98-469cx� oF sm. PAVt, -
FINAI, ORDER
ORlG1NAL
In the Matter of
�ro _
BY ��y�;�"L�l-'�
File No._597104,
Voting Ward_6&7.
-
597105
597104 - Construct curb on the north side of E Wheelock Pkwy at 1445
Arcade St only.
597105 - Sidewalk reconstruction on both sides Earl St from Thorn St to
Mounds Blvd.
*ESTIMATED CONSTRUCTION RATES
�f9
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$7.45 per front foot for a five (5)
foot wide walk and $8.94 per front foot for a six (6) foot wide
walk. All other widths will be prorated accordingly. New construction
(where no walk existed) - 100� of the actual cost estimated to be
approximately $3.33 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL (More than three family structures), NON RESIDENTIAL RATES
For new and reconstructed sidewalk; 100% o£ actual cost estimated to be
approximately $4.50 per square foot.
under Preliminary order l A ° a � approved �� �°� �'
.���.
The Council of the City of Saint Paul has conducted a public hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RE50LVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSONS
Yeas� Nays
Benanav
✓Blakey
Bostrom — ��Se��
� 1 eman
�rris
�try
Reiter — '��jse
� In F
�Agai
a �
Adopted by Council: Date1� \ 5�
\
Certified Passed by Council Secretary
or
Public Hearing Date – May
�ARTME /OFFICFJ60UNCtl.
iblic Works Sidewalks
NTACT PERSON 8 PHONE
f�TC . ISSIC -ZSS-6�2�
STBEONCOUNCILAGENDABY(DA'f� (}_$_
ust be in Council Researc
y Fridav 3-27-98
fALtOFSIGNANREPAGES _ 1
27, 1998 ' RE 3-20-98 q� �{`ti
°"'�'"`�'"'�° GREEN SHEET (�NO. �g�?-
�-2-98 , +.- ...._... �.u—
DEPAqT/AENTDIflECTOP UCT'COUNCIL_
N �PoR CITYATfOfUJEY �CRVCLEHIC
��� BUDGETDIFECTOR �FIN.BMGT.SEflVIGES
7.Ce � �MAYOfl(OflASSISTANn 7❑('q�fi(j� F
_ ICLP ALL. LOCA710q5 HM SIGNANR� n�s�w� r�,�M� �
Construct Curb & Reconstruc[ Sidewalk in Wards 6& 7(See attached list)
F11.� #�5
PLANNING COMMISSION
CIB COMMRTEE
STAFF
_ CNIL SERVICE CDMMISSION
JIVli1L ry
COUNCIL OBJECTIVE�
�—
PERSONpI SERVICE CONTRbCTS YUST ANSWER THE FOLLOWING QUESTIONS:
t. Has this pers NOer vrorked u(Wer a contracc fa this deparmient?
YE
2. Has this perswUfirtn ever been a c@y emPloyee?
YES NO
3. Does Mis personNirm possess a skill not nom�aly possessed by any current ary
employee?
YES NO
Explain all yas answers on separete sheet and attaeh to green sheet
ITIATING P�JBLEM, ISSUE.OPPORNNITV (WHO. WHAT, WHEN, WHEFiE. WFiY):
The probiem "defective sidewalk' was created because of tree roots, deleterious subgrade material, alternating freefthaw cycles,
service life limi[s, chemical additives, e�ctreme temperature variations, etc. These problems occur on a citywide level end must be
addressed and corrected on an annual basis. Left uncorrected, the sidewalk cond'Rion would worsen to a state where it would be
rendered unusable and subjed to increased pedestrian injuries from falls and possible I'digations.
ADVAN'fAGES iF
The community wi116enefit from this project because it will provide safe detect free sidewalks for fts many citizens. The sidewalk
contracts are executed by private contractors, so it tollows that private sector jobs aze created as a resuH of this activity.
��„'.�4s+?€:ti �`^
�.:. �:��: �,z k,i
Historically, the sidewalk reconstructions have created negative feedback in the area of construc[ion procedure and assessment.
Simply stated, property owners detest assessments, and despfle ihe fact up to one-haff the assessmant is City subsidized, ft siill
remains controversiaL 4 _ ,. . .__--
DISADVANTAGES IF NOT APPROVED:
This option would allow the infrastructure of sidewalk stock to deieriorate, which in turn, will generate more personal injury su0s,
ultimately resulting in the expendit�re of larger dollar amounts in eventual repairs and/or replacement, as well as claim payouts.
