� Construct & Reconstruc[ Sidewalk in �A{i1Q�y -l�)C/1 �}��. C[�� i HC� ��s J` �$ �' SF — 3L RECOMMENDAT70N5: Appmve (A) or qeje�x (fl) PERSONAL SERVICE CONTRACTS MUST ANSWEH THE FOLLOWING QUESTIONS: PLANNING COMMISSION _ CML SERVICE COMMISS70N �� H � m� P � S S � NOef W9fk2d ilnd2t d CoflVaCt fOf Sh15 depafUflen[? — YE q8 COMM I7TEE Z. Nas this personlfirm ever 6een a city employee? — — YES NO A S7AFF _ 3. Does this personlfirm possess a skili not nortnaly passessed by any current ciry — amployee? DISTRICTCOUNCIL YES NO SUPPoRTS WHICH COUNqL OBJECTNE? Exp�ain all yas answats on separete shoat aM attaeh to green sheet ' 2 1 INITIATING PR BL ; 15 : OP OA"1UN1T' �WHO. WHAT, WHEN, WHEflE, WFiY): The problem "defective sidewalk" was created because of tree roots, deleierious subgrade material, alternating freefthaw cycles, service life limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide level and must be addressed and corrected on an annual basis. Left uncorrected, the sidewalk condition would worsen to a state where it would be rendered unusable and subjed to increased pedestrian injuries from falls and possible litigations. ADVANTAGES IF APPROVED: The community will benefit from this project because it will provide safe detect free sidewalks for its many citizens. The sidewalk contracts are executed by private contractors, so it follows that private sector jobs are created as a result of this activity. DISADVANTAGES IF PPPROVFA_ Historically, the sidewalk reconstructions have created negative feedback in the area ot construction procedure and assessment. Simply stated, property owners detest assessments, and despite the fact up to one-half the assessment is City subsidized, it still remains controversial. DISADVANTAGES IF NOT APPROVEO: This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personal injury suits, ultimately resulti�g in the expenditure of larger dollar amounts in eventual repairs and/or replacement, as well as claim payouts. TOTALAMOUMOFTHANSACTION$ �IiJI -,- t Jr' C0.ST/REVENUEBUDGETED(CIpCLEONE) YES No FUNDINGSOURCE 9$^�^Q6�$ A� P�� = 6 �Q6� pCINITYNUMBEii �9g , 2T757-0784-Q0000 FINANqALMFORMATION:(EXPUIIN) B� AST = 325��00 c, cta 98 = Sa,oaa SUNIMt1RY OF ENGINEERING RECONIMENDATIONS Ward 1 t r'I � ��''1�� PROJECT• RECONSTRUCT SIDEWALB B.S. AURORA AVE. from N. Grotto St. to N. Dale St. INITIATING ACTION: This order was irvtiated by the Director of Public Works as public necessity on the basis of one {1) complaint, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITTONS: This walk is poured concrete with tree heaves, asphalt patches, disintegrated, scaled, settled and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALK B.S. CARROLL AVE. from N. Dale St. to N. Grotto St. � INITIATING ACTION: �� as public necessity on walk. This order was initiated hy the Director of Public Works the basis of one (1} complaint and an inspection of the EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALK S.S. HAGUE AVE. from N. Dunlap St. to N. Griggs St. 5� f��/ INITIATING ACTION: This order was initiated by the Director of Public Works � as public necessity on the basis of two (2) complaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled and settled panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALK N.S. PORTLAND AVE. from N. Griggs St. to 1241 Portland Ave. & S.S. PORTL[1ND AVE. from N. Griggs St. to 1234 Portland Ave. i �' Y ��/ Y� INITIATING ACTION as public necessity on walk. This order was initiated by the Director of Pubiic Works the basis of one (1) complaint and an inspection of the EXISTING CONDITI�NS: TYus walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. SUNiMARY OF ENGINEERING RECOMMENDATION Ward 2 �� '� `�� PROJECT• RECONSTRUCT SIDEWALK B.S. DALY ST. from Jefferson Ave. to Palace Ave. �$1 � INITIATING ACTION: as public necessity on the walk. This order was initiated by the Director of Public Works the basis of seven (7) complaints and an inspection of EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets, asphalt patches, settled and cracked panels. ................................................................... SiJMMARY OF ENGINEERING RECOD�IIvIENDATION �.8 '� `� � Ward 3 ��a�3 PROJECT• RECONSTRUCT SIDEWALS B.S. CRETIN AVE. from Berkeley Ave. to St. Clair Ave. & S.S. ST. CLAIR AVE. from Mt. Curve Blvd. to S. Cretin Ave. II�IITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on ihe basis of an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with heaves, scaled, settled and cracked panels. ................................................................... SI3NIMARY OF ENGINEERING RECOMMENDATIONS Ward 3 �s-��q PROJECT• RECONSTRUCT SIDEWALg S.S. MIJNSTER AVE. from Sue St. to S. Prior Ave. at 1916 Munster Ave. Only. ����$ INITIATING ACTION: This order was initiated by the Director af Public Works as public necessity on the basis of one (1) complaint, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves. ................................................................... PROJECT• RECONSTRITCT SIDEWALg WITH INTEGRAL CURB S.S. Rt1NDOLPH AVE. from S. Fairview Ave. to S. Wheeler St. S �Idt1QA IIVITIATING ACTION: This order was initiated by the Director of Public Works t���� �( as public necessity on the basis of five (5) complaints, a petition with one {1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, setfled and cracked panels. ................................................................... SUMMARY OF ENGINEERTNG RECONIMENDATIONS Ward 3 PROJECT• RECONSTRUCT SIDEWALS B.S. HAIrPFORD AVE. from S. Cretin Ave. to S. Cleveland Ave. �I� '�� � � A ��� O INITIATING ACTION: This order was initiated by the Director of Public Works � i� as public necessity on the basis of three (3) complaints, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, settied and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALK B.S. JTJNO AVE. from S. Cretin Ave. to S. Finn St. 5 yc� I�� INITIATING ACTION: This order was initiated by the Director of Public Works c U as public necessity on the basis of two (2) complaints, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALH B.S. S. PRIOR AVE. from Jefferson Ave, to WeIIesley Ave. & S.S. WELLESLEY AVE. from Kenneth St. to S. Prior Ave. �$I I� INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of three (3) complaints, aa petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches and settled panels. ................................................................... SUMMARY OF EI3GINEERING RECOMMENDATIONS '" �"'��� Ward 3 PROJECT• REGONSTRUCT SIDEWALg B.S. BEECHWOOD AVE. from S. Snelling Ave. Yo Davern St. S QqIZ� IIITITIATING ACTION: This order was initiated by the Director of Public Works (��� as public necessity on the basis of a five (5) complaints, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, setfled and cracked panels. ................................................................... PROJECT: RECONSTRUCT SIDEWALK B.S. BOHLt1ND AVE. from S. Fairview Ave. to Davern St. .CC�Q/�.L INITIATING ACTION: This order was initiated by tbe Director of Public Works �<<� as public necessity on the basis of three (3) complaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with heaved settled and cracked panels. ................................................................... PROJECT• RECONSTRUCT 5IDEWALK B.S. ROME AVE. from S. Fairview Ave. to Davern St. ��'� INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of fourteen (14) complaints and an inspection of the walk. EXISTING CONDITIONS: This wa�k is poured concrete with tree heaves> asphalt patches, disintegrated, scaled, setded and cracked panels. ................................................................... PROJECT� RECONSTRUCT SIDEWALK B.S. SUMMIT AVE. from S. Fairview Ave. to S. Prior Ave. . � INITIATING ACTION: This order was initiated bythe Director of Public Works �g$'Z as public necessity on the basis of four (4) complaints, a petit�on with one (1) signer and an inspection of the walk. EXISTTNG CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cra�cked panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATIONS Ward 3 dlg'�`�� PROJECT• RECONSTRUCT SIDEWAI.g B.S. JUNO AVE. from S. Milton St. to View St. 5(,��.�t IIvITIATING ACTION: � (N �-r� as public necessity on the walk. This order was initiated by the Director of Public Works the basis of a ten (10) complaints and an inspection of EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALS B.S. NORBERT LANE from St. Paul Ave. to Dorothea Ave. & B.S. NORBERT PL. from Norbert Lane to Cul-de-sac. C,QQ/�r� INITIATING ACTIOI�I: This order was initiated by the Director of Public Works ���� � as public necessity on the basis of eight {8) camplaints, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, disintegrated scaled, setfled and cracked panels. .................................................................. PROJECT• RECONSTRUCT SIDEWALK W.S. VIEW ST, from Juno Ave. to Randolph Ave. �A�l�d INITIATING ACTION: This order was initiated by the Director of Public Works � i��I � as public necessity on the basis of one (1) complaint and an inspection of the walk. EXISTIPIG CONDITIONS: This waik is poured concrete with tree heaves, water pockets, asphalt patches, settled and cracked panels. ................................................................... SUMIVIARY OF ENGINEERINCz RECOMMENDATIONS qY '� Ward 4 PRO.3ECT• RECONSTRUCT SIDEWALg E.S. FULHAM ST. from Hendon Ave. to W. Hoyt Ave. at 1554 Fulham St. Only. L�Q�(� I1vITIATING ACTTON: 'I`his order was initiated by a request by the property � ( V V u owner. EXISTING CONDITIONS: This walk is poured concrete with offgrade and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALH S.S. W. HOYT AVE. from N. Cleveland Ave. to Grantham St. at 2218 W. Hoyt Ave. Only & E.S. GRANTHAM �� ST. from Dudley Ave. to W. Hoyt Ave. I1vITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches and scaled panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATIONS Ward 4 5q$I13 ati �� `�°� PROJECT• RECONSTRUCT SIDEWALg E.S. BRANSTOIV ST. from Hendon Ave. to W. Hoyt Ave. at 1546 Branston St. Only. INITIATIIHG ACTION: This order was initiated by a request from the property owner. EXISTING CONDITIONS: This walk is poured concrete with offgrade and scaled panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALK B.S. DOSWELL AVE. from Keston St. to Eustis St. ��� `� INITIATING ACTIOPi: as public necessity on inspection of the walk. This order was initiated by the Director of Public Works the basis of a petition with one (1} signer and an EXISTING CONDITIONS: This walk is poured concrete with tree heaves> scaled, settled and cracked panels. ................................................................... PROJECT' RECONSTILiJCT SIDEWALK S.S. W. HOYT AVE. from N. Cleveland Ave. to Grantham St. at 2200 W. Hoyt Ave. Only. �$11� INITIATING ACTION: This order was initiated by a request from the property owner. