Loading...
96-266q . . -�, � ` �.:4' � � CISY OF Si. 1'ABL FIHAL OBDEF t �� �� � � � 3 � � L� � COIIHCIL RILE_.BO:� �S� � 1 � � BY � ��` �����\ .�---� FILS HO. ` �-i 8 $j?i V02ZH6 BABD - 2 ' �___� In the Zfatter of improve Humboldt Avenue between George Street and Robie Street (City Project 96-P-1143) by grading, paving with bituminous, constructing concrete curb and gutter, driveway aprons, walks, placing topsoil and sodding boulevards, constructing storm water drainage structures, installing lantern stple street lighting and doing all other pork necessary to complete said improvement. underPreliminary0rder � � �-" �-J� approved i�•v�-„ �� The Council of the City of Saint Paul has eondnct a public ,hearing upon the above improvement, due notice thereof having been gi'ven as prescribed by the City Charter; and WAEREAS, The Council has heard all persons, objections and recommendations pertaining to said proposed improvement and has fully considered the same; now, therefore, be it RESOLVED, That the Gouncil of the City of Saint Paul does, hereby order that the above-described imptovement be made, and the proper City officers are hereby directed and authorized to proceed with the improvement; and be it FURTHER RESOLVED, That upon the completion of said improvement, the proper City' officers shall calculate all expenses incurred therein and shall report the same to the City Council in accordance with Chapter 14 of the City Charter. COUNCILPERSONS Yeas Nays ✓ Blakey �/ �aS jrdAz Guerin-�s�'� ,/ Harris � Megard � Rettman ,/ Thune �O In Favor �Again-S;t / fJ�SC�'/f' Adopted by Council: Dat Certifiad`f''asse By Secretary ayor Public Hearin Date - March 13 1996 RE 1-5-96 - D I W , PubficWorksDepartmeM 6/12/95 GREEN SHEET No.3'3565 INRINIDATE INRIAVDA'fE CONTACTPEflSON6PHONE DEPARTMEMDIRECTOR CfIVCWNCIL P8u1 St. MHrt)n 266-6118 P(� � �� � C17Y ATf�RNEY � crrr c�uc �� '�� MlSSOEONCWMCiLNGENDABV(DATE� — — AOU7iNG �9Up�EiDIRECTOA � FN.SMGT.SEAVICESDFL Must be in Council Research Off' e°"D� ���p no later than noon Frida 1-12-�� QbAVOR(OflA5515TM1T� � TOTAL # OF SIGNANR£ PAGES � (CL4P ALL LOCATIONS FOR SIGNATURE� � ACTpN qEOt�STED Ilmprove HUMBOLDT AVENUE between George Street and Robie Street (Gity Project 96-P-1143) By grading, pave with bitumirrous, construct concrete curb and gutter, driveway aprons and wafks, place topsoil and sod boulevards, construct storm water drainage stnu�ures, ', instail iantem style street lighting and do ali other woric necessary to com lete said i rovemerrt. File No. 18814 • RECOMMENDATIONS: Approve (A) a flejeC (R) pEpSONAL SEqY{CE COMAACSS MUST hliSWER THE WLLOWING �UESTIOlS: _PIANNIM9COMMISSqN _CMLSERYICECAIAMISSION y, HysthispersontfirmeverworketluMeracormactforihisdepafinenY? q8 COMMIiTEE YES NO A sra�F 2 Has this pYES Nfirm been a ciry employee2 o�sm�cT cou�ci�_ 3 3. Does this oNfi N possess a skill not nortnalty possed by arry cunen[ ciry employce? O SUPR7RTS WHICH COUNdL OBJECTIVE? Exp�ain all yes answers an sapa2ro sheat aMl attach to green shaet Neighborhoods Ward 2 INfT1ATING PROBLEM. 455UE. OPPORNNRY (NNO, WNAT. WHEN. NMERE, WHY): This project was initiated by a West Side citizen group funded by the 1996-1997 Capital Improvement Budget Process. ADVANTAGE5IFAPPpOVED: A newly rebuitt roadway, with new curb and gutter, will restore the drivability of this street and continue our eftorts to improve ihe street system in Sairn Pauf. This wili compiete the reconstruction of Humboidt Ave. north of George St. The new street lighting will also improve safety in the area. Normal problems associated with construction, such as noise, dust, and general disruption will occur. ��•�,c :'���w W��,-' �; [e°v E'� ev .;,.