FUNDI4IGSOURCE 7J"P1
FINAI3CIAL INFOqMATION: (EXPII�IN)
S
t5 HS 1p �; � y—/ = SUU
C. {�.!`i+ J/ ^ S�
COST/HEVENUE BUDGETED (CIRCLE ONE) `YE_5� NO
ACRVRYNUMBEH G97�2T729-0784-27012
Ward 6
PROJECT• CONSTRUCT CURB N.S. E. WHEELOCK PKWY. from Weide St.
to Arcade St. at 1445 Arcade St. Only.
/ f� �� INITIATING ACTION: This order was izutiated by a request from the property
owner.
EXISTING CONDITIONS: This order is for first time construction of standard
curb.
..................................................................
9 r -�t c.q
-- SFBEVVL�LK O�ZH�R -- Januazy 2 1998
���'�� N.S. E. WF�ELOCK PKWY. from Weide St. to Arcade St. at 1445 Arcade St.
Only.
Ward 7
PROJECT• RECONSTRUCT SIDEWALH B.S. EARL ST. from Thom St. to
Mounds Blvd.
sq��O� INITIATING ACTION:
as public necessity on
walk.
This order was initiated by the Director of Public Works
the basis of one (1) complaint and an inspection of the
EXISTING CONDITIONS: This walk is old tile and poured concrete with
broken tile, holes and disintegrated panels.
...................................................................
�.�' -'�4q
SIDEWALK ORDER
Januazy 2,
�'O� B.S. EARL ST. from Thorn St. to Mounds Blvd.
CITY OF ST. PAUL
PRSLIMINARY ORDSR
In the Matter of
��-u�q
COUNC FILE NO. `� Vb\.��l�� �`
B1' -�?����! /il�-�' i
File No. 597104, 597105
Voting Ward�6&7
597104 - Construct curb on the north side of E Wheelock Pkwy at 1445
Arcade St only.
S97105 - Sidewalk reconstruction on both sides Earl St from Thorn St to
Mounds Blvd.
*ESTIMATED CONSTRUCTION RATES
12ESIDENTIAL RATES (One, two or three family structures)
Reconstzuctiosi (replacement of old sidewalk) -$7.45 per front foot for a
five (5) foot wide walk and $8.94 per front foot tor a six (6) Eoot wide
walk. All other widths will be prorated accordingly. New coastruction
(wlzere no walk existed) - 100� of the actual cost estimated to be
approximately $3.33 per square foot.
Al1 corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESSDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 100� of actual cost estimated to be
approximately $4.50 per square foot.
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
2.
3
That a public hearing be had on said improvement on the 27th day of May, 1998,
at 5:3p o'clock P.M., in the Council Chambers of the City Hall and Court House
Building in the City oE Saint Paui.
That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
✓Benanav
✓Blakey
e/Bostrom
�Coleman
vtfarris
�antry
,�Reiter
Adopted by Council: Date�,�
Certified Passed by Council Secretary
BY �, � � \.-. ,
.
Mayo�
1
That the said report and the same is hereby approved with no alternatives,
and that the estimated cost thereof is *SEE ABOVE for estimated construction
rates, £inanced by assessments and 1997 Public Improvement Aid.
� In Favor
�Against
cx� oF sm. PAVt, -
FINAI, ORDER
ORlG1NAL
In the Matter of
�ro _
BY ��y�;�"L�l-'�
File No._597104,
Voting Ward_6&7.
-
597105
597104 - Construct curb on the north side of E Wheelock Pkwy at 1445
Arcade St only.
597105 - Sidewalk reconstruction on both sides Earl St from Thorn St to
Mounds Blvd.
*ESTIMATED CONSTRUCTION RATES
�f9
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$7.45 per front foot for a five (5)
foot wide walk and $8.94 per front foot for a six (6) foot wide
walk. All other widths will be prorated accordingly. New construction
(where no walk existed) - 100� of the actual cost estimated to be
approximately $3.33 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL (More than three family structures), NON RESIDENTIAL RATES
For new and reconstructed sidewalk; 100% o£ actual cost estimated to be
approximately $4.50 per square foot.
under Preliminary order l A ° a � approved �� �°� �'
.���.