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches and scaled panels. ................................................................... SUMIVLARY OF ENGINEERING RECOMMENDATIONS .-.� a� .��.� PRO�TF'CT• RECONSTRUCT SIAEWALS E.S. GRANI'HAM ST: from Dudley Ave. to W. Hoyt Ave. at 1550 Grantham St. Only. ���� Il�IITIATING� ACTION: This order was initiated bp a request from the property owner. EXISTIPiG COI�IDITIONS: Ttus walk is poured concrete with cracked panels. .................................................................. PRO.TECT: RECONSTRUCT SIDEWALK B.S. SARGENT AVE. from S. Prior Ave. to S. Howell St. �$I � INITIATING ACTION: as public necessity on walk. This order was initiated by the Director of Public Works the basis of two (2) complaints and an inspection of the EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. .................................................................. STJNIMARY OF ENGINEERING RECONIMENDATIONS O� �'� �` Ward 5 PROJECT• RECONSTRUCT SIDEWALg B.S. CHELSEA ST. from W. Arlington Ave. to W. Hoyt Ave. �� (�y� I INITIATING ACTION: This order was initiated by the D'uector of Public Works 0 � as public necessity on the basis of eight (8) complaints, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWA,LH S.S. FRONT AVE. from N. St. Albans St. to N. Dale St. & N.S. FRONT AVE. from N. St. Albans S. to Como Ave. ��� INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of three (3) complaints and an inspection of the walk. EXISTING CONDITION5: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and multi-cracked panels. ................................................................... SLTM1V�1aRY OF ENGINEERING RECOMMENDATIONS Wazd 5 ��'� 1't. PROJECT• CONSTRUCT & RECONSTRUCT SIDEWALK B.S. BRADLEY Sf. from Case Ave. to 951 Bradley St. S���OZ INITIATING ACTION: Tkus order was initiated by the Director of Public Works as public necessity on the basis of one (1) complaint and an inspection of the walk. EXISTING CONDITIONS: This walk is old tile with broken tile, holes in tile, offgrade and cracks in tile. ................................................................... �� � � PROJECT• RECONSTRUCT SIDEWALK B.S. JENKS AVE. from Westminster St. to Arkwright St. IPIITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of one (1) complaint, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, scaled, settled and cracked panels. ...................................... . ............................ ��� PROJECT• RECONSTRUCT SIDEWALK N.S. W. NEBRASKA AVE. from N. Milton St. to N. Victoria St. INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the hasis of one (1) complaint, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATIONS Ward 5 � PROJECT• RECONSTRUCT SIDEWALg S.S. CASE AVE. from Clark St. to Desoto St. 5 (�� � � � INITIATING ACTION: ( as public necessity on inspection of the walk. This order was initiated by the Director of Public Works the basis of a petition with one (1) signer and an EXISTING CONDITIONS: This walk is poured concrete with scaled, uneven and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALB B.S. N. DALE ST. from W. Arlington Ave. to W. Nebraska Ave. 5 qQ �� INITIATING ACTION: This order was initiated by the Director of Pubiic Works 4 0 � as public necessity on the basis of five (5) complaints, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... SUNIMARY OF ENGINEERING RECOMMENDATIONS Ward 6 qK ,��.�, PROJECT• RECONSTRUCT SIDEWALS B.S. N. HAZEL ST. from E. Hyacinth Ave. to Clear Ave. �q$Q�� INITIATING ACTION: as public necessity on walk. This order was initiated by the Director of Public Works the basis of one (1) complaint and an inspection of the EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches scaled, setfled and cracked panels. ................................................................... PROJECT: RECONSTRUCT SIDEWALK B.S. E. MARYLAND AVE. from Mendota St. to Forest St. Gq,�Odd INITIATING ACTION: !Y� �P as public necessity on the walk. This order was initiated by the Director of Public Works the basis of ten (10) complaints and an inspection of EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... �.`,� I � PROJECT' RECONSTRUCT SIDEWALK W.S. NOKOMIS AVE. from E. Geranium Ave. to E. Rose Ave. at 2367 Nokomis Ave. Only. INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of a petition with one (1) signer and an inspection of the walk. EXISTING CONDITTONS: This walk is poured concrete with settied panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALK WITH INTEGRAL CURB B.S. PAYNE AVE. from Wells St. to Sims Ave., S.S. YORK AVE. from Payne Ave. to Greenbrier St. & N.S. YORK AVE. from Edgerton St. to Payne Ave. J � UV�� IPIITIATING ACTION: as public necessity on walk. This order was initiated by the Director of Public Works the basis of six (6) complaints and an inspection of the EXISTING CONDITIONS: This walk is poured concrete with asphalt patches, disintegrated, scaled, settled and cracked panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATIONS Ward 6 ��.�Nq PROJECT• RECONSTRUCT 5IDEWALg B.S. KENNAF2D ST. from E. Nevada Ave. to E. Nebraska Ave. ��� INITIATII�iG ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of three {e) complaints, a petition with one (1j signer and an inspection of the walk. EXISTIPTG COI�IDITIONS: This walk is poured concrete with tree heaves, asphalt patches and cracked panels. ................................................................... PR[1TF("r CONSTRUCT & RECONSTRIICT SIDEWALK N.S. E. MAGNOLIA AVE. from Barclay St. to Hazelwood St. & E.S. BARCLAY ST. from E. Magnolia Ave. to E. Rose Ave. / �'� INITIATING ACTION: as public necessity on walk. This order was initiated by the Director of Public Works the basis of one (1} complaint and an inspection of the EXISTING CONDITIONS: This walk is poured cancrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... PROJECT: RECONSTRUCT SIDEWALK B.S. E. MONTANA AVE. from Hazelwood St. to Germain St. y��p� INITIATING ACTION: as public necessity on the walk. This order was initiated by the Director of Public Works the basis of three t3) complaints and an inspection of EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... SUMMARY OF ENGINEERING RECONIMENDATION Ward 6 ��,��� PROJECT' RECONSTRUCT 5IDEWALg B.S. E. ORANGE AVE, from N. Ruth St. to Pedersen St. 5 q$' ZO INITIATING ACTION: as public necessity on the wa1k. This order was initiated by the Director of Public Works the basis of a three (3) complaints and an inspection of EXISTIPIG CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATIONS Ward 6 5g�►31 c��_1�q PROJECT• CONSTRUCT & RECONSTRUCT SIDEWALH B.S. GERANIUM AVE. from Nokomis Ave. to Edgewater Blvd. INITIATING ACTION: as public necessity on walk. This order was initiated by the Director of Public Works the basis of two (2J complaints and an inspection of the EXISTING CONDITIOPIS: This walk is poured concrete with tree heaves, water pockets, asphalt patches, scaled, settled and cracked panels. ................................................................... PROJECT• CONSTRUCT & REGONSTRUCT SIDEWALK B.S. E. ROSE AVE. from Nokomis Ave. to Edgewater Blvd. 5�',12 INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of nine (9) complaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, disintegrated, scaled, settled and cracked panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATIONS Ward 7 P12QJECT• RECONSTRI3CT SIDEWAT.K B.S. FALCdN AVE. form S. Winthrop St. to S. McKnight Rd. °tY ��`�� jgQ(}�C, INITIATING ACTION: This order was uZitiated by the Director of Public Works � � �vIJ as public necessity on the basis of eleven (11) complaints two (2J petitions with one (lJ signer and an inspection of the walk. EXISTING CONDITIONS: TYus walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. ................................................................... PROJECT: RECONSTRUCT SIDEWALS W.S. N. MCKNIGHT RD. from E. Seventh St. to Stillwater Ave. � � (IV NQ INITIATING ACTION: as public necessity on walk. This order was initiated by the Director of Fublic Works the basis of two (2) complaints and an inspection of the EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, disintegrated, scaled, settled and cracked panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATION aY���� Ward 7 PROJECT• RECONSTRUCT SIDEWALH W.S. N. WHIT'E BEAR AVE. from Beech St. to E. Minnehaha Ave. 5�' O� INITIATING ACTION: This order was iuritiated by the Director of Public Works as public necessity on the basis of a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, scaled, settled and cracked panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATIOIVS Ward 7 � PROJECT• RECONSTRUCT SIDEWALK E,S. CYPRESS ST. from E. Fourth St. to E. Fifth St. & W.S. CYPRESS ST. from Fremont Ave. to E. Fifth St. SG� � �� INITIATING ACTION: d � U as public necessity on the walk. This order was initiated by the Director of Public Works the basis of a one fl) complaint and an inspection of EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. ................................................................... PROJECT• RECQNSTRUCT SIDEWALK N.S. UPPER AF"TON RD. from Kennard Ct. to Flandrau Pl. S QI�"� INITIATING ACTION: This order was