��.. The pavemerrt structure wi0 continue to deteriorate, maintenance costs wiU rise, and the levet of-serviee�rovided by this street wili drop. TOTAL AMOUM OF TRANSACTION E Y � 14,000 COST / REYEMUE BUDGETED (CHECK ONE) � NO FuNOiNCSOUrtcE MSA, qCTIVITYNUMBER FINANCIAL INFOFIMATION: (EXPLAIN) Summary of Engineering Recommendations Report Prepared - Dec. 6, 1995 Pubiic Hearing - PROJECT / � ��y 96- �� Improve HUMBOLDT AVENUE between George Street and Robie Street (City Project 96-P-1143) by grading, paving with bituminous, constructing concrete curb and gutter, driveway aprons, walks, placing topsoil and sodding boulevards, construciing storm water drainage structures, instaifing lantern style street lighting and doing all other work necessary to comQlete said improvement. INITIATING AGTION This project was initiated by a West Side citizen group funded by the 1996-1997 Capital improvemeni Budget Process. �XISTING CONDITIONS Humboldt Avenue is a paved street. It is 40' wide in a 80' R.O.W. This is the only biock north of George St. that has not been recently reconstructed. The south end of this block connects to a reconstructed George St. The existing roadway was constructed in 1931 as a concrete pavement. ft has since gone through a sewer trench restoration and asphalt overiays. Existing overhead lighting is mounted on wood poles. EXtSTING TRAFFlC GOUNTS: Robie St. to George St. - 3208 A.D.T. � According to MSA standards, Humboldt Avenue is classified as a Low Density Coliector street. PROPOSEDfMPROVEMENTS Following M.S.A. standards, it is proposed to construct Humbofdt Avenue at 38' with two side parking. This matches improved Humboidt to the north of Robie. The eniire lengih wili be regraded and constructed with a bituminous pavement, concrete curb and gutter, driveway aprons and outwalks. Topsoil and sod wil! be placed over regraded boulevards. Foliowing boulevard work, irees wilf be planted as needed. The proposed lighting system will consist of lantern style lighi standards. TIME SGHEDULE Work will begin in the spring of 1996 and be completed by middle to late summer of 1996 FUNDING � � �;: . - COST ESTIMATE Street Construction Engineering and Inspection Lighting Trees $ 80,000 17,000 15,000 2,000 TOTAL $114,000 ESTIMATED FINANCING Municipal State Aid Assessment $ 112,000 2,000 TOTAL RESIDENT ASSESSMENT $114,000 Residents affected wiil be assessed at the 1996 rats of $4.08 per assessabie foot for the lantern style lighting. � SOURCE OF ADDITIONAL INFORMATION For additional information, please contact the Project Engineer, Paul St. Martin at 266-6i18. RECOMMENDATION The Department of Public Works feels that this is a necessary and worthwhile project, and the Engineering Recommendation is for approvai of the project and financing. Respectfully submitted, Stacy Becker Director of Public Works E __._ � � J �, ��t ;I.', �j �r.,:}: �,. `' :. ro t— .� ��.___l � I_�"�l �� — 1 ,..,� HUM80�.DZ' P��lE. GEORGti. S't. '70 F�Q`�a1�, ST. P — l \43 ��� �.�!;.t: c" ��u►c.!!� ) ,. �/��!•.•'✓{�� ' l n �Y ��y � ��'WOOI �R (. _J C_ - \ .� �� wf< <o��oo j ,�,�� , ., � ` z� �. �.�«� EI o 5 ._'�� � � (.-_l I_l =� ..-,� ;�. �,a� � �t��[� f—�;� � `L.�"U [.� � � T � � � .', ., r �� f '.��� f� ❑ l'pJA1��H , . ( ( ( �et 1 I� t � i.__.1 _ � �e. i-1�-1 U C _l,i`^1 L�J L�7 f sT� u ,= `CE , c"� ❑ . �C�_���'di �, W=l[� � C �� �U �� t�"l C��l C �: � �-'t___1 L--I L'1 „u����„'J .� 5 r � i:'::....:. � _.. n �- , fT K 1 -i � ; :L'elt_..r J F� Y `T I � i. �� � r.-: : ��� _� �= � �� � �U� 1 U N �� �� �r Cl ��� � _� ❑ L; ��- � � N � . , � \ _''; 5 � i �� F E'� (�"1� �� � � � � ` �\ ,---, .� ,y r+a . e ''" • 'a � ,�os ,, 1� C O•� �� yni ��� i-- , .