Loading...
D-5632 White - City Clerk No. 0 . 63-' Pink - Finance Dept. � f Canary - Delt. Accounting Date " T -� Blue ` -'Engineer Green - Contractor • CITY OF SAINT PAUL — OFFICE OF THE MAYOR ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEMENT NO. 2 ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described as Remodeling sixth floor, City Hall and Courthouse known as Contract)G-1425, City Project No. 77-62 , Gladstone Construction Co. Contractor, is composed of the following: 1 . Remodeled door and frame to mechanical equip. room Reverse swing and temp. Remove mech. room door. $ 1 ,001 .00 2. Refinish 3 doors 60.00 3. Access doors in ceiling in lobby 204.00 4. Electrical changes 513.00 5. Glass for office doors (6) 375.00 6. Door stops, closer and barrel bolts 219.00 7. Formica kick plates 67.00 8. Undercut existing floor _ 42.00 • 10% Profit and OH $ 2,481 .00 248.00 $ 2,729.00 ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac- cordance with the specifications in the sum of $ 2,729.00 , said amount to be added to the lump sum con- sideration named in the contract, known as contract L- -5— and which amount is to be financed from: d'3 d`' T ,Ramsey Co 1,364.50 09170 =- -6$96$-898-000 537-000 1,364.50 'ile.. 2,729.00 APPROVED AS TO FORM ��//� id� ------14— I/ Gladstone Construc -y f Contractor ' C / / 19 Bye attache.//%i .! : ... 't irchit LT ar.i i le, A, 7-0 6,Chief Engineer Head of De'-ayr ent of ' , ce 0? ,11 �. Dennis ,1Kj 19 r,i � J L_ Supt. City Hall and Court House Admin strative Assistant to the Mayor It • • • • • • • • OM 01: 12/1975 Rev. : 9/8/76 EXPLANATION OF ADMI'+vISTRATIVE ORDERS, RESOLUTIONS, AND ORDINANCES Date: January 5, 1981 .,. JAN 3 .1981 TO: MAYOR GEORGE LATIMER CV FR: Don McGinn RE: Remodeling Sixth Floor ACTION REQUESTED: Signature to Indicate Approval 1111 PURPOSE AND RATIONALE FOR THIS ACTION: 1 . Existing door was to small 2. , 5, 6 & 7. Glass required to bring salvaged doors into acceptable condition. 3 & 4. Provides access to previous concealed electrical junction boxes. 8. Required at existing door to operate with new carpet installed. ATTACHMENTS: Contractors proposal (copy) Contract Change No. 2 for signatures