The Council of the City of Saint Paul has conducted a public hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RE50LVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSONS
Yeas� Nays
Benanav
✓Blakey
Bostrom — ��Se��
� 1 eman
�rris
�try
Reiter — '��jse
� In F
�Agai
a �
Adopted by Council: Date1� \ 5�
\
Certified Passed by Council Secretary
or
Public Hearing Date – May
�ARTME /OFFICFJ60UNCtl.
iblic Works Sidewalks
NTACT PERSON 8 PHONE
f�TC . ISSIC -ZSS-6�2�
STBEONCOUNCILAGENDABY(DA'f� (}_$_
ust be in Council Researc
y Fridav 3-27-98
fALtOFSIGNANREPAGES _ 1
27, 1998 ' RE 3-20-98 q� �{`ti
°"'�'"`�'"'�° GREEN SHEET (�NO. �g�?-
�-2-98 , +.- ...._... �.u—
DEPAqT/AENTDIflECTOP UCT'COUNCIL_
N �PoR CITYATfOfUJEY �CRVCLEHIC
��� BUDGETDIFECTOR �FIN.BMGT.SEflVIGES
7.Ce � �MAYOfl(OflASSISTANn 7❑('q�fi(j� F
_ ICLP ALL. LOCA710q5 HM SIGNANR� n�s�w� r�,�M� �
Construct Curb & Reconstruc[ Sidewalk in Wards 6& 7(See attached list)
F11.� #�5
PLANNING COMMISSION
CIB COMMRTEE
STAFF
_ CNIL SERVICE CDMMISSION
JIVli1L ry
COUNCIL OBJECTIVE�
�—
PERSONpI SERVICE CONTRbCTS YUST ANSWER THE FOLLOWING QUESTIONS:
t. Has this pers NOer vrorked u(Wer a contracc fa this deparmient?
YE
2. Has this perswUfirtn ever been a c@y emPloyee?
YES NO
3. Does Mis personNirm possess a skill not nom�aly possessed by any current ary
employee?
YES NO
Explain all yas answers on separete sheet and attaeh to green sheet
ITIATING P�JBLEM, ISSUE.OPPORNNITV (WHO. WHAT, WHEN, WHEFiE. WFiY):
The probiem "defective sidewalk' was created because of tree roots, deleterious subgrade material, alternating freefthaw cycles,
service life limi[s, chemical additives, e�ctreme temperature variations, etc. These problems occur on a citywide level end must be
addressed and corrected on an annual basis. Left uncorrected, the sidewalk cond'Rion would worsen to a state where it would be
rendered unusable and subjed to increased pedestrian injuries from falls and possible I'digations.
ADVAN'fAGES iF
The community wi116enefit from this project because it will provide safe detect free sidewalks for fts many citizens. The sidewalk
contracts are executed by private contractors, so it tollows that private sector jobs aze created as a resuH of this activity.
��„'.�4s+?€:ti �`^
�.:. �:��: �,z k,i
Historically, the sidewalk reconstructions have created negative feedback in the area of construc[ion procedure and assessment.
Simply stated, property owners detest assessments, and despfle ihe fact up to one-haff the assessmant is City subsidized, ft siill
remains controversiaL 4 _ ,. . .__--
DISADVANTAGES IF NOT APPROVED:
This option would allow the infrastructure of sidewalk stock to deieriorate, which in turn, will generate more personal injury su0s,
ultimately resulting in the expendit�re of larger dollar amounts in eventual repairs and/or replacement, as well as claim payouts.
FUNDI4IGSOURCE 7J"P1
FINAI3CIAL INFOqMATION: (EXPII�IN)
S
t5 HS 1p �; � y—/ = SUU
C. {�.!`i+ J/ ^ S�
COST/HEVENUE BUDGETED (CIRCLE ONE) `YE_5� NO
ACRVRYNUMBEH G97�2T729-0784-27012
Ward 6
PROJECT• CONSTRUCT CURB N.S. E. WHEELOCK PKWY. from Weide St.
to Arcade St. at 1445 Arcade St. Only.
/ f� �� INITIATING ACTION: This order was izutiated by a request from the property
owner.
EXISTING CONDITIONS: This order is for first time construction of standard
curb.
..................................................................
9 r -�t c.q
-- SFBEVVL�LK O�ZH�R -- Januazy 2 1998
���'�� N.S. E. WF�ELOCK PKWY. from Weide St. to Arcade St. at 1445 Arcade St.
Only.
Ward 7
PROJECT• RECONSTRUCT SIDEWALH B.S. EARL ST. from Thom St. to
Mounds Blvd.
sq��O� INITIATING ACTION:
as public necessity on
walk.
This order was initiated by the Director of Public Works
the basis of one (1) complaint and an inspection of the
EXISTING CONDITIONS: This walk is old tile and poured concrete with
broken tile, holes and disintegrated panels.
...................................................................
�.�' -'�4q
SIDEWALK ORDER
Januazy 2,
�'O� B.S. EARL ST. from Thorn St. to Mounds Blvd.
