95-642—• � ' • 'it
� � � � � � � � Green Sheet 1�31569 �� j
CISY OF SS� PAIIL COIINC� IL-FFLE pIO. ��o��
FIHAL OffDSg By +"����� �%' �� ���(� �'f
File No. 595034
Voting Ward 3
In the Hatter of Sidevalk reconstruction at the folloc�*ing location(s):
on south side Munster Avenue from Davern Street to West Seventh Street.
*ESTIMATED CONSTRUCTION RATES
RESZDENTZAL RATES (One, two or three family structures)
Beeonstrnction (replacement of old sidewalk) —$7.04 per front foot for a
five (5) foot wide walk and $8.46 per Pront foot for a sig (6) foot wide
walk. All other widths will be prorated accordingiy. Hev coastrnction
(where no walk egisted) — 100% of the actual cost estimated to be
approxiiaately $3.15 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI—RESIDENTIAL (More than three family structures), NON RESIDENTIAL RATES
Eor new and reconstructed sidewalk; 100Y of actual cost estimated to be
approximately $4.25 per square foot.
under Preliminary order q 5 — � � � approved �.�,�� � � , � � ��
The Couneil of the City of Saint Paul has conducted a pnblic hearing
upon the above improvement, due notice thereof having been given as
prescribed by the City Charter; and
WHEREAS, The Council has heard all persons, ohjections and
recommendations pertaining to said proposed improvement and has fully
considered the same; now, therefore, be it
RESOL4ED, That the Council of the City of Saint Paul does hereby order
that the above—described improvement be made, and the proper City officers
are hereby directed and authorized to groceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the
proper City officers shall calculate all expenses incnrred therein and shall
report the same to the City Council in accordance with Chapter 14 of the City
Charter.
COUNCILPERSONS
Yeas /' Nays
✓ akey
VHarris
Megard
i/ ttman
�une
Adopted by Council: Date_�� ' S
(��pser� {—
Certified Passed by CouncilSecretary
✓�In Favor
O Against
i {�bs�.-c��'
� ..� . � � ����■
�� ,a'J!'d�, ��
�
.,
Public Hearing Date - June 14, 1995 RE 4-7-95 ��3156���
`DEPAR7MEM/OFFICE/COUNCiI DAlEINRIATEO GREEN SHEET �r,o.
Public Works Sidewalks 3-23'9$ INITIAVDATE INITINNATE
COMACT PEqSIXJ g PHONE � pEpppTMEM DIREC70R CIT' COUNCIL
Thamas P. Keefe - 266-&121 �N cm nrrowaer cm c�wc
MUSTBEONCOUNCILACENDABY(DA"fk� 4 p��n�� �BUDGEfDIqECTOR �FIN.BMGT.SERVICESDIR.
Aiust be in Council Research Office � MAYOfl(OflASSISTANn 10Counai Research
no later than noon Frida 4-14-95 �
TOTAL / OF SIGNIINRE PAGES 1 _(qJP ALL LOCAiIOII+ FOR SIGW1Nflq � ASSOCIA7E � DEPAHTM AL P�WUNTANT
ACTION flEIX1ESiED � ��
Reconstruct Sidewalk in Ward 3(See attached list)
File No. 595034
FiEWMMENDp71oNS; pppme (a w Rejeq (q� pEpgpNp� gERVICE CONTRAC'B YU3T ANSWER THE FOLLOWING WESTIONS:
PLANNING COMAIISSION _CNIL SERVK;E WMMISSION 1. Has rtlis pefsonfirm ever worked under a contract for ihk depWnent?
CIBCOMMItTEE YES NO
— — 2. Has Mis pefsonRrtn ever been a city employee?
A STAFF _ YES NO
DiS7PICT CWNCIL — LS 3. Does this personffirm possess a skill rwt normally possessed by any current ary
— — employee?
SUPPoRTS WHICH CIX7NCIL OB.IECTNE? yES NO
ExpWin al� yas enswers on separete sheet and attach to gleen sheel
Neighborhoods Ward 3
INITIATING PppqLEM, ISSUE, OPPOflTUNffY (WHO, WHAT, WHEN, WHERE. WH1�:
The problem "defective sidewalk" was created because of tree roots, deleterious subgrade material, akernating freetthaw cycles,
service I'rfe limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide level and must be
addressed and corrected on an annual basis. Left uncorrected, the sidewalk condRion would worsen to a state where it would be
rendered unusable and subject to increased pedestrian injuries from falls and possible litigations.
ADVANTAGES IF APPROVED:
The crommunity will benefit from this projed because it wiil provide safe detect free sidewalks for its many citizens. The sidewalk
contracts are executed by ptivate contractors, so it follows that private sector jobs are aeated as a resuR of this activity.
�S>,..r� �., ��"_�,y��j="e 9 6�s�ii��
5-a�.a '�.`+�. 6�.7'w�r
DISADVANTAGES IF APPROVED:
Historically, the sidewalk reconstructions have created negative feedback in the area of construction pracedure'attd"a's58� ment.
Simply stated, property owners detest assessmeMs, and despite the fact up to one-half the assessment is City subsidized, it still
remains controversial.
DISADVANTAGES IG NO7 APPROVED:
This option would albw the infrastructure of sidewalk stodc to deteriorate, which in turn, will generate more personal injury suits,
uftimately resulting in the expenditure of larger doilar amounts in eventual repairs and/or replacement, as well as claim payouts.
TMALAMWNiOFTfiAN5ACf10N5 o,�]Z},OQ tbST/HEVENUEBUDGETED(CiRCLEONEj YES No
fUNDINGSOURCE °�-�1�0604 �, PPA 95 = 515,000 ACITVfTYNUMBER C9S^2T727�Q78?+-27010
FINANCIAL INFORMATION: (EXPLAIM B w AST =�+7 0, OOO
C, Ct6 95 = 50,OCQ
9����..
SUMMARY OF ENGINEERING RECOMMENDATION
Ward 3
S9S03y PROJECT: RECONSTRUCT SIDEWALK S.S.MUNSTER AVE. from Davern St.
to W. Seventh St.
INITIATING ACTION: This order was initiated by ths Director of Public Works as
pubiic necessity on the basis of one (1) complaint and an inspection of the waik.
EXISTING CONDITIONS: This walk is old tile and poured concrete with tree
heaves, holes in tile, asphait patches, scaled, settled and cracked panels.
.............................................................................................
LtSY OF
: xa � ,
�. � Z
o .- .�
,nuc[nnn ,
� l�[4 I:S III �
i 8 h ,�,
v, � 1 86� �
Saint Paul City
Public Hearing
Public Improvement
OWNER OR TAXPAYER
Council n
Notice
Construction 9S-G��--
COUNCIL DISTRICT N3
PLANNING COUNCIL #15
_ ......... . -
FILE # S95£�3�`=':: ; ;:; <
PROPERTY ADDRESS
PARCEL ID
PROPERTY TAX DESCRIPTION
-., � ... ;r8�
�^1:Yine1 �ynmW.'.s �a3�/i L
4jED".o-..K,Y �. _< -
'�i� F `e G.' ''��' �J�1J
le;Yi e
�� �c�
THE TIME: WEDNESDAY, JUNE 14, 1995 AT 3:30 P.M.
PU8L1C PLACE: City Councif Chambers, 3rd Floor City Half-Court House
HEARING Written or oral statements by any owner will be considered by
the Council at this hearing.
PURPOSE
ESTIMATED
ASSESSMENT
ItdFORMAT{ON
ESTIMATED
ASSESSMENT
CALCULATION
To consider approval of the proposed project as follows:
Reconstruction of sidewalk on south side MUNSTER AVENUE from Davern Street
to West Seventh Street.
If the City Council approves the project, all or part of ihe
cost will be assessed against the benefitted properties. The
ESTIMATED assessment for the above property is $;
THIS AMOUNT WILL NOT NEED TO BE PAID ALL AT ONE TIME!
Please see PAYMENT INFORMATION on the reverse side of this
notice and also the enclosure for additional project information.
