CITY OF ST. PAIIL
FIHAL OBD$E
, .� 3?
OR1Gli��1L _ "u�` '
,�
_ �`, ,, �..
COIIHCIL FI�LS' ;H�. �✓""��� ��-
,�� �
BY �,
FZLE HO. 18786 ��i�
VOTIHG �AAgD 2
� ,-, �—
In the t[atter of The construction and/or repair o£ sanitary, storm sewer
andJ"or water service connections, if requested by the property owner, in
conjunction with improving Annapolis Street from Stickney Street to Concord
Street.
� \
underPreliminary0rder � � --�� � approved � �� � �
���
The Council of the City of Saint Paul has conducted a puhlic hearing
upon the above improvement, due notice thereof having been given as
prescribed by the City Charter; and
WHEREAS, The Council has heard all persons, ob�ections and
recommendations pertaining to said proposed improvement and has fully
considered the same; now, therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order
that the above-described improvement be made, and the proper City officers
are hereby directed and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the
proper City officers shall calculate all expenses incurred therein and shall
report the same to the City Council in accordance with Chapter 14 of the City
Charter.
CQUNCILPERSONS
Yeas /' Nays
i�� akey
✓C
��Gderin
S�FJ'�CLT1S
9% gBTd
��ttman
✓Thune
Adopted by Council: Date��1���
CertifiedPassed by Council Secretary
�In Favor By
� Against
Mayor
Luo11C
ic Works DepaAmeM
.CT PERSON 8 PHONE �
St. Martin 266-6118 �
TOTAL Y OF SIGNATUHE
RE 2-3-95
1 J20J95
GREEN SHEET
DEPAATIAENT DIRECTOfi
CITYATTOFWEY
BUWETO�FECTOfi
�MAYOR (OR f55�£TMl'n
ALL LOCA'S10NS FOR
3Ya3Y
� No.s�s
_J cm cowrcw �+
� CI7V CLERK
� FIN. S MGT. SERVICES DIR___
7l Coundl Research
DFPAFiTMEMAL ACCAUNTANT
Improve ANNAPOLIS STREET between Stickney Street and Concord Street (City Project 95-P-8097) by grading, paving
with bituminous, constructing concrete curb and gutter, driveway aprons, watks, piacing topsoii and sodding boutevards,
COf1StNCf1t19 SIO� SPwar �nctallino iantern cryiP srreer Tinhiina and doinq alt other work necessary to compfete said
PIANNINGCOMMISSIDN _CNILSEAVICECOMMISSION
sinr�
DiSTAICTCOUNCiI� 3
COUNCIL09JECTIVE?
Neighborhoods Ward 2
PERSONAL SEflVICE COMRACTS MUSTltNSWEFiTHE FOLLOWIN6 �UESTlONS:
1. Has Ciis perwNfirm evervroAced urWer a convact for Ihis departrnen[?
YES NO
Z Has this P YES �� NO� �n a dq employee?
3. Does �h� YES orvfi N possess a skill no[ normally possetl by any arrent ciry employee?
O
Explain ail yes answers on separete shaet and attaeh to green sheef
This improvement is part of a proposed Contract by the City of South St. Paul. lt is part of a larger combined sewer separation
and street paving proJeCt. In 1994 they approached the City of Sairrt Paui in order to obtain design approval and agreement
on cost sharing for the work to be done within Saint Paul (the North side of Annapotis). This has now been accomplished.
The project wili be advertised and the Contract will be let by the City of South St. Paul.
A newiy rebuiR roadway will improve the drivability of this street and continue our efforts to improve the street system in
Saint Paul. The new street Iighting wili aiso improve safety in the area.
Normat problems associated with consiruction, such as noise, dust, and generat disr�ption w�ll occur.
The City will tose this opportunity to successtul4y participate in a joirit eftoR to improve a border street.
TOTAL AMOUNT OF TpANSACSION S �iee� a7 .��� �����'���� � REVENUE BUOGEfED (CHECK ONE) {'E9 NO
Furroir�c souace �, ASSESSMENTS ACTiVITY NUMBER v
95 - 3��
Irrterdepartmerrtal Memorandum
CITY OF SAINT PAliL
:. R �
'�..-- \`tr•;r.�sS''H °� ... �
To: Nancy Anderson =�..�`'
Council Research
310 City Hall
From: ��`� I.rPeter White
�fti��� Valuation & Assessment Engineer
140 City Hall
Date: January 27, 1995
Subject: Publication of Notice of Public Hearing for
improving Annapolis Street and construction for
connections. Fi1e No.'s 1&785 and 18786
GSIi 29946 Improving Annapolis Street.
GSdF 34334 Construction for connections.
To comply with Minnesota State Statue, Chapter 429, the attached
Preliminary Order must be published twice/one week apart with
publication on `farch 11 and ;�tarch 1$, 1995.
City Clerk's office would need the signed Preliminary Order in
their office no later than Monday March 6, 1995.
If you have any questions, call me at 266-8850.
PW:kt
cc: Fran Swanson
� ,
q S �:���
Summary of Engineering Recommendations
Report Prepared - January 19, 1995
PROJECT
Improvs ANNAPOLIS STREET between Stickney Street and Concord Street {Gity Project
95-P-8097) by grading, paving with bituminous, constructing concrete curb and gutter,
driveway aprons, walks, pfacing topsoil and sodding boulevards, constructing storm sewer,
instailing lantern style street lighting and doing afl other work necessary to compiete said
improvement.
