D2983 White - city clerk CITY O F SAINT PA u L Pink Finance Dept. Cana•{� Dept. { OFFICE OF THE MAYOR o p? No: ADMINISTRATIVE ORDER Date: SEP 3 . 1976 ADMINISTRATIVE ORDER, In the matter of that certain contract known as Contract No. L-7930 for WEST MIDWAY COMMUNITY DEVELOPMENT AREA YEAR 1 and RAYLESS-CROMWELL STORM SEWER, City Project Nos. 76-P-0629 and 76-5-01+60G3A, Acton Construction Company, Inc. , Contractor, the specified date of completion is August 1, 1976, and the Contractor did not complete the contract by said date of completion because time allotted under the contract was not sufficient to complete the work, and it is hereby ORDERED, That the City of Saint Paul, through its Mayor, extends the time of comple- tion to September 10, 1976, provided however, that this Order shall have no force or effect unless the sureties on the Contractor's bond consent thereto and file such consent in writing with the Head of the Finance Department of the City of Saint Paul; and it is FURTHER ORDERED, That the City of Saint Paul hereby waives all claim for liquidated damages and that no engineering and inspection costs on this project will be charged to the Contractor for such extended period. APPROVED AS S FO M s n i y ttorne TIPPrIment Head Jo ph �. Kdenig, Construction Ingineer (P.W. Ote ' 6' Administrative Assistant to Mayor JFK/gs, 8/24/76 ti ATTACHMENT TO • ADMINISTRATIVE ORDER FOR CONTRACT CHANGE AGREEMENT NO. 1 CHEROKEE-OTTAWA STORM SEWER SYSTEM, CONTRACT A City Project No. 76-S-1321A Contract No. L-7908 Contractor - Mueller Pipeliners, Inc. ADDITIONS: 1. Adjusted four existing sanitary sewer manhole castings which were below grade when the storm sewer trench was restored. Adjust manholes or catch basins 4 each @ $75.00 $300.00 2. Placed 50 cu. yds. of topsoil and seeded in lieu of sod. Topsoil in place 50 cu. yds. @ $ 6.50 325.00 3. Adjusted water gate valve, which was not included in the contract. Adjust gate valves in pavement area 1 each @ $60.00 60.00 4. Furnish and install frame and casting which was found • to be broken. Cost of casting + 25%. Casting in place $93.00 + 25% 116.25 5. Furnish 24" R.C. Arch pipe in lieu of 24" round pipe because of conflict with 12" H.P. gas main Material increase only 24 lin. ft. @ $ 5.04 = $120.96 + 15% = 18.14 139.10 6. Down time for conflict with 6" gas main which had elevation shown on the plans and showed no conflict with proposed sewer. Foreman 4 hrs. @ $10.80/hr. = $43.20 Backhoe Operator 4 hrs. @ 10.85/hr. = 43.40 Oiler 4 hrs. @ 9.65/hr. = 38.60 Dozer Operator 4 hrs. @ 10.63/hr. = 42.52 Pipe Layer 4 hrs. @ 9.35/hr. = 37.40 Pipe Layer Helper 4 hrs. @ 9-30/hr. = 37.20 $242.32 + 40% = 96.93 $339.25 Massey Ferguson 450 Backhoe 4 hrs. @ $11.50 = $46.00 Massey Ferguson 400 Dozer 4 hrs. @ 15.00 = 60.00 • Pickup Truck 4 hrs. @ 1.50 = 6.00 $112.00 451.25 - 1 - Attachment to Administrative Order for Contract Change Agreement No. 1 CHEROKEE-OTTAWA STORM SEWER SYSTEM, CONTRACT A • ADDITIONS (continued) 7. Down time for conflict with 12" H.P. gas main which had elevation shown on the plans, but the elevation was incorrect. Foreman 1 hr. @ $10.80/hr. _ $10.80 Backhoe Operator 1 hr. @ 10.85/hr. = 10.85 Oiler 1 hr. @ 9.65/hr. = 9.65 Dozer Operator 1 hr. @ 10.63/hr. = 10.63 Dozer Operator 1 hr. @ 10.63/hr. = 10.63 Pipe layer 1 hr. @ 9.35/hr. = 9.35 Pipe layer helper 1 hr. @ 9.30.hr. = 9.30 $71.21 + 40% = 28.48 $ 99.69 American 35 Backhoe 1 hr. @ $18.50/hr. _ $18.50 Massey Ferguson 400 Dozer 1 hr. @ 15.00/hr. = 15.00 Michigan 55 Dozer 1 hr. @ 15.00/hr. = 15.00 Pickup Truck 1 hr. @ 1.50/hr. = 1.50 $50.00 $ 50.00 $149.69 TOTAL ADDITIONS TO CONTRACT = $1,541 SUMMARY OF ADDITIONS: 1. Fixed Unit Price $300.00 2. Fixed Unit Price 325.00 3. Fixed Unit Price 60.00 4. Fixed Unit Price 116.25 5. Force Account Work 139.10 6. Force Account Work 451.25 7. Force Account Work 149.69 Total Additional Amount = $1,541. • - 2 -