CITY OF ST. PAUL
PRSLIMINARY ORDSR
In the Matter of
��-u�q
COUNC FILE NO. `� Vb\.��l�� �`
B1' -�?����! /il�-�' i
File No. 597104, 597105
Voting Ward�6&7
597104 - Construct curb on the north side of E Wheelock Pkwy at 1445
Arcade St only.
S97105 - Sidewalk reconstruction on both sides Earl St from Thorn St to
Mounds Blvd.
*ESTIMATED CONSTRUCTION RATES
12ESIDENTIAL RATES (One, two or three family structures)
Reconstzuctiosi (replacement of old sidewalk) -$7.45 per front foot for a
five (5) foot wide walk and $8.94 per front foot tor a six (6) Eoot wide
walk. All other widths will be prorated accordingly. New coastruction
(wlzere no walk existed) - 100� of the actual cost estimated to be
approximately $3.33 per square foot.
Al1 corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESSDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 100� of actual cost estimated to be
approximately $4.50 per square foot.
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
2.
3
That a public hearing be had on said improvement on the 27th day of May, 1998,
at 5:3p o'clock P.M., in the Council Chambers of the City Hall and Court House
Building in the City oE Saint Paui.
That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
✓Benanav
✓Blakey
e/Bostrom
�Coleman
vtfarris
�antry
,�Reiter
Adopted by Council: Date�,�
Certified Passed by Council Secretary
BY �, � � \.-. ,
.
Mayo�
1
That the said report and the same is hereby approved with no alternatives,
and that the estimated cost thereof is *SEE ABOVE for estimated construction
rates, £inanced by assessments and 1997 Public Improvement Aid.
� In Favor
�Against
cx� oF sm. PAVt, -
FINAI, ORDER
ORlG1NAL
In the Matter of
�ro _
BY ��y�;�"L�l-'�
File No._597104,
Voting Ward_6&7.
-
597105
597104 - Construct curb on the north side of E Wheelock Pkwy at 1445
Arcade St only.
597105 - Sidewalk reconstruction on both sides Earl St from Thorn St to
Mounds Blvd.
*ESTIMATED CONSTRUCTION RATES
�f9
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$7.45 per front foot for a five (5)
foot wide walk and $8.94 per front foot for a six (6) foot wide
walk. All other widths will be prorated accordingly. New construction
(where no walk existed) - 100� of the actual cost estimated to be
approximately $3.33 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL (More than three family structures), NON RESIDENTIAL RATES
For new and reconstructed sidewalk; 100% o£ actual cost estimated to be
approximately $4.50 per square foot.
under Preliminary order l A ° a � approved �� �°� �'
.���.
The Council of the City of Saint Paul has conducted a public hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RE50LVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSONS
Yeas� Nays
Benanav
✓Blakey
Bostrom — ��Se��
� 1 eman
�rris
�try
Reiter — '��jse
� In F
�Agai
a �
Adopted by Council: Date1� \ 5�
\
Certified Passed by Council Secretary
or
Public Hearing Date – May
�ARTME /OFFICFJ60UNCtl.
iblic Works Sidewalks
NTACT PERSON 8 PHONE
f�TC . ISSIC -ZSS-6�2�
STBEONCOUNCILAGENDABY(DA'f� (}_$_
ust be in Council Researc
y Fridav 3-27-98
fALtOFSIGNANREPAGES _ 1
27, 1998 ' RE 3-20-98 q� �{`ti
°"'�'"`�'"'�° GREEN SHEET (�NO. �g�?-
�-2-98 , +.- ...._... �.u—
DEPAqT/AENTDIflECTOP UCT'COUNCIL_
N �PoR CITYATfOfUJEY �CRVCLEHIC
��� BUDGETDIFECTOR �FIN.BMGT.SEflVIGES
7.Ce � �MAYOfl(OflASSISTANn 7❑('q�fi(j� F
_ ICLP ALL. LOCA710q5 HM SIGNANR� n�s�w� r�,�M� �
Construct Curb & Reconstruc[ Sidewalk in Wards 6& 7(See attached list)
F11.� #�5
PLANNING COMMISSION
CIB COMMRTEE
STAFF
_ CNIL SERVICE CDMMISSION
JIVli1L ry
COUNCIL OBJECTIVE�
�—
PERSONpI SERVICE CONTRbCTS YUST ANSWER THE FOLLOWING QUESTIONS:
t. Has this pers NOer vrorked u(Wer a contracc fa this deparmient?
YE
2. Has this perswUfirtn ever been a c@y emPloyee?
YES NO
3. Does Mis personNirm possess a skill not nom�aly possessed by any current ary
employee?
