Loading...
Buildertrend6/28/24, 12:37 PMBuildertrend Page 1 of 3https://buildertrend.net/app/share/LsMU8c1s-a0/LeadProposal/Print/sY3Rzc6r96Y Released by Z - Naomi Ortega on Jun 28, 2024 Released Cornerstone Concrete P.O. Box 428    •    Lake Elmo, MN 55042    •    Phone: 612-325-3742 Luis Iglesias - - Maplewood Phone: 612-325-2245 Your Estimate from Cornerstone Concrete is ready ! Hello Luis, It was a pleasure meeting with you, Thanks! Please review your estimate below. Please do not reply directly to this email. Feel free to contact me if you have any questions at kyle@cornerstoneconcretellc.com.  We look forward to working with you Sincerely, Kyle Lecy Cornerstone Concrete, LLC 612-325-3742 Job Address: 1892 Hawthorn Avenue East Maplewood, MN 55119 Print Date: 6-28-2024 6/28/24, 12:37 PMBuildertrend Page 2 of 3https://buildertrend.net/app/share/LsMU8c1s-a0/LeadProposal/Print/sY3Rzc6r96Y If you would like to move forward with your project, click "approve" and sign the estimate. The pricing on this estimate is guaranteed for 30 days. Once the estimate is signed you will receive an email with the next steps. If you have any questions please don't hesitate to call us at 612-325- 3742. We hope to have the privilege of working with you. To move forward with your projecrt a 50% down payment is due upon signing. Checks should be made payable to Cornerstone Concrete LLC and sent to PO Box 428, Lake Elmo, MN 55042. The balance is due the day the concrete is CUT. We charge a late fee of 1.5% interest per month on all past due invoices.  A 3% surcharge will be added to all credit card payments. Cancelation of this contract will result in a $1,000 cancelation fee. Any down payment, less the $1,000 cancelation fee, credit card surcharges, and financing fees will be refunded.  Below is a summary of the customers responsibilities under the Terms and Conditions. Please check your email for the full Terms and Conditions.         1. Mark all sprinkler heads. IF your project includes an extension, please move all sprinkler heads AND lines out of the extension area. Cornerstone is not liable for damage done to ANY underground infrastructure.          2. Provide access to an electrical outlet and garden hose.         3. Concrete trucks require 14' of overhead clearance, and our employees will need 2' of walking and working space on each side of the driveway.          4. Note where the old slab goes under existing brick, stone, veneer, and siding. Cornerstone is not liable for damage done to buildings when removing old slabs that were poured under the    siding or into the foundation.          5. Plan to be home during the "Set Up" and forming day.         6. On projects that require multiple concrete trucks, there may be a slight variance in color.          7. Clean up any dirt and debris smaller than a quarter.          8 Adjust the yard and landscaping to the height of the new driveway.   Items Description Qty/Unit Unit Price Price Driveway tear out & replace The existing driveway will be removed and disposed of properly. We will pour new concrete at 4" thick and will use a 4500# concrete mix design. The entire slab will be fiber reinforced. The concrete will be cured with e5 internal cure and seal. This additive makes your driveway chemical and maintenance free for the life of the concrete. 1-3 days after the pour we will sawcut control joints. Individual sections shall not exceed 6' x 6'. Crack preventive steps are crucial in placing concrete. With the expansion cut guidelines that we have in place, it has made Cornerstone Concrete in a league of its own in controlling cracks. 371 $28.00 $10,388.00 Heads up If Luis chooses to move forward with replacing the curb, add $1,800.00 to the total 0 $0.00 $0.00 Recycled Base Being we cannot see the sub-soil before tear out we are unable to pre- determine if and how much base will be required for your job. If we find that the soil is below industry standard (2-4 inches), or if we need to set your new driveway to the correct elevation, it may require additional base to be brought in. Included in this estimate is 8 tons of base. Any additional base will be priced at $50/ton. If your entire project needs to be rebased (above the 8 tons of base) this will cost you an extra $500.00. Once the driveway has been torn out, it is not uncommon to uncover garage foundation issues. We will repair the garage foundation issues at a charge of $300/yard of concrete plus $75/man hour. 10 $0.00 $0.00 Total Price :$10,388.00 6/28/24, 12:37 PMBuildertrend Page 3 of 3https://buildertrend.net/app/share/LsMU8c1s-a0/LeadProposal/Print/sY3Rzc6r96Y NOTICE OF MECHANIC’S LIEN PURSUANT TO MINNESOTA STATUTE § 514.011 SUBD. 1 (A) ANY PERSON OR COMPANY SUPPLYING LABOR OR MATERIALS FOR THIS IMPROVEMENT TO YOUR PROPERTY MAY FILE A LIEN AGAINST YOUR PROPERTY IF THAT PERSON OR COMPANY IS NOT PAID FOR THE CONTRIBUTIONS. (B) UNDER MINNESOTA LAW, YOU HAVE THE RIGHT TO PAY PERSONS WHO SUPPLIED LABOR OR MATERIALS FOR THIS IMPROVEMENT DIRECTLY AND DEDUCT THIS AMOUNT FROM OUR CONTRACT PRICE, OR WITHHOLD THE AMOUNTS DUE THEM FROM US UNTIL 120 DAYS AFTER COMPLETION OF THE IMPROVEMENT UNLESS WE GIVE YOU A LIEN WAIVER SIGNED BY PERSONS WHO SUPPLIED ANY LABOR OR MATERIAL FOR THE IMPROVEMENT AND WHO GAVE YOU TIMELY NOTICE.  MECHANIC LIENS WILL INCUR 8% INTEREST PENALTY ON ALL UNPAID AND PAST DUE BALANCES. I confirm that I have read and understand the separate Terms and Conditions, Warranty, and Estimate. I confirm that my action here represents my electronic signature and is binding.  I confirm that my action here represents my electronic signature and is binding. Signature: Date: Print Name: