Loading...
D9674 White --tOity Clerk No. D tI(of Pink* — Finance Dept. _Da - Qg Canary — Dept. Accounting Date dJ Blue — Engineer Green .- Contractor • A —7: "41---0 CITY OF SAINT PAUL — OFFICE OF THE MAYOR ADMINISTRATIVE ORDER FEB 2 - 1988 for CONTRACT CHANGE AGREEMENT NO. 1 DUD! !P SO S COST. � n,.y ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described as SEVENTH—FRANK SEWER SEPARATION known as ct EL- #29003, City Project No.87—S-8032 Park Construction Contractor, is composed of the following: This change agreement work consists of the following items: 1. Addition of Reaney Street from Earl to Frank 2. Widen and change design on Atlantic, E. Seventh to Railroad 3. Additional items through Addendum #1 4. Additional concrete removal and replacement throughout the project 5. Extra asphalt work at Seventh and Earl 6. Addition of 40 sewer service reconnections on Seventh between Earl and Johnson Parkway • (See Attachment "Cost Summary of Change Order #1) ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac- cordance with the specifications in the sum of $ 118,533.52 said amount to be added to the lump sum con- sideration named in the contract, known as RAcy #29003 , and which amount is to be financed from: 1987 CSSP Funding; no additional funding required. A�OVED AS TO FORM 2 — lO 19 )(14,k t Assistant ;ty Attorney Contractor u ��a2. 19 .6)8 By et p E ineer 7 Aari.644 19 • Hea of ep t - finance r Director of I Administrative Assistant to the Mayor (D(1jORIGINATOR DATE INITIATED DATE COMPLETED ( i Public Works 2/2/88 GREEN SHEET No.Q 0269 CONTACT PERSON =_