CONTRACT CHANGE AGREEMENT NO. 5 (CO #87, 104 & 107)
ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described
as furnish all materials, equipment and snrvirec nnrectary or i_nri_dental for the
Drywall and Accoustical ceilings in the Town Square Segment B Project ,
known as Contract L- $284-2&y Project No. 8367S , FROGNER CUSTOM DRYWALL CO. ,
Contractor, is composed of the following:
87. Remove all existing drywall framing and replace with ventwood at Skyway Level Mall
"T" line. Revise telephone mounting hts per Report of Contract #92 $2,937.
104. Provide and install walls for pantry, audio and dressing rooms. $2,440.
107. Provide and install drywall at Hotel interface, Park office, Drivethru stairwell ,
Information Booth, and Loft Shower Room. $7,621 .
III
ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac-
cordance with the specifications in the sum of $ 12,998.00 , said amount to be added to the lump sum con-
sideration named in the contract, known as contract L- .8284-23 , and which amount is to be financed from:
BOND FUND Qia. F 66b `3
Cost of the above work is as per the attached Allocation Agreement
CITY COST $12,518 I 7 D —C-c — 5- 7— C> c.:`R
OXFORD COST . 480
$12,998
AP c
VED ''
S T t 0' /__ _, F( 19 V FROGN 4 CUS I M DR A VV
Assistant ity A' srney Contractor MIROM
i
io1- —
1/26 1981 BY /it�/1 �!/'_r ' a �� .
Co trac / Ads• 'n i strator �� �"
• . . . A _ I(2719 al S__at A a le, ‘'' iT4=jz:0.
1411 of Engineer Cif rchi f t ead of sep; tiieTrFinance
I /r,/ ♦ .i_60_
Di ec or of (0 `it Adm is'trative Assistant to the Mayor
OM 01: 12/1975
Rev. : 9/8/76
EXPLANATION OF ADMINISTRATIVE ORDERS,
RESOLUTIONS, AND ORDINANCESC
• Date: FEBRUARY 6, 1981
TO: MAYOR GEORGE LATIMER
FR: AL AMIOT - PED A�jA
RE: CONTRACT CHANGE AGREEMENT FOR TWON SQUARE SEGMENT B
ACTION REQUESTED:
Approval of Contract Change Agreement No5 to Frogner Custom Drywall Co.
PURPOSE AND RATIONALE FOR THIS ACTION :
No.5 (co 87) The reason for this change was to allow access to various M & E
in the ceiling area.
(co 104) This change was needed to finish various spaces under the mounds
in the loft area. These rooms were not a part of the Original
Bid Documents.
(co 107) This work was necessary to finish off the area where the two projects
interface, as well as other minor areas throughout the project.