initiated by the Director of Public Works � �� as public necessity on the basis of one (lj complaint, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: 'This walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. ................................................................... �k 3 : CITY OF ST. PAUI. PRELIMINARY ORDER OR�G�N��UNC LE NO. g8_Gn�_ � BY �%�y��i,�,G���i File No. 598085-598108 & 59811�-598132 Voting Ward 1,2,3,4,5,6,7 In the Matter o£ sidewalk reconstruction at the following locations: (See attached Exhibit A) *ESTIMATED CONSTRUCTION RATES RESIDENTIAL RATES (One, two or three family structures} Reconstruction (replacement of old sidewalk) -$7.65 per front foot for a five (5) foot wide walk and 59.18 per front foot £or a six (6) foot wide walk. All other widths will be prorated accordingly. New construction (where no walk existed) - 100$ of the actual cost estimated to be approximately $3.42 per square £oot. All corner residential properties will receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abuttinq the "long side" of the property. MULTI-RESIDENTIAL(More than three family structures�, NON-RESIDENTIAL RATES For new and reconstructed sidewalk; 100$ of actual cost estimated to be approximately $4.62 per square foot. The Council of the City of Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: 1 2 3 That the said report and the same is hereby approved with no alternatives, and that the estimated cost thereof is *SEE ABOVE for estimated construction rates, financed by assessments and 1998 Public Improvement Aid. That a public hearing be had on said improvement on the 12th of Auaust, 1998 at 5:30 o'clack P,.M., in the Council Chambezs of the City Ha11 and Court House Buildinq in��the City o£ Saint Paul. That notice of said public hearing be given to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cost thereof as estimated. COUNCILPERSONS Yeas Nays � enanav �lakey �/$ostrom �oleman ,/�arris � ntry �iter �In Favor � Against Adopted by Council: Date����1��� Certified Passed by Council Secretary gy � \ _ � J. � 1--�.�,, � v �+.- Mayor t' CITY OE ST. PAUL FINPS, ORDER .�iyi� ��� �'/jz /as� �3 0 R! G 1 N A L COUNC L F ✓� I�yO � "� � B �/1( Fi e . S98085-598108 & 598110-598132 Votinq Ward 1,2,3,4,5,6,7_ In the Matter of sidewalk reconstruction at the £olloming locations: (see attached Exhibit A� *ESTIMATED CONSTRUCTION RATES RESIDENTIAL RATES (One, two or three £amily structures) Reconstruction (replacement of old sidewalk) -$7.65 per front foot for a£ive (5) foot wide walk and $9.18 per front foot for a six (6) foot wide , walk. All other widths will be prorated accordingly. New construction (where no walk existed) - 100°s of the actual cost estimated to be approximately $3.42 per square foot. All corner residential properties will receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abutting the "long side" of the property. MULTI-RESIDENTIAL (More than three family structures), NON RESIDENTIAL RATES For new and reconstructed sidewalk; 100°s of actual cost estimated to be approximately $4.62 per square foot. under Preliminary order � p ^ b� p approved � The Council of the City of Saint Pau1 has conducte a pu 1ic hearing upon the above improvement, due notice thereof having been given as prescribed by the City Charter; and WHEREAS, The Council has heard all persons, objections and recommendations pertaining to said proposed improvement and has fully considered the same; now, therefore, be it RESOLVED, That the Council of the City o£ Saint Paul does hereby order that the above-described improvement be made, and the proper City of£icers are hereby directed and authorized to proceed with the improvement; and be it FURTHER RESOLVED, That upon the completion of said improvement, the proper City officers shall calculate all expenses incurred therein and shall report the same to the City Council in accordance with Chapter 14 of the City Charter. COUNCILPERSONS Yeas Nays .� Benanav ✓ Blakey ,� Bostrom ,/ Coleman ✓ Harris ✓ Lantry ,/ Reiter Adopted by Council: Certified Passed by �In �Aga' Date1�G"� /yS°S� Council Secretary s CITY OE ST. PAUL COUNCIL EILE NO. �� +��� FINAL ORDER By File No. 598085-598108 & 598110-598132 Exhibit A Voting Ward_ 1,2,3,4,5,6,7_ In the Matte= of sidewalk =econstruction at the following locations: Ward 1 S98094 - Both sides Aurora Ave. from N. Grotto St. to N. Dale St. � ,y� 598095 - Both sides Carroll Ave. from N. Dale St. to N. Grotto St.� L d �Ai�.,Z6��9d� 598096 - Both sides Hague Ave. from N. Dunlap St, to Griggs St. S9809� - North side Portland Ave. £rom N. Griggs St. to 1241 Portland Ave. & South side Portland Ave. from N. Griggs St. to 1234 Portland Ave. Ward 2 598125 - Both sides Daly St. from Jefferson Ave. to Palace Ave. Wasd 3 598093 - Both sides Cretin Ave. from Berkeley Ave. to St. Clair Ave. & South side St. Clair Ave. from Mt. Curve Blvd. to S. Cretin Ave. 598098 - South side Munster Ave. from Sue St. to 5. Prior Ave, at 1916 Munster Ave. Only. � 598099 - South side Randolph Ave. from S. Fairview Ave. to S. Wheeler St.� �r�/ �vy 26,9s' 598110 - Both sides Hartford Ave. from S. Cretin Ave. to S. Cleveland Ave. � 598111 - Both sides Juno Ave. from S. Cretin Ave. to S. Finn St.*2161 June Ave. deleted 598112 - Both sides S. Prior Ave. from Jefferson Ave. to Wellesley Ave. & South side Wellesley Ave. from Kenneth St. to S. Prior Ave. 598121 - Both sides Beechwood Ave. from S. Snelling Ave. to Davern St. � 598122 - Both sides Bohland Ave. from S. Fairview Ave. to Davern St.*1741 Bohland Ave. deleted Y� 598123 - Both sides Rome Ave. from S. Fairview Ave. to Davern St.*1741 Rome Ave. deleted 598124 - Both sides Summit Ave. from S. Fairview Ave. to S. Prior Ave. 598126 - Both sides Juno Ave. from S. Milton St. to View St. * S�}&4-�3 I�ox�-���--fxrmr-Ydvrber��asa-to-£u3�=sa�- Deleted 8(12J98 598128 - West side View St, from Juno Ave. to Randolph Ave. � Ward 4 ! C/���� 598100 - East side Fulham St. from Hendon Ave. to W. Hoyt Ave. at 1554 Fulham St. Only. 5981�1 - South side W. Hoyt Ave. from N. Cleveland Ave. to Grantham St. at 2218 W. Hoyt Ave. Only & East side Grantham St. from Dudley Ave. to W. Hoyt Ave. 598113 - East side Branston St. fram Hendon Ave. to W. Hoyt Ave. at 1546 Branston St. Only. 598114 - Both sides Doswell Ave. from Keston St. to Eustis St. 598115 - South side W. Hoyt Ave. from N. Cleveland Ave. to Grantham St. at 2200 W. Hoyt Ave. Only. S98129 - East side Grantham St. from Dudley Ave. to W. Hoyt Ave. at 1550 Grantham St. Only. S98130 - Both sides Sargent Ave. from S. Prior Ave. to S. Howell St. Ward 5 ,� S98091 - Both sides Chelsea St. from W. Arlington Ave. to W. Hoyt Ave.� ' %d ��zG�q� 598092 - South side Front Ave. from N. St. Albans St. to N. Dale St. & North side Front Ave. from N. St. Albans St. to Como Ave. � 598102 - Both sides Bradley St. from Case Ave. to 951 Bradley St.> �� id ��zv/q� 598103 - Both sides Jenks Ave. from Westminster St. to Arlcwright St. � 598104 - North side W. Nebraska Ave. from N. Milton St. to N. Victoria St � d T � s' /zG/9t� 598116 - South side Case Ave. from Clark St. to Desoto St. S98117 - Both sides N. Dale St. from W. Arlington Ave. to W. Nebraska Ave. Ward 6 598087 - Both sides N. Hazel St. from E. Hyacinth Ave. to Clear Ave. 598088 - Both sides E. Maryland Ave. from Mendota 5t. to Forest St. 598089 - West side Nokomis Ave. from E. Geranium Ave. to E. Rose Ave. at 2367 Nokomis Ave. Only. S98090 - Both sides Payne Ave. from Wells St. to Sims Ave., 5outh side York Ave. from Payne Ave. to Greenbrier St. & North side York Ave. from Edgerton St. to Payne Ave. S98105 - Both sides Kennard St. from E. Nevada Ave. to E. Nebraska Ave. 598106 - North side E. Magnolia Ave. from Barclay St. to Hazelwood St. E East side Sarclay St. from E. Magnolia Ave. to E. Rose Ave. 598107 - Both sides E. Montana Ave. from Hazelwood St. to Germain St. 598120 - Both sides E. Orange Ave. from N. Ruth St. to Pedersen St, , 598131 - Both sides Geranium Ave. from Nokomis Ave. to Edgewwater Blvd. ��' 7� 9 598132 - Both sides E. Rose Ave. from Nokomis Ave. to Hdgewater Blvd. Ward 7 S98085 - Both sides Falcon Ave. from S. Winthrop St, to S. McKnight Rd. S98086 - West side N. McKnight Rd. from E. Seventh St. to Stillwater Ave. 598108 - West side N. White Bear Ave. from Beech St_ to E. Minnehaha Ave. 598118 - East side Cypress St. from E. Fourth St. to E. Fifth St. & West side Cypress St. from Fremont Ave. to E. Fifth St. S98119 - North side Upper Afton Rd. from Kennard Ct. to Flandrau P1. rl� 7� �� DEPAflTMENT/OFFICFJCAUNqL OATEINITIA7ED GREEN SHEET `� N ��613 Public Works Sidewalks 6-3-98 INITIAL/DATE INITIAVDATE CONTACTPEASONBPHONE �DEPARTMEMDIREGTOR �CffYCOUNCIL JerryTvedt-266-6t21 � �CfTYA7TOflNEY �GTYCLERK MUST BE ON COUNCiI AGENDA BY (DATE) � � BUDGET DIRECTOR � FIN. & MGT. SERVICES DIR. � MAYOR (Oq ASSISTAN'n 1� COUnCII f�.E522I(�1 TOTAL %OF SIGNATURE PAGES _(CLIP ALL LOCA710N5 FOR SIGNANpE) � ASSOCIATE � DEP ACTION flE�UESTED ��'`� Construct & Reconstruc[ Sidewalk in �A{i1Q�y -l�)C/1 �}��. C[�� i HC� ��s J` �$ �' SF — 3L RECOMMENDAT70N5: Appmve (A) or qeje�x (fl) PERSONAL SERVICE CONTRACTS MUST ANSWEH THE FOLLOWING QUESTIONS: PLANNING COMMISSION _ CML SERVICE COMMISS70N �� H � m� P � S S � NOef W9fk2d ilnd2t d CoflVaCt fOf Sh15 depafUflen[? — YE q8 COMM I7TEE Z. Nas this personlfirm ever 6een a city employee? — — YES NO A S7AFF _ 3. Does this personlfirm possess a skili not nortnaly passessed by any current ciry — amployee? DISTRICTCOUNCIL YES NO SUPPoRTS WHICH COUNqL OBJECTNE? Exp�ain all yas answats on separete shoat aM attaeh to green sheet ' 2 1 INITIATING PR BL ; 15 : OP OA"1UN1T' �WHO. WHAT, WHEN, WHEflE, WFiY): The problem "defective sidewalk" was created because of tree roots, deleierious subgrade material, alternating freefthaw cycles, service life limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide level and must be addressed and corrected on an annual basis. Left uncorrected, the sidewalk condition would worsen to a state where it would be rendered unusable and subjed to increased pedestrian injuries from falls and possible litigations. ADVANTAGES