CONTRACT CHANGE AGREEMENT NO. 8 (C 0 #100)
ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described
as furnish all materials, equipment and services necessary or incidental for the
concrete and masonry work for the Town Square Segment B Project
,
known as Contract)L-84-8413 City Project No. 81955 PCL CONSTRUCTION, LTD.
Contractor, is composed of the following:
#100 This Change consists of sealing all exposed aggregate flooring in the Loft Level .
•
ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac-
cordance with the specifications in the sum of $ 11 ,499.00 , said amount to be added to the lump sum con-
sideration named in the contract, known as contract -3" and which amount is to be financed from:
46c/2 gam. i.i- 13
PIR Fund 6e6t0-'894 000
Cost for the above work is 100% City j-1 ,- 7o;Ze0-SS3 7 -003
i:l//
c ,,,, /
, ),—/919 / - C 00,v 7 I7O
,
Assistant City Att ney Contractor id"
A cv..,,,r _ 1/20 1981 By a f
Coptra Administrator - `� '
• IV —� 19 :`1 ifs- 9 ',mpg"'/ ft-
hief ngineer / - y A hitect •ead of I - .• - ';�rf� inance i
411116., � I6.,. 12 —19_L 1- _ iL"!tr/L,
Ai D ire tor off,15%J Administrative Assistant to the Mayor
OM 01: 12/1975
Rev. : 9/8/76
•
EXPLANATION OF ADMINISTRATIVE ORDERS,
RESOLUTIONS, AND ORDINANCES
• Date:FEBRUARY 6, 1981
TO: MAYOR GEORGE LATIMER
FR: AL AMIOT - PED Ws
RE: CONTRACT CHANGE AGREEMENTS FOR TOWN SQUARE SEGMENT B
ACTION REQUESTED:
Approval of Contract Change Agreements No. 8 & 9 for PCL Construction , Ltd.
•
PURPOSE AND RATIONALE FOR THIS ACTION:
Agreement No.8 The purpose of this work was to seal all exposed aggregate floor
surfaces in the loft area. This will protect the conrete from
damage of staining.
No.9 The purpose of this change was to construct concrete BLK planters
above the loft stair wells. This change created additional
landscape areas.