—. ua �� G17Y 0 ! F �'"� y: O i .. � �3 ` ia�F�� eftn b _€ II > � n C , � �854 � Saint Paul City Public Hearing Public Improvement OWI3ER OR TAXPAYER Council �� q �� a ,� Notice Construction COt3NCIL DISTRICT #2 PLANNING COUNCIL #03 _.._.._.,.. FILE # :18$i4" :`;:°�?:"=`: ;: PROPERTY ADDRESS PARCEL ID PROPERTY TAX DESCRIPTION THE TIME: WEDNESDAY, MARCH 73, 1996 A7 5:00 P.M. PUBLIC FLACE: City Council Chambers, 3rd F{oor City fiall-Court F{ouse HEARING Written or oral statements by any owner witl be considered by the Council at this hearing. PURPOSE ESTIMATED ASSESSMENT {NFORMATION ES7IMATED ASSESSMENT CALCULATION To consider approvai of the proposed project as foiiows: IMPRQVE HUMBOLDT AVENUE BETWEEN GEORGE S7REE7 AND ROBIE STREET. if the City Council approves the project, all or part of the cost wiii be assessed against the benefitted properties. The ESTIMATED assessment for the above property is $ NOTE: THIS IS NOT A B1LL! Please see PAYMENT INFORMATION on the reverse side of this notice. CONTINUED ON REVERSE SIDE .p - ��...,�a .c-.x ±..lf . :Y..r.a'�: �)9�s., _� �_., _ - _, _ .. _,.,_ � -,- - . _� r� �, ._.,� _� ��.<, NOTIFICATION DATE: 02/23l96 � FILE NO. 18814 !� � �a," � Improve HUMBOLDT AVENIIS between George Street and Robie Street by grading, paving with bituminous; constructing concrete curb, gutter, driveway aprons and walks; placing topsoil and sodding boulevards; constructing storm water drainage facilities; installing a lantern style street lighting system and doing all other work necessary to complete said improvement. Estimated Cost Estimated �'inancing - $114,00� Municipal State Aid - $112,000 Assessments (Lighting Only) - 2.000 Total $114,000 FILE NO. 18814-COI3N ($ 4.08 per assessable ft. ) The construction andJor repair of sanitary sewer, storm sewer and/or water service connections, if requested by the property owner, in conjunction with improvinq HUMBOLDT A4ENIIE between George street and Robie Street. G"" i?�E�S��:�tt)�E;? Connections will be assessed at cost: .,. : :. :.c%,;.;.::;.��.,: ��..;,si QUESTIONS? CONSTRUCTION - 266-61y8 ASSESSMENTS - 266-8850 �.u,� � �i -� 11 :i E GEDRGE h 4 . �_ ,o t•» � •c o 2� 9 C 9 O � —3 � 6 ��P —,-;. ' � , 4 � Q � _"-? - 06'->-� ��� �, �v S , w� 6 _ _;'__''✓£' i.re._._—_ - _ ... .. ro. : .�A, i' E-ST£VENS— so d (a°7 P'1 � �J i ` 1 � Dp Q>'s. e �L� ��:. _�� Q °' o � ° , � -,,, � , F K�a�i .4"� �s u ,ro. 0 F � H�tis • ro : CITY OF ST. PAUL PBSLI![IHAgY QEDES ( �E:I�����'f1�. a3 �35�� ac� � � � � � !L��.� j� j i � � ���.. 1� :., ir:: .� :� In the Hatter of improve Humboldt Avenue between George Street and Robie Street (City Project 96-P-1143) by grading, paving with bituminous, constructing concrete curh and gutter, driveway aprons, walks, placing Copsoil and sodding boulevards, constructing storm water drainage structures, installing lantern style street lighting and doing all other work necessary to complete said improvemen[. The Council of the City o£ Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: i. That the said report and the same is herehy approved with no alternat3ves, and that the estimated cost thereof is $11U,000 financed by Municipal State Aid $112,�00 and Assessment $2,000. 2. That a public hearing be had on said improvement on the 13th� day of March, 1996, at 3:30 o'clock P.M., in the Council Chambers of the City Hall and Court Hause Building in the Citp of Saint Paul. 3. That notice of said the manner provided hearing, the nature as estimated. C011NCILPERSONS Yeas Nays flakey ✓Cjosrno r�t ✓Guerin I�arris - �b'�^''� ✓� gard ✓Rettman �une public hearing be given to by the Charter, stating the of the improvement and the (p In Favor C> Against � 1A- bs � �-t- .�— the persons and in time and place of eotal cosC thereof Adopted by Council: Date Certified Passed by CouncilSecretarp ay Mayor