IF APPROVED: The community will benefit from this project because it will provide safe detect free sidewalks for its many citizens. The sidewalk contracts are executed by private contractors, so it follows that private sector jobs are created as a result of this activity. DISADVANTAGES IF PPPROVFA_ Historically, the sidewalk reconstructions have created negative feedback in the area ot construction procedure and assessment. Simply stated, property owners detest assessments, and despite the fact up to one-half the assessment is City subsidized, it still remains controversial. DISADVANTAGES IF NOT APPROVEO: This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personal injury suits, ultimately resulti�g in the expenditure of larger dollar amounts in eventual repairs and/or replacement, as well as claim payouts. TOTALAMOUMOFTHANSACTION$ �IiJI -,- t Jr' C0.ST/REVENUEBUDGETED(CIpCLEONE) YES No FUNDINGSOURCE 9$^�^Q6�$ A� P�� = 6 �Q6� pCINITYNUMBEii �9g , 2T757-0784-Q0000 FINANqALMFORMATION:(EXPUIIN) B� AST = 325��00 c, cta 98 = Sa,oaa SUNIMt1RY OF ENGINEERING RECONIMENDATIONS Ward 1 t r'I � ��''1�� PROJECT• RECONSTRUCT SIDEWALB B.S. AURORA AVE. from N. Grotto St. to N. Dale St. INITIATING ACTION: This order was irvtiated by the Director of Public Works as public necessity on the basis of one {1) complaint, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITTONS: This walk is poured concrete with tree heaves, asphalt patches, disintegrated, scaled, settled and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALK B.S. CARROLL AVE. from N. Dale St. to N. Grotto St. � INITIATING ACTION: �� as public necessity on walk. This order was initiated hy the Director of Public Works the basis of one (1} complaint and an inspection of the EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALK S.S. HAGUE AVE. from N. Dunlap St. to N. Griggs St. 5� f��/ INITIATING ACTION: This order was initiated by the Director of Public Works � as public necessity on the basis of two (2) complaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled and settled panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALK N.S. PORTLAND AVE. from N. Griggs St. to 1241 Portland Ave. & S.S. PORTL[1ND AVE. from N. Griggs St. to 1234 Portland Ave. i �' Y ��/ Y� INITIATING ACTION as public necessity on walk. This order was initiated by the Director of Pubiic Works the basis of one (1) complaint and an inspection of the EXISTING CONDITI�NS: TYus walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. SUNiMARY OF ENGINEERING RECOMMENDATION Ward 2 �� '� `�� PROJECT• RECONSTRUCT SIDEWALK B.S. DALY ST. from Jefferson Ave. to Palace Ave. �$1 � INITIATING ACTION: as public necessity on the walk. This order was initiated by the Director of Public Works the basis of seven (7) complaints and an inspection of EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets, asphalt patches, settled and cracked panels. ................................................................... SiJMMARY OF ENGINEERING RECOD�IIvIENDATION �.8 '� `� � Ward 3 ��a�3 PROJECT• RECONSTRUCT SIDEWALS B.S. CRETIN AVE. from Berkeley Ave. to St. Clair Ave. & S.S. ST. CLAIR AVE. from Mt. Curve Blvd. to S. Cretin Ave. II�IITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on ihe basis of an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with heaves, scaled, settled and cracked panels. ................................................................... SI3NIMARY OF ENGINEERING RECOMMENDATIONS Ward 3 �s-��q PROJECT• RECONSTRUCT SIDEWALg S.S. MIJNSTER AVE. from Sue St. to S. Prior Ave. at 1916 Munster Ave. Only. ����$ INITIATING ACTION: This order was initiated by the Director af Public Works as public necessity on the basis of one (1) complaint, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves. ................................................................... PROJECT• RECONSTRITCT SIDEWALg WITH INTEGRAL CURB S.S. Rt1NDOLPH AVE. from S. Fairview Ave. to S. Wheeler St. S �Idt1QA IIVITIATING ACTION: This order was initiated by the Director of Public Works t���� �( as public necessity on the basis of five (5) complaints, a petition with one {1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, setfled and cracked panels. ................................................................... SUMMARY OF ENGINEERTNG RECONIMENDATIONS Ward 3 PROJECT• RECONSTRUCT SIDEWALS B.S. HAIrPFORD AVE. from S. Cretin Ave. to S. Cleveland Ave. �I� '�� � � A ��� O INITIATING ACTION: This order was initiated by the Director of Public Works � i� as public necessity on the basis of three (3) complaints, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, settied and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALK B.S. JTJNO AVE. from S. Cretin Ave. to S. Finn St. 5 yc� I�� INITIATING ACTION: This order was initiated by the Director of Public Works c U as public necessity on the basis of two (2) complaints, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALH B.S. S. PRIOR AVE. from Jefferson Ave, to WeIIesley Ave. & S.S. WELLESLEY AVE. from Kenneth St. to S. Prior Ave. �$I I� INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of three (3) complaints, aa petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches and settled panels. ................................................................... SUMMARY OF EI3GINEERING RECOMMENDATIONS '" �"'��� Ward 3 PROJECT• REGONSTRUCT SIDEWALg B.S. BEECHWOOD AVE. from S. Snelling Ave. Yo Davern St. S QqIZ� IIITITIATING ACTION: This order was initiated by the Director of Public Works (��� as public necessity on the basis of a five (5) complaints, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, setfled and cracked panels. ................................................................... PROJECT: RECONSTRUCT SIDEWALK B.S. BOHLt1ND AVE. from S. Fairview Ave. to Davern St. .CC�Q/�.L INITIATING ACTION: This order was initiated by tbe Director of Public Works �<<� as public necessity on the basis of three (3) complaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with heaved settled and cracked panels. ................................................................... PROJECT• RECONSTRUCT 5IDEWALK B.S. ROME AVE. from S. Fairview Ave. to Davern St. ��'� INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of fourteen (14) complaints and an inspection of the walk. EXISTING CONDITIONS: This wa�k is poured concrete with tree heaves> asphalt patches, disintegrated, scaled, setded and cracked panels. ................................................................... PROJECT� RECONSTRUCT SIDEWALK B.S. SUMMIT AVE. from S. Fairview Ave. to S. Prior Ave. . � INITIATING ACTION: This order was initiated bythe Director of Public Works �g$'Z as public necessity on the basis of four (4) complaints, a petit�on with one (1) signer and an inspection of the walk. EXISTTNG CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cra�cked panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATIONS Ward 3 dlg'�`�� PROJECT• RECONSTRUCT SIDEWAI.g B.S. JUNO AVE. from S. Milton St. to View St. 5(,��.�t IIvITIATING ACTION: � (N �-r� as public necessity on the walk. This order was initiated by the Director of Public Works the basis of a ten (10) complaints and an inspection of EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALS B.S. NORBERT LANE from St. Paul Ave. to Dorothea Ave. & B.S. NORBERT PL. from Norbert Lane to Cul-de-sac. C,QQ/�r� INITIATING ACTIOI�I: This order was initiated by the Director of Public Works ���� � as public necessity on the basis of eight {8) camplaints, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, disintegrated scaled, setfled and cracked panels. .................................................................. PROJECT• RECONSTRUCT SIDEWALK W.S. VIEW ST, from Juno Ave. to Randolph Ave. �A�l�d INITIATING ACTION: This order was initiated by the Director of Public Works � i��I � as public necessity on the basis of one (1) complaint and an inspection of the walk. EXISTIPIG CONDITIONS: This waik is poured concrete with tree heaves, water pockets, asphalt patches, settled and cracked panels. ................................................................... SUMIVIARY OF ENGINEERINCz RECOMMENDATIONS qY '� Ward 4 PRO.3ECT• RECONSTRUCT SIDEWALg E.S. FULHAM ST. from Hendon Ave. to W. Hoyt Ave. at 1554 Fulham St. Only. L�Q�(� I1vITIATING ACTTON: 'I`his order was initiated by a request by the property � ( V V u owner. EXISTING CONDITIONS: This walk is poured concrete with offgrade and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALH S.S. W. HOYT AVE. from N. Cleveland Ave. to Grantham St. at 2218 W. Hoyt Ave. Only & E.S. GRANTHAM �� ST. from Dudley Ave. to W. Hoyt Ave. I1vITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches and scaled panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATIONS Ward 4 5q$I13 ati �� `�°� PROJECT• RECONSTRUCT SIDEWALg E.S. BRANSTOIV ST. from Hendon Ave. to W. Hoyt Ave. at 1546 Branston St. Only. INITIATIIHG ACTION: This order was initiated by a request from the property owner. EXISTING CONDITIONS: This walk is poured concrete with offgrade and scaled panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALK B.S. DOSWELL AVE. from Keston St. to Eustis St. ��� `� INITIATING ACTIOPi: as public necessity on inspection of the walk. This order was initiated by the Director of Public Works the basis of a petition with one (1} signer and an EXISTING CONDITIONS: This walk is poured concrete with tree heaves> scaled, settled and cracked panels. ................................................................... PROJECT' RECONSTILiJCT SIDEWALK S.S. W. HOYT AVE. from N. Cleveland Ave. to Grantham St. at 2200 W. Hoyt Ave. Only. �$11� INITIATING ACTION: This order was initiated by a request from the property owner. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches and scaled panels. ................................................................... SUMIVLARY OF ENGINEERING RECOMMENDATIONS .-.� a� .��.