D2855 White City Clerk No.
Pink - Finance Dept.
Canary - Dept. Accounting Date JUN 3 0 1976
Blue - Engineer- Construction
Green - Contractor
• CITY OF SAINT PAUL — OFFICE OF THE MAYOR
ADMINISTRATIVE ORDER
for
CONTRACT CHANGE AGREEMENT NO. 2
deduction
ADMINISTRATIVE ORDER, Whereas, sdd*1*m which proved to be necessary to the Improvement described
as KELLOGG BOULEVARD & ROBERT STRFXT BRIDGE REPAIRS & RESURFACING from Robert St. to
Cedar St.
known as Contract L-7R60 City Project No. 75-B-1o66 & 75-B-1060, Arnold Beckman, Inc.
Contractor, is composed of the following:
Surface scaling has occurred on structural walk constructed on the Robert Street bridge
under this contract. Independent tests have shown the walk to have adequate strength.
Because the surface has had an oil treatment, it is not practical for the