YES NO
Explain all yas answers on separete sheet and attaeh to green sheet
ITIATING P�JBLEM, ISSUE.OPPORNNITV (WHO. WHAT, WHEN, WHEFiE. WFiY):
The probiem "defective sidewalk' was created because of tree roots, deleterious subgrade material, alternating freefthaw cycles,
service life limi[s, chemical additives, e�ctreme temperature variations, etc. These problems occur on a citywide level end must be
addressed and corrected on an annual basis. Left uncorrected, the sidewalk cond'Rion would worsen to a state where it would be
rendered unusable and subjed to increased pedestrian injuries from falls and possible I'digations.
ADVAN'fAGES iF
The community wi116enefit from this project because it will provide safe detect free sidewalks for fts many citizens. The sidewalk
contracts are executed by private contractors, so it tollows that private sector jobs aze created as a resuH of this activity.
��„'.�4s+?€:ti �`^
�.:. �:��: �,z k,i
Historically, the sidewalk reconstructions have created negative feedback in the area of construc[ion procedure and assessment.
Simply stated, property owners detest assessments, and despfle ihe fact up to one-haff the assessmant is City subsidized, ft siill
remains controversiaL 4 _ ,. . .__--
DISADVANTAGES IF NOT APPROVED:
This option would allow the infrastructure of sidewalk stock to deieriorate, which in turn, will generate more personal injury su0s,
ultimately resulting in the expendit�re of larger dollar amounts in eventual repairs and/or replacement, as well as claim payouts.
FUNDI4IGSOURCE 7J"P1
FINAI3CIAL INFOqMATION: (EXPII�IN)
S
t5 HS 1p �; � y—/ = SUU
C. {�.!`i+ J/ ^ S�
COST/HEVENUE BUDGETED (CIRCLE ONE) `YE_5� NO
ACRVRYNUMBEH G97�2T729-0784-27012
Ward 6
PROJECT• CONSTRUCT CURB N.S. E. WHEELOCK PKWY. from Weide St.
to Arcade St. at 1445 Arcade St. Only.
/ f� �� INITIATING ACTION: This order was izutiated by a request from the property
owner.
EXISTING CONDITIONS: This order is for first time construction of standard
curb.
..................................................................
9 r -�t c.q
-- SFBEVVL�LK O�ZH�R -- Januazy 2 1998
���'�� N.S. E. WF�ELOCK PKWY. from Weide St. to Arcade St. at 1445 Arcade St.
Only.
Ward 7
PROJECT• RECONSTRUCT SIDEWALH B.S. EARL ST. from Thom St. to
Mounds Blvd.
sq��O� INITIATING ACTION:
as public necessity on
walk.
This order was initiated by the Director of Public Works
the basis of one (1) complaint and an inspection of the
EXISTING CONDITIONS: This walk is old tile and poured concrete with
broken tile, holes and disintegrated panels.
...................................................................
�.�' -'�4q
SIDEWALK ORDER
Januazy 2,
�'O� B.S. EARL ST. from Thorn St. to Mounds Blvd.
CITY OF ST. PAUL
PRSLIMINARY ORDSR
In the Matter of
��-u�q
COUNC FILE NO. `� Vb\.��l�� �`
B1' -�?����! /il�-�' i
File No. 597104, 597105
Voting Ward�6&7
597104 - Construct curb on the north side of E Wheelock Pkwy at 1445
Arcade St only.
S97105 - Sidewalk reconstruction on both sides Earl St from Thorn St to
Mounds Blvd.
*ESTIMATED CONSTRUCTION RATES
12ESIDENTIAL RATES (One, two or three family structures)
Reconstzuctiosi (replacement of old sidewalk) -$7.45 per front foot for a
five (5) foot wide walk and $8.94 per front foot tor a six (6) Eoot wide
walk. All other widths will be prorated accordingly. New coastruction
(wlzere no walk existed) - 100� of the actual cost estimated to be
approximately $3.33 per square foot.
Al1 corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESSDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 100� of actual cost estimated to be
approximately $4.50 per square foot.
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
2.
3
That a public hearing be had on said improvement on the 27th day of May, 1998,
at 5:3p o'clock P.M., in the Council Chambers of the City Hall and Court House
Building in the City oE Saint Paui.
That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
✓Benanav
✓Blakey
e/Bostrom
�Coleman
vtfarris
�antry
,�Reiter
Adopted by Council: Date�,�
Certified Passed by Council Secretary
BY �, � � \.-. ,
.
Mayo�
1
That the said report and the same is hereby approved with no alternatives,
and that the estimated cost thereof is *SEE ABOVE for estimated construction
rates, £inanced by assessments and 1997 Public Improvement Aid.
� In Favor
�Against