� PRO�TF'CT• RECONSTRUCT SIAEWALS E.S. GRANI'HAM ST: from Dudley Ave. to W. Hoyt Ave. at 1550 Grantham St. Only. ���� Il�IITIATING� ACTION: This order was initiated bp a request from the property owner. EXISTIPiG COI�IDITIONS: Ttus walk is poured concrete with cracked panels. .................................................................. PRO.TECT: RECONSTRUCT SIDEWALK B.S. SARGENT AVE. from S. Prior Ave. to S. Howell St. �$I � INITIATING ACTION: as public necessity on walk. This order was initiated by the Director of Public Works the basis of two (2) complaints and an inspection of the EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. .................................................................. STJNIMARY OF ENGINEERING RECONIMENDATIONS O� �'� �` Ward 5 PROJECT• RECONSTRUCT SIDEWALg B.S. CHELSEA ST. from W. Arlington Ave. to W. Hoyt Ave. �� (�y� I INITIATING ACTION: This order was initiated by the D'uector of Public Works 0 � as public necessity on the basis of eight (8) complaints, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWA,LH S.S. FRONT AVE. from N. St. Albans St. to N. Dale St. & N.S. FRONT AVE. from N. St. Albans S. to Como Ave. ��� INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of three (3) complaints and an inspection of the walk. EXISTING CONDITION5: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and multi-cracked panels. ................................................................... SLTM1V�1aRY OF ENGINEERING RECOMMENDATIONS Wazd 5 ��'� 1't. PROJECT• CONSTRUCT & RECONSTRUCT SIDEWALK B.S. BRADLEY Sf. from Case Ave. to 951 Bradley St. S���OZ INITIATING ACTION: Tkus order was initiated by the Director of Public Works as public necessity on the basis of one (1) complaint and an inspection of the walk. EXISTING CONDITIONS: This walk is old tile with broken tile, holes in tile, offgrade and cracks in tile. ................................................................... �� � � PROJECT• RECONSTRUCT SIDEWALK B.S. JENKS AVE. from Westminster St. to Arkwright St. IPIITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of one (1) complaint, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, scaled, settled and cracked panels. ...................................... . ............................ ��� PROJECT• RECONSTRUCT SIDEWALK N.S. W. NEBRASKA AVE. from N. Milton St. to N. Victoria St. INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the hasis of one (1) complaint, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATIONS Ward 5 � PROJECT• RECONSTRUCT SIDEWALg S.S. CASE AVE. from Clark St. to Desoto St. 5 (�� � � � INITIATING ACTION: ( as public necessity on inspection of the walk. This order was initiated by the Director of Public Works the basis of a petition with one (1) signer and an EXISTING CONDITIONS: This walk is poured concrete with scaled, uneven and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALB B.S. N. DALE ST. from W. Arlington Ave. to W. Nebraska Ave. 5 qQ �� INITIATING ACTION: This order was initiated by the Director of Pubiic Works 4 0 � as public necessity on the basis of five (5) complaints, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... SUNIMARY OF ENGINEERING RECOMMENDATIONS Ward 6 qK ,��.�, PROJECT• RECONSTRUCT SIDEWALS B.S. N. HAZEL ST. from E. Hyacinth Ave. to Clear Ave. �q$Q�� INITIATING ACTION: as public necessity on walk. This order was initiated by the Director of Public Works the basis of one (1) complaint and an inspection of the EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches scaled, setfled and cracked panels. ................................................................... PROJECT: RECONSTRUCT SIDEWALK B.S. E. MARYLAND AVE. from Mendota St. to Forest St. Gq,�Odd INITIATING ACTION: !Y� �P as public necessity on the walk. This order was initiated by the Director of Public Works the basis of ten (10) complaints and an inspection of EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... �.`,� I � PROJECT' RECONSTRUCT SIDEWALK W.S. NOKOMIS AVE. from E. Geranium Ave. to E. Rose Ave. at 2367 Nokomis Ave. Only. INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of a petition with one (1) signer and an inspection of the walk. EXISTING CONDITTONS: This walk is poured concrete with settied panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALK WITH INTEGRAL CURB B.S. PAYNE AVE. from Wells St. to Sims Ave., S.S. YORK AVE. from Payne Ave. to Greenbrier St. & N.S. YORK AVE. from Edgerton St. to Payne Ave. J � UV�� IPIITIATING ACTION: as public necessity on walk. This order was initiated by the Director of Public Works the basis of six (6) complaints and an inspection of the EXISTING CONDITIONS: This walk is poured concrete with asphalt patches, disintegrated, scaled, settled and cracked panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATIONS Ward 6 ��.�Nq PROJECT• RECONSTRUCT 5IDEWALg B.S. KENNAF2D ST. from E. Nevada Ave. to E. Nebraska Ave. ��� INITIATII�iG ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of three {e) complaints, a petition with one (1j signer and an inspection of the walk. EXISTIPTG COI�IDITIONS: This walk is poured concrete with tree heaves, asphalt patches and cracked panels. ................................................................... PR[1TF("r CONSTRUCT & RECONSTRIICT SIDEWALK N.S. E. MAGNOLIA AVE. from Barclay St. to Hazelwood St. & E.S. BARCLAY ST. from E. Magnolia Ave. to E. Rose Ave. / �'� INITIATING ACTION: as public necessity on walk. This order was initiated by the Director of Public Works the basis of one (1} complaint and an inspection of the EXISTING CONDITIONS: This walk is poured cancrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... PROJECT: RECONSTRUCT SIDEWALK B.S. E. MONTANA AVE. from Hazelwood St. to Germain St. y��p� INITIATING ACTION: as public necessity on the walk. This order was initiated by the Director of Public Works the basis of three t3) complaints and an inspection of EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... SUMMARY OF ENGINEERING RECONIMENDATION Ward 6 ��,��� PROJECT' RECONSTRUCT 5IDEWALg B.S. E. ORANGE AVE, from N. Ruth St. to Pedersen St. 5 q$' ZO INITIATING ACTION: as public necessity on the wa1k. This order was initiated by the Director of Public Works the basis of a three (3) complaints and an inspection of EXISTIPIG CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATIONS Ward 6 5g�►31 c��_1�q PROJECT• CONSTRUCT & RECONSTRUCT SIDEWALH B.S. GERANIUM AVE. from Nokomis Ave. to Edgewater Blvd. INITIATING ACTION: as public necessity on walk. This order was initiated by the Director of Public Works the basis of two (2J complaints and an inspection of the EXISTING CONDITIOPIS: This walk is poured concrete with tree heaves, water pockets, asphalt patches, scaled, settled and cracked panels. ................................................................... PROJECT• CONSTRUCT & REGONSTRUCT SIDEWALK B.S. E. ROSE AVE. from Nokomis Ave. to Edgewater Blvd. 5�',12 INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of nine (9) complaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, disintegrated, scaled, settled and cracked panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATIONS Ward 7 P12QJECT• RECONSTRI3CT SIDEWAT.K B.S. FALCdN AVE. form S. Winthrop St. to S. McKnight Rd. °tY ��`�� jgQ(}�C, INITIATING ACTION: This order was uZitiated by the Director of Public Works � � �vIJ as public necessity on the basis of eleven (11) complaints two (2J petitions with one (lJ signer and an inspection of the walk. EXISTING CONDITIONS: TYus walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. ................................................................... PROJECT: RECONSTRUCT SIDEWALS W.S. N. MCKNIGHT RD. from E. Seventh St. to Stillwater Ave. � � (IV NQ INITIATING ACTION: as public necessity on walk. This order was initiated by the Director of Fublic Works the basis of two (2) complaints and an inspection of the EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, disintegrated, scaled, settled and cracked panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATION aY���� Ward 7 PROJECT• RECONSTRUCT SIDEWALH W.S. N. WHIT'E BEAR AVE. from Beech St. to E. Minnehaha Ave. 5�' O� INITIATING ACTION: This order was iuritiated by the Director of Public Works as public necessity on the basis of a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, scaled, settled and cracked panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATIOIVS Ward 7 � PROJECT• RECONSTRUCT SIDEWALK E,S. CYPRESS ST. from E. Fourth St. to E. Fifth St. & W.S. CYPRESS ST. from Fremont Ave. to E. Fifth St. SG� � �� INITIATING ACTION: d � U as public necessity on the walk. This order was initiated by the Director of Public Works the basis of a one fl) complaint and an inspection of EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. ................................................................... PROJECT• RECQNSTRUCT SIDEWALK N.S. UPPER AF"TON RD. from Kennard Ct. to Flandrau Pl. S QI�"� INITIATING ACTION: This order was initiated by the Director of Public Works � �� as public necessity on the basis of one (lj complaint, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: 'This walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. ................................................................... �k 3 : CITY OF ST. PAUI. PRELIMINARY ORDER OR�G�N��UNC LE NO. g8_Gn�_ � BY �%�y��i,�,G���i File No. 598085-598108 & 59811�-598132 Voting Ward 1,2,3,4,5,6,7 In the Matter o£ sidewalk reconstruction at the following locations: (See attached Exhibit A) *ESTIMATED CONSTRUCTION RATES RESIDENTIAL RATES (One, two or three family structures} Reconstruction (replacement of old sidewalk) -$7.65 per front foot for a five (5) foot wide walk and 59.18 per front foot £or a six (6) foot wide walk. All other widths will be prorated accordingly. New construction (where no walk existed) - 100$ of the actual cost estimated to be approximately $3.42 per square £oot. All corner residential properties will receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abuttinq the "long side" of the property. MULTI-RESIDENTIAL(More than three family structures�, NON-RESIDENTIAL RATES For new and reconstructed sidewalk; 100$ of actual cost estimated to be approximately $4.62 per square foot. The Council of the City of Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: 1 2 3 That the said report and the same is hereby approved with no alternatives, and that the estimated cost thereof is *SEE ABOVE for estimated construction rates, financed by assessments and 1998 Public Improvement Aid. That a public hearing be had on said improvement on the 12th of Auaust, 1998 at 5:30 o'clack P,.M., in the Council Chambezs of the City Ha11 and Court House Buildinq in��the City o£ Saint Paul. That notice of said public hearing be given to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cost thereof as estimated. COUNCILPERSONS Yeas Nays � enanav �lakey �/$ostrom �oleman ,/�arris � ntry �iter �In Favor � Against Adopted by Council: Date����1��� Certified Passed by Council Secretary gy � \ _ � J. � 1--�.