CONTINUED ON REVERSE SIDE NOTIFICATION DATE: 05/26/95
�
9���
ESTI2�`�TED RAT£S
R£SZDENTZAL RATES (One, two or three family structures) -
Itec9ast�uc�ioii (replacenent of old sidewalk� -$7.04 per front foot
�.,.,:>::.�
for"""'a"��five (5) foot wide sidewalk and $8.46 per front foot for a
six (6) £oot wide sidewalk. All other widths will be prorated
accordingly. Ne�*�co3structioii (where no walk existed) - 100% of
the actual cost'`�est'iriatecl""to"'be approxinately $3.15 per square
foot.
All corner residential properties will receive a credit up to the
first 150 feet of new or reconstructed sidewalk along and abutting
the 7.ong: s°ide of the property.
MULTI-RESIDENTIAL (Nore than three family structures) and NONRESI-
DENTIAL RATES - For new and reconstructed sidewalk: 100% o£ the
actual cost estimzted to be zpproxinately $4.25 per square foot.
PLEASE NOTE: Reconstruction will be at the existing width. Public
t+'orks will reconstruct some existing side»alk that is 6 feet wide
down to 5 feet wide in all cases where this is practical. This
smaller width (5 feet) is to keep the assessment at the lowest
rate. If your walk is 6 feet wide and you znd your neighbors
prefer that width and are willing to accept the higher assessment
rate, please contact the Sidewalk Division at 266-6120 to request
,
your reference. A13�i"new,-�sidek*alks;: ..........w.,...__....,.......,., .. .:.::.:........_..........
,P ..:... .:........ �+ill€`_.b'e:>:oonstructed':':
,_ ..... ... .....:.
_ .....: ... ....:..:.....:..:::........:: ..
,......::.. ,... _...:.�..._ ...........:......:.._...:;r.:..... .,...._....,..............
.,,;.,.: .. _. <.,:. :
�i8e':F
.>,,:..,: ,.:>:.,.,..:,: _:.
.., _.. .<.
Sidekalk reconstruction nay consist of replacing £rom one panel to
all of the panels in front o£ your property. The EsTiMATED
ASSESSMENT CALCULATION on your notice shows the numbeY of feet to
be replaced. Fer cuestions regarding the construction and/or
reconstruction o£ your side�:alk, please call 266-6120.
ORlCI�lAL �� Q 6 `��
Cl2Y OF ST. PAIIL COUNCIL FIL$ N0. 7S� `.
PHELIliIHAEY O&DER By ���j��lQ� �vyu�
File No. 595034 3 J3(
Voting Ward 3
Zn the Matter of Sidewalk reconstruction at the following location(s):
on south side Munster Avenue from Davern Street to West Seventh Street.
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstraction (replacement of old sidewalk) -$7.04 per front foot for a
five (5) foot wide walk and $8.46 per front foot for a six (6) foot wide
walk. All other widths will be prorated accordingly. Hev constrnction
(where no walk existed) - 100% of the actual cost estimated to be
approximately $3.15 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 1007< of actual cost estimated to be
approximatelp $4.25 per square foot.
The Council of the City of Saint Pau1 having received the report of the Mayor
upon the above improvement, and having considered said report, hereby
resolves:
1. That the said report and the same is herebp approved with no
alternatives, and that the estimated cost thereo£ is *SEE ABOVE
for estimated construction rates, financed by assessments and
1995 Public Improvement Aid.
2. That a public hearing be had on said improvement on the 14th day
of June, 1995 , at 3:30 o'clock P.M., in the Council Chambers of
the City Hall and Court House Building in the City of Saint Paul.
3. That notice of said public hearing be given to the persons and in
the manner provided by the Charter, stating the time and place of
hearing, the nature of the improvement and Che total cost thereof
as estimated.
COUNCILPERSONS
Yeas/� Nays
�/ ,Blakey
�/�Grimm
/�Guerin
.//tiarris
��/t°legard
�✓/ Rettman
✓ Thune
Adopted by Council: Date���c
-�
Certified Passed by Council Secretary
�In Favor By p,�.,_.� � . �i��vyc.��
� Against —�
Mayor