Loading...
D-5625 White — City Clerk No. D C��^ Pink — Finance Dept. 0^ Canary — Dept. Accounting Date Blue — Engineer Green — Contractor • CITY OF SAINT PAUL — OFFICE OF THE MAYOR ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEMENT NO. 8 (CO #97) ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described as furnish all materials, equipment and services necessary, or incidental for the concrete and masonry work for the Town Square Segment B Project known as Contract IX 8484-Joiity Project No. 8195S , PCL Construction LTD. Contractor, is composed of the following: 97. Provide additional block to raise planters in loft level per Report of Contract #104 and form and pour curbs at loft level round ducts, form and pour base for sculpture at skyway level . • ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac- cordance with the specifications in the sum of $ 3,068.00 , said amount to be added to the lump sum con- sideration named in the contract, known as contract IX- 8484-13 , and which amount is to be financed from: 660/3 PIR Fund 446E6-894 000 Cost for the above work i s 100% City 7', .e ms P�.c%,•r,��l-� 0" c�..- 7 tk f c„cR ,, nn c C p-t., C( 7O 2 5 27 0`3 ED AS TO 0• 411 Co 7/ 19 D/ /1 sr. Assistant City A torney / Contractor �� t �L1 12/311980 By 'AL. 7 ' fROXIX Con ct Admin. • r Chief Engineer City Architect t� ► eHe • of epar ent of ce 19 Director of Adm istrative Assistant to the Mayor