�,, � v �+.- Mayor t' CITY OE ST. PAUL FINPS, ORDER .�iyi� ��� �'/jz /as� �3 0 R! G 1 N A L COUNC L F ✓� I�yO � "� � B �/1( Fi e . S98085-598108 & 598110-598132 Votinq Ward 1,2,3,4,5,6,7_ In the Matter of sidewalk reconstruction at the £olloming locations: (see attached Exhibit A� *ESTIMATED CONSTRUCTION RATES RESIDENTIAL RATES (One, two or three £amily structures) Reconstruction (replacement of old sidewalk) -$7.65 per front foot for a£ive (5) foot wide walk and $9.18 per front foot for a six (6) foot wide , walk. All other widths will be prorated accordingly. New construction (where no walk existed) - 100°s of the actual cost estimated to be approximately $3.42 per square foot. All corner residential properties will receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abutting the "long side" of the property. MULTI-RESIDENTIAL (More than three family structures), NON RESIDENTIAL RATES For new and reconstructed sidewalk; 100°s of actual cost estimated to be approximately $4.62 per square foot. under Preliminary order � p ^ b� p approved � The Council of the City of Saint Pau1 has conducte a pu 1ic hearing upon the above improvement, due notice thereof having been given as prescribed by the City Charter; and WHEREAS, The Council has heard all persons, objections and recommendations pertaining to said proposed improvement and has fully considered the same; now, therefore, be it RESOLVED, That the Council of the City o£ Saint Paul does hereby order that the above-described improvement be made, and the proper City of£icers are hereby directed and authorized to proceed with the improvement; and be it FURTHER RESOLVED, That upon the completion of said improvement, the proper City officers shall calculate all expenses incurred therein and shall report the same to the City Council in accordance with Chapter 14 of the City Charter. COUNCILPERSONS Yeas Nays .� Benanav ✓ Blakey ,� Bostrom ,/ Coleman ✓ Harris ✓ Lantry ,/ Reiter Adopted by Council: Certified Passed by �In �Aga' Date1�G"� /yS°S� Council Secretary s CITY OE ST. PAUL COUNCIL EILE NO. �� +��� FINAL ORDER By File No. 598085-598108 & 598110-598132 Exhibit A Voting Ward_ 1,2,3,4,5,6,7_ In the Matte= of sidewalk =econstruction at the following locations: Ward 1 S98094 - Both sides Aurora Ave. from N. Grotto St. to N. Dale St. � ,y� 598095 - Both sides Carroll Ave. from N. Dale St. to N. Grotto St.� L d �Ai�.,Z6��9d� 598096 - Both sides Hague Ave. from N. Dunlap St, to Griggs St. S9809� - North side Portland Ave. £rom N. Griggs St. to 1241 Portland Ave. & South side Portland Ave. from N. Griggs St. to 1234 Portland Ave. Ward 2 598125 - Both sides Daly St. from Jefferson Ave. to Palace Ave. Wasd 3 598093 - Both sides Cretin Ave. from Berkeley Ave. to St. Clair Ave. & South side St. Clair Ave. from Mt. Curve Blvd. to S. Cretin Ave. 598098 - South side Munster Ave. from Sue St. to 5. Prior Ave, at 1916 Munster Ave. Only. � 598099 - South side Randolph Ave. from S. Fairview Ave. to S. Wheeler St.� �r�/ �vy 26,9s' 598110 - Both sides Hartford Ave. from S. Cretin Ave. to S. Cleveland Ave. � 598111 - Both sides Juno Ave. from S. Cretin Ave. to S. Finn St.*2161 June Ave. deleted 598112 - Both sides S. Prior Ave. from Jefferson Ave. to Wellesley Ave. & South side Wellesley Ave. from Kenneth St. to S. Prior Ave. 598121 - Both sides Beechwood Ave. from S. Snelling Ave. to Davern St. � 598122 - Both sides Bohland Ave. from S. Fairview Ave. to Davern St.*1741 Bohland Ave. deleted Y� 598123 - Both sides Rome Ave. from S. Fairview Ave. to Davern St.*1741 Rome Ave. deleted 598124 - Both sides Summit Ave. from S. Fairview Ave. to S. Prior Ave. 598126 - Both sides Juno Ave. from S. Milton St. to View St. * S�}&4-�3 I�ox�-���--fxrmr-Ydvrber��asa-to-£u3�=sa�- Deleted 8(12J98 598128 - West side View St, from Juno Ave. to Randolph Ave. � Ward 4 ! C/���� 598100 - East side Fulham St. from Hendon Ave. to W. Hoyt Ave. at 1554 Fulham St. Only. 5981�1 - South side W. Hoyt Ave. from N. Cleveland Ave. to Grantham St. at 2218 W. Hoyt Ave. Only & East side Grantham St. from Dudley Ave. to W. Hoyt Ave. 598113 - East side Branston St. fram Hendon Ave. to W. Hoyt Ave. at 1546 Branston St. Only. 598114 - Both sides Doswell Ave. from Keston St. to Eustis St. 598115 - South side W. Hoyt Ave. from N. Cleveland Ave. to Grantham St. at 2200 W. Hoyt Ave. Only. S98129 - East side Grantham St. from Dudley Ave. to W. Hoyt Ave. at 1550 Grantham St. Only. S98130 - Both sides Sargent Ave. from S. Prior Ave. to S. Howell St. Ward 5 ,� S98091 - Both sides Chelsea St. from W. Arlington Ave. to W. Hoyt Ave.� ' %d ��zG�q� 598092 - South side Front Ave. from N. St. Albans St. to N. Dale St. & North side Front Ave. from N. St. Albans St. to Como Ave. � 598102 - Both sides Bradley St. from Case Ave. to 951 Bradley St.> �� id ��zv/q� 598103 - Both sides Jenks Ave. from Westminster St. to Arlcwright St. � 598104 - North side W. Nebraska Ave. from N. Milton St. to N. Victoria St � d T � s' /zG/9t� 598116 - South side Case Ave. from Clark St. to Desoto St. S98117 - Both sides N. Dale St. from W. Arlington Ave. to W. Nebraska Ave. Ward 6 598087 - Both sides N. Hazel St. from E. Hyacinth Ave. to Clear Ave. 598088 - Both sides E. Maryland Ave. from Mendota 5t. to Forest St. 598089 - West side Nokomis Ave. from E. Geranium Ave. to E. Rose Ave. at 2367 Nokomis Ave. Only. S98090 - Both sides Payne Ave. from Wells St. to Sims Ave., 5outh side York Ave. from Payne Ave. to Greenbrier St. & North side York Ave. from Edgerton St. to Payne Ave. S98105 - Both sides Kennard St. from E. Nevada Ave. to E. Nebraska Ave. 598106 - North side E. Magnolia Ave. from Barclay St. to Hazelwood St. E East side Sarclay St. from E. Magnolia Ave. to E. Rose Ave. 598107 - Both sides E. Montana Ave. from Hazelwood St. to Germain St. 598120 - Both sides E. Orange Ave. from N. Ruth St. to Pedersen St, , 598131 - Both sides Geranium Ave. from Nokomis Ave. to Edgewwater Blvd. ��' 7� 9 598132 - Both sides E. Rose Ave. from Nokomis Ave. to Hdgewater Blvd. Ward 7 S98085 - Both sides Falcon Ave. from S. Winthrop St, to S. McKnight Rd. S98086 - West side N. McKnight Rd. from E. Seventh St. to Stillwater Ave. 598108 - West side N. White Bear Ave. from Beech St_ to E. Minnehaha Ave. 598118 - East side Cypress St. from E. Fourth St. to E. Fifth St. & West side Cypress St. from Fremont Ave. to E. Fifth St. S98119 - North side Upper Afton Rd. from Kennard Ct. to Flandrau P1. rl� 7� �� DEPAflTMENT/OFFICFJCAUNqL OATEINITIA7ED GREEN SHEET `� N ��613 Public Works Sidewalks 6-3-98 INITIAL/DATE INITIAVDATE CONTACTPEASONBPHONE �DEPARTMEMDIREGTOR �CffYCOUNCIL JerryTvedt-266-6t21 � �CfTYA7TOflNEY �GTYCLERK MUST BE ON COUNCiI AGENDA BY (DATE) � � BUDGET DIRECTOR � FIN. & MGT. SERVICES DIR. � MAYOR (Oq ASSISTAN'n 1� COUnCII f�.E522I(�1 TOTAL %OF SIGNATURE PAGES _(CLIP ALL LOCA710N5 FOR SIGNANpE) � ASSOCIATE � DEP ACTION flE�UESTED ��'`� Construct & Reconstruc[ Sidewalk in �A{i1Q�y -l�)C/1 �}��. C[�� i HC� ��s J` �$ �' SF — 3L RECOMMENDAT70N5: Appmve (A) or qeje�x (fl) PERSONAL SERVICE CONTRACTS MUST ANSWEH THE FOLLOWING QUESTIONS: PLANNING COMMISSION _ CML SERVICE COMMISS70N �� H � m� P � S S � NOef W9fk2d ilnd2t d CoflVaCt fOf Sh15 depafUflen[? — YE q8 COMM I7TEE Z. Nas this personlfirm ever 6een a city employee? — — YES NO A S7AFF _ 3. Does this personlfirm possess a skili not nortnaly passessed by any current ciry — amployee? DISTRICTCOUNCIL YES NO SUPPoRTS WHICH COUNqL OBJECTNE? Exp�ain all yas answats on separete shoat aM attaeh to green sheet ' 2 1 INITIATING PR BL ; 15 : OP OA"1UN1T' �WHO. WHAT, WHEN, WHEflE, WFiY): The problem "defective sidewalk" was created because of tree roots, deleierious subgrade material, alternating freefthaw cycles, service life limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide level and must be addressed and corrected on an annual basis. Left uncorrected, the sidewalk condition would worsen to a state where it would be rendered unusable and subjed to increased pedestrian injuries from falls and possible litigations. ADVANTAGES IF APPROVED: The community will benefit from this project because it will provide safe detect free sidewalks for its many citizens. The sidewalk contracts are executed by private contractors, so it follows that private sector jobs are created as a result of this activity. DISADVANTAGES IF PPPROVFA_ Historically, the sidewalk reconstructions have created negative feedback in the area ot construction procedure and assessment. Simply stated, property owners detest assessments, and despite the fact up to one-half the assessment is City subsidized, it still remains controversial. DISADVANTAGES IF NOT APPROVEO: This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personal injury suits, ultimately resulti�g in the expenditure of larger dollar amounts in eventual repairs and/or replacement, as well as claim payouts. TOTALAMOUMOFTHANSACTION$ �IiJI -,- t Jr' C0.ST/REVENUEBUDGETED(CIpCLEONE) YES No FUNDINGSOURCE 9$^�^Q6�$ A� P�� = 6 �Q6� pCINITYNUMBEii �9g , 2T757-0784-Q0000 FINANqALMFORMATION:(EXPUIIN) B� AST = 325��00 c, cta 98 = Sa,oaa SUNIMt1RY OF ENGINEERING RECONIMENDATIONS Ward 1 t r'I � ��''1�� PROJECT• RECONSTRUCT SIDEWALB B.S. AURORA