INITIATING ACTION
This improvement is part of a proposed Contract by the City of South St. Paul. It is part of a
iarger combined sewer separation and street paving project. in 1994 they approached the
City of Saint Paul in order to obtain design approval and agreement on cost sharing for the
work to be done within Saint Paul (the North side of Annapoiis). �his has now been
accomplished.
The pro�ect will be advertised and the Co�tract will be let try the City of South St. Paul.
EXISTING CONDITIONS
The existing street is an oiled street and driving surface is in poor condition. The entire Iength
is a 60 foot right-of-way. Existing overhead lighting is mounted on wood poles.
PROPOSEDiMPROVEMENTS
The entire fength of the project will be regraded and reconstructed with a fuff depth
bituminous pavement. New concrete curb and gutter, driveway aprons, and outwalks will be
constructed. Within the boulevard area, topsoii and sod wiN be placed.
After construction comp{etion, trees wi11 be planted in the boulevards where needed.
The proposed lighting system will consist of the lantern fight standards on the Saint Paul side
of the street. The City of South 5t. Paul does not light their streets, and is not interested in
doing so on Annapolis.
TIME SCHEDULE
Work will begin in early to mid-summer of 1995 and be comp(eted by freeze up in the fal4 of
1995.
1
FUNDING
3�y
95_
The estimated cost ot the work on Annapo{is is $193,000.00. Saint Paul's share of the cost
(work on the North side only) is:
Street Construction & Engineering
Lighting Construction & Engineering
TOTAL
$53,680
12.000
$65,680
Financing of Saint Paufs share of the cost +s:
Street Construction & Engineering:
C16
Assessment
$41,680
12,000
Lighting Construction & Engineering:
C18
Assessment
TOTAL
RESIDENT ASSESSMENT
$10,000
2.000
$66,680
Residents affected wili be assessed at the 1995 rate of $22.51 per assessable foot for street
paving and $3.98 per assessable foot for the lantern style lighting.
SOURCE OF ADDITIONAL INFORMATION
For additiona� information, please contact the Project Engineer, Paul St. Martin at 266-6118.
RECOMMENDATION
The Department of Public Works feels thet this is a necessary and worthwhile project, and the
Engineering fiecommendation +s for approval of the project and financing.
Respecttully submitted,
Stacy Becker
Director ofi Public Works
�
. I';I ) � YS � .". - �:
— nr NC °,�
�i i� � i � � � � "
y. � '�:Z^� (� ._-_. �4«�:.v-
.:
� �\
t' ^ °� �' 1�=-{ —�— —� �� __,""=_;�
� —�
�Hi ��_K�A
Il � �
i ! � �, � ;
� � ('—^ �,� u r
� j-,r: ; �
� 1 � T, _�
�
� �9f..
3 i�171 :pi �
�P���,�, i
>, �_ m�_ ^.
_ ��1.�
� � >- � i�� I
L'��
� r r
i �� :: i, �, :
_--.----
W �� pLLVI
IDI
��� �\�
J �� ��
i �
-- �
^ .�+�i 3C'1F.=\.`.�
i s�.� _-°��••*.
I — . `;�
V�_.�C! � �
�: .w
n ��> `uy'' � �
� :�.� p!v�i�.��
a ' .: y' ur'�
>�' �". .�
=� I 4�v�s � i. �
ii 1 C��N.
'�
� � nNNa
�i _� I:-�P.� ,.� ,.. — ,�� , v - ; i qs "�S�c.�
.. ��� � ::�;� � .; �. � �
\ ,'.. -.� � ',`„� �� ��:
c ' . „ /•
.., �. ..�,,. -.,,,;± ;.,
� —r \ ' �_ — .., --- -
, �.� j \ . zer:
� �. � ' : s
� � . .� � - ���
.
" �; ���`�� �, .� ' , :� < i:
c s .. �
� Z. � 4� .. '� .. , r
\`�` YI �` �\ �5J". �
�\ 1`ti i �—� ^\\�\ '. . . �'�.'� ��:� L �
�'.�� L_ \�ti
K.. � y � 1 � �.
1-
Y L� � (' m `a
''}�` a � ' 1. I.�Y :\�, ��
' �� . � , °.�
�U 5 Y . . y T. � ..•_
�
�
P-S097
ANNAPOLIS ST. - STICK'VEY ST. Eo CONCORD ST
CITY OF ST. PAIIL
PRHLI2[IHAFY OYDEg
oR��jlvA�
In the Matter of The construction and/or repair of sanitary, storm sewer
and/or water service connections, if requested by the property owner, in
conjunction with improving Annapolis Street from Stickney Street to Concord
Street.
The Council of the City of Saint Paul having received the report of
the Mayor upon the above improvement, and having considered said report,
hereby resolves:
1. That the said report and the same is hereby approved with no
alternatives, and that the estimated cost thereof is per
connection assessed at the cost in effect at the time of
installation.
2. That a public hearing be had on said improvement on the 12th
day of April, 1995 , at 3:30 o'clock P.M., in the Council
Chambers of the City Hall and Court House Building in the Gity of
Saint Paul.
3. That notice of said
the manner provided
hearing, the nature
as estimated.
COUNCILPERSONS
Yeas Nays
�key
� mm
C'yderin
I�f,y�r r i s
✓I�gard
✓R�'ttman
(/Thune
public hearing be given to the persons and in
by the Charter, stating the time and place of
of the improvement and the total cost thereof
�In Favor
�Against
Adopted by Council: Date�d�,���
CerCified Passed by Council Secretary
BY �_ a-�— C1 �� t!-,� !��C`–�
\ LJ
Mayor