AVE. from N. Grotto St. to N. Dale St. INITIATING ACTION: This order was irvtiated by the Director of Public Works as public necessity on the basis of one {1) complaint, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITTONS: This walk is poured concrete with tree heaves, asphalt patches, disintegrated, scaled, settled and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALK B.S. CARROLL AVE. from N. Dale St. to N. Grotto St. � INITIATING ACTION: �� as public necessity on walk. This order was initiated hy the Director of Public Works the basis of one (1} complaint and an inspection of the EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALK S.S. HAGUE AVE. from N. Dunlap St. to N. Griggs St. 5� f��/ INITIATING ACTION: This order was initiated by the Director of Public Works � as public necessity on the basis of two (2) complaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled and settled panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALK N.S. PORTLAND AVE. from N. Griggs St. to 1241 Portland Ave. & S.S. PORTL[1ND AVE. from N. Griggs St. to 1234 Portland Ave. i �' Y ��/ Y� INITIATING ACTION as public necessity on walk. This order was initiated by the Director of Pubiic Works the basis of one (1) complaint and an inspection of the EXISTING CONDITI�NS: TYus walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. SUNiMARY OF ENGINEERING RECOMMENDATION Ward 2 �� '� `�� PROJECT• RECONSTRUCT SIDEWALK B.S. DALY ST. from Jefferson Ave. to Palace Ave. �$1 � INITIATING ACTION: as public necessity on the walk. This order was initiated by the Director of Public Works the basis of seven (7) complaints and an inspection of EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets, asphalt patches, settled and cracked panels. ................................................................... SiJMMARY OF ENGINEERING RECOD�IIvIENDATION �.8 '� `� � Ward 3 ��a�3 PROJECT• RECONSTRUCT SIDEWALS B.S. CRETIN AVE. from Berkeley Ave. to St. Clair Ave. & S.S. ST. CLAIR AVE. from Mt. Curve Blvd. to S. Cretin Ave. II�IITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on ihe basis of an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with heaves, scaled, settled and cracked panels. ................................................................... SI3NIMARY OF ENGINEERING RECOMMENDATIONS Ward 3 �s-��q PROJECT• RECONSTRUCT SIDEWALg S.S. MIJNSTER AVE. from Sue St. to S. Prior Ave. at 1916 Munster Ave. Only. ����$ INITIATING ACTION: This order was initiated by the Director af Public Works as public necessity on the basis of one (1) complaint, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves. ................................................................... PROJECT• RECONSTRITCT SIDEWALg WITH INTEGRAL CURB S.S. Rt1NDOLPH AVE. from S. Fairview Ave. to S. Wheeler St. S �Idt1QA IIVITIATING ACTION: This order was initiated by the Director of Public Works t���� �( as public necessity on the basis of five (5) complaints, a petition with one {1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, setfled and cracked panels. ................................................................... SUMMARY OF ENGINEERTNG RECONIMENDATIONS Ward 3 PROJECT• RECONSTRUCT SIDEWALS B.S. HAIrPFORD AVE. from S. Cretin Ave. to S. Cleveland Ave. �I� '�� � � A ��� O INITIATING ACTION: This order was initiated by the Director of Public Works � i� as public necessity on the basis of three (3) complaints, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, settied and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALK B.S. JTJNO AVE. from S. Cretin Ave. to S. Finn St. 5 yc� I�� INITIATING ACTION: This order was initiated by the Director of Public Works c U as public necessity on the basis of two (2) complaints, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALH B.S. S. PRIOR AVE. from Jefferson Ave, to WeIIesley Ave. & S.S. WELLESLEY AVE. from Kenneth St. to S. Prior Ave. �$I I� INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of three (3) complaints, aa petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches and settled panels. ................................................................... SUMMARY OF EI3GINEERING RECOMMENDATIONS '" �"'��� Ward 3 PROJECT• REGONSTRUCT SIDEWALg B.S. BEECHWOOD AVE. from S. Snelling Ave. Yo Davern St. S QqIZ� IIITITIATING ACTION: This order was initiated by the Director of Public Works (��� as public necessity on the basis of a five (5) complaints, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, setfled and cracked panels. ................................................................... PROJECT: RECONSTRUCT SIDEWALK B.S. BOHLt1ND AVE. from S. Fairview Ave. to Davern St. .CC�Q/�.L INITIATING ACTION: This order was initiated by tbe Director of Public Works �<<� as public necessity on the basis of three (3) complaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with heaved settled and cracked panels. ................................................................... PROJECT• RECONSTRUCT 5IDEWALK B.S. ROME AVE. from S. Fairview Ave. to Davern St. ��'� INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of fourteen (14) complaints and an inspection of the walk. EXISTING CONDITIONS: This wa�k is poured concrete with tree heaves> asphalt patches, disintegrated, scaled, setded and cracked panels. ................................................................... PROJECT� RECONSTRUCT SIDEWALK B.S. SUMMIT AVE. from S. Fairview Ave. to S. Prior Ave. . � INITIATING ACTION: This order was initiated bythe Director of Public Works �g$'Z as public necessity on the basis of four (4) complaints, a petit�on with one (1) signer and an inspection of the walk. EXISTTNG CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cra�cked panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATIONS Ward 3 dlg'�`�� PROJECT• RECONSTRUCT SIDEWAI.g B.S. JUNO AVE. from S. Milton St. to View St. 5(,��.�t IIvITIATING ACTION: � (N �-r� as public necessity on the walk. This order was initiated by the Director of Public Works the basis of a ten (10) complaints and an inspection of EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALS B.S. NORBERT LANE from St. Paul Ave. to Dorothea Ave. & B.S. NORBERT PL. from Norbert Lane to Cul-de-sac. C,QQ/�r� INITIATING ACTIOI�I: This order was initiated by the Director of Public Works ���� � as public necessity on the basis of eight {8) camplaints, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, disintegrated scaled, setfled and cracked panels. .................................................................. PROJECT• RECONSTRUCT SIDEWALK W.S. VIEW ST, from Juno Ave. to Randolph Ave. �A�l�d INITIATING ACTION: This order was initiated by the Director of Public Works � i��I � as public necessity on the basis of one (1) complaint and an inspection of the walk. EXISTIPIG CONDITIONS: This waik is poured concrete with tree heaves, water pockets, asphalt patches, settled and cracked panels. ................................................................... SUMIVIARY OF ENGINEERINCz RECOMMENDATIONS qY '� Ward 4 PRO.3ECT• RECONSTRUCT SIDEWALg E.S. FULHAM ST. from Hendon Ave. to W. Hoyt Ave. at 1554 Fulham St. Only. L�Q�(� I1vITIATING ACTTON: 'I`his order was initiated by a request by the property � ( V V u owner. EXISTING CONDITIONS: This walk is poured concrete with offgrade and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALH S.S. W. HOYT AVE. from N. Cleveland Ave. to Grantham St. at 2218 W. Hoyt Ave. Only & E.S. GRANTHAM �� ST. from Dudley Ave. to W. Hoyt Ave. I1vITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches and scaled panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATIONS Ward 4 5q$I13 ati �� `�°� PROJECT• RECONSTRUCT SIDEWALg E.S. BRANSTOIV ST. from Hendon Ave. to W. Hoyt Ave. at 1546 Branston St. Only. INITIATIIHG ACTION: This order was initiated by a request from the property owner. EXISTING CONDITIONS: This walk is poured concrete with offgrade and scaled panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALK B.S. DOSWELL AVE. from Keston St. to Eustis St. ��� `� INITIATING ACTIOPi: as public necessity on inspection of the walk. This order was initiated by the Director of Public Works the basis of a petition with one (1} signer and an EXISTING CONDITIONS: This walk is poured concrete with tree heaves> scaled, settled and cracked panels. ................................................................... PROJECT' RECONSTILiJCT SIDEWALK S.S. W. HOYT AVE. from N. Cleveland Ave. to Grantham St. at 2200 W. Hoyt Ave. Only. �$11� INITIATING ACTION: This order was initiated by a request from the property owner. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches and scaled panels. ................................................................... SUMIVLARY OF ENGINEERING RECOMMENDATIONS .-.� a� .��.� PRO�TF'CT• RECONSTRUCT SIAEWALS E.S. GRANI'HAM ST: from Dudley Ave. to W. Hoyt Ave. at 1550 Grantham St. Only. ���� Il�IITIATING� ACTION: This order was initiated bp a request from the property owner. EXISTIPiG COI�IDITIONS: Ttus walk is poured concrete with cracked panels. .................................................................. PRO.TECT: RECONSTRUCT SIDEWALK B.S. SARGENT AVE. from S. Prior Ave. to S. Howell St. �$I � INITIATING ACTION: as public necessity on walk. This order was initiated by the Director of Public Works the basis of two (2) complaints and an inspection of the EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. .................................................................. STJNIMARY OF ENGINEERING RECONIMENDATIONS O� �'� �` Ward 5 PROJECT• RECONSTRUCT SIDEWALg B.S. CHELSEA ST. from W. Arlington Ave. to W. Hoyt Ave. �� (�y� I INITIATING ACTION: This order was initiated by the D'uector of Public Works 0 � as public necessity on the basis of eight (8) complaints, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWA,LH S.S. FRONT AVE. from N. St. Albans St. to N. Dale St. & N.S. FRONT AVE. from N. St. Albans S. to Como Ave. ��� INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of three (3) complaints and an inspection of the walk. EXISTING CONDITION5: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and multi-cracked panels. ................................................................... SLTM1V�1aRY OF ENGINEERING RECOMMENDATIONS Wazd 5 ��'� 1't. PROJECT• CONSTRUCT & RECONSTRUCT SIDEWALK B.S. BRADLEY Sf. from Case Ave. to 951 Bradley St. S���OZ INITIATING ACTION: Tkus order was initiated by the Director of Public Works as public necessity on the basis of one (1) complaint and an inspection of the walk. EXISTING CONDITIONS: This walk is old tile with broken tile, holes in tile, offgrade and cracks in tile. ................................................................... �� � � PROJECT• RECONSTRUCT SIDEWALK B.S. JENKS AVE. from Westminster St. to Arkwright St. IPIITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of one (1) complaint, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, scaled, settled and cracked panels. ...................................... . ............................ ��� PROJECT• RECONSTRUCT SIDEWALK N.S. W. NEBRASKA AVE. from N. Milton St. to N. Victoria St. INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the hasis of one (1) complaint, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATIONS Ward 5 � PROJECT• RECONSTRUCT SIDEWALg S.S. CASE AVE. from Clark St. to Desoto St. 5 (�� � � � INITIATING ACTION: ( as public necessity on inspection of the walk. This order was initiated by the Director of Public Works the basis of a petition with one (1) signer and an EXISTING CONDITIONS: This walk is poured concrete with scaled, uneven and cracked panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALB B.S. N. DALE ST. from W. Arlington Ave. to W. Nebraska Ave. 5 qQ �� INITIATING ACTION: This order was initiated by the Director of Pubiic Works 4 0 � as public necessity on the basis of five (5) complaints, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... SUNIMARY OF ENGINEERING RECOMMENDATIONS Ward 6 qK ,��.�, PROJECT• RECONSTRUCT SIDEWALS B.S. N. HAZEL ST. from E. Hyacinth Ave. to Clear Ave. �q$Q�� INITIATING ACTION: as public necessity on walk. This order was initiated by the Director of Public Works the basis of one (1) complaint and an inspection of the EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches scaled, setfled and cracked panels. ................................................................... PROJECT: RECONSTRUCT SIDEWALK B.S. E. MARYLAND AVE. from Mendota St. to Forest St. Gq,�Odd INITIATING ACTION: !Y� �P as public necessity on the walk. This order was initiated by the Director of Public Works the basis of ten (10) complaints and an inspection of EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... �.`,� I � PROJECT' RECONSTRUCT SIDEWALK W.S. NOKOMIS AVE. from E. Geranium Ave. to E. Rose Ave. at 2367 Nokomis Ave. Only. INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of a petition with one (1) signer and an inspection of the walk. EXISTING CONDITTONS: This walk is poured concrete with settied panels. ................................................................... PROJECT• RECONSTRUCT SIDEWALK WITH INTEGRAL CURB B.S. PAYNE AVE. from Wells St. to Sims Ave., S.S. YORK AVE. from Payne Ave. to Greenbrier St. & N.S. YORK AVE. from Edgerton St. to Payne Ave. J � UV�� IPIITIATING ACTION: as public necessity on walk. This order was initiated by the Director of Public Works the basis of six (6) complaints and an inspection of the EXISTING CONDITIONS: This walk is poured concrete with asphalt patches, disintegrated, scaled, settled and cracked panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATIONS Ward 6 ��.�Nq PROJECT• RECONSTRUCT 5IDEWALg B.S. KENNAF2D ST. from E. Nevada Ave. to E. Nebraska Ave. ��� INITIATII�iG ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of three {e) complaints, a petition with one (1j signer and an inspection of the walk. EXISTIPTG COI�IDITIONS: This walk is poured concrete with tree heaves, asphalt patches and cracked panels. ................................................................... PR[1TF("r CONSTRUCT & RECONSTRIICT SIDEWALK N.S. E. MAGNOLIA AVE. from Barclay St. to Hazelwood St. & E.S. BARCLAY ST. from E. Magnolia Ave. to E. Rose Ave. / �'� INITIATING ACTION: as public necessity on walk. This order was initiated by the Director of Public Works the basis of one (1} complaint and an inspection of the EXISTING CONDITIONS: This walk is poured cancrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... PROJECT: RECONSTRUCT SIDEWALK B.S. E. MONTANA AVE. from Hazelwood St. to Germain St. y��p� INITIATING ACTION: as public necessity on the walk. This order was initiated by the Director of Public Works the basis of three t3) complaints and an inspection of EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... SUMMARY OF ENGINEERING RECONIMENDATION Ward 6 ��,��� PROJECT' RECONSTRUCT 5IDEWALg B.S. E. ORANGE AVE, from N. Ruth St. to Pedersen St. 5 q$' ZO INITIATING ACTION: as public necessity on the wa1k. This order was initiated by the Director of Public Works the basis of a three (3) complaints and an inspection of EXISTIPIG CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled and cracked panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATIONS Ward 6 5g�►31 c��_1�q PROJECT• CONSTRUCT & RECONSTRUCT SIDEWALH B.S. GERANIUM AVE. from Nokomis Ave. to Edgewater Blvd. INITIATING ACTION: as public necessity on walk. This order was initiated by the Director of Public Works the basis of two (2J complaints and an inspection of the EXISTING CONDITIOPIS: This walk is poured concrete with tree heaves, water pockets, asphalt patches, scaled, settled and cracked panels. ................................................................... PROJECT• CONSTRUCT & REGONSTRUCT SIDEWALK B.S. E. ROSE AVE. from Nokomis Ave. to Edgewater Blvd. 5�',12 INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of nine (9) complaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, disintegrated, scaled, settled and cracked panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATIONS Ward 7 P12QJECT• RECONSTRI3CT SIDEWAT.K B.S. FALCdN AVE. form S. Winthrop St. to S. McKnight Rd. °tY ��`�� jgQ(}�C, INITIATING ACTION: This order was uZitiated by the Director of Public Works � � �vIJ as public necessity on the basis of eleven (11) complaints two (2J petitions with one (lJ signer and an inspection of the walk. EXISTING CONDITIONS: TYus walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. ................................................................... PROJECT: RECONSTRUCT SIDEWALS W.S. N. MCKNIGHT RD. from E. Seventh St. to Stillwater Ave. � � (IV NQ INITIATING ACTION: as public necessity on walk. This order was initiated by the Director of Fublic Works the basis of two (2) complaints and an inspection of the EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, disintegrated, scaled, settled and cracked panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATION aY���� Ward 7 PROJECT• RECONSTRUCT SIDEWALH W.S. N. WHIT'E BEAR AVE. from Beech St. to E. Minnehaha Ave. 5�' O� INITIATING ACTION: This order was iuritiated by the Director of Public Works as public necessity on the basis of a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, scaled, settled and cracked panels. ................................................................... SUMMARY OF ENGINEERING RECOMMENDATIOIVS Ward 7 � PROJECT• RECONSTRUCT SIDEWALK E,S. CYPRESS ST. from E. Fourth St. to E. Fifth St. & W.S. CYPRESS ST. from Fremont Ave. to E. Fifth St. SG� � �� INITIATING ACTION: d � U as public necessity on the walk. This order was initiated by the Director of Public Works the basis of a one fl) complaint and an inspection of EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. ................................................................... PROJECT• RECQNSTRUCT SIDEWALK N.S. UPPER AF"TON RD. from Kennard Ct. to Flandrau Pl. S QI�"� INITIATING ACTION: This order was initiated by the Director of Public Works � �� as public necessity on the basis of one (lj complaint, a petition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: 'This walk is poured concrete with tree heaves, asphalt patches, settled and cracked panels. ................................................................... �k 3 : CITY OF ST. PAUI. PRELIMINARY ORDER OR�G�N��UNC LE NO. g8_Gn�_ � BY �%�y��i,�,G���i File No. 598085-598108 & 59811�-598132 Voting Ward 1,2,3,4,5,6,7 In the Matter o£ sidewalk reconstruction at the following locations: (See attached Exhibit A) *ESTIMATED CONSTRUCTION RATES RESIDENTIAL RATES (One, two or three family structures} Reconstruction (replacement of old sidewalk) -$7.65 per front foot for a five (5) foot wide walk and 59.18 per front foot £or a six (6) foot wide walk. All other widths will be prorated accordingly. New construction (where no walk existed) - 100$ of the actual cost estimated to be approximately $3.42 per square £oot. All corner residential properties will receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abuttinq the "long side" of the property. MULTI-RESIDENTIAL(More than three family structures�, NON-RESIDENTIAL RATES For new and reconstructed sidewalk; 100$ of actual cost estimated to be approximately $4.62 per square foot. The Council of the City of Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: 1 2 3 That the said report and the same is hereby approved with no alternatives, and that the estimated cost thereof is *SEE ABOVE for estimated construction rates, financed by assessments and 1998 Public Improvement Aid. That a public hearing be had on said improvement on the 12th of Auaust, 1998 at 5:30 o'clack P,.M., in the Council Chambezs of the City Ha11 and Court House Buildinq in��the City o£ Saint Paul. That notice of said public hearing be given to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cost thereof as estimated. COUNCILPERSONS Yeas Nays � enanav �lakey �/$ostrom �oleman ,/�arris � ntry �iter �In Favor � Against Adopted by Council: Date����1��� Certified Passed by Council Secretary gy � \ _ � J. � 1--�.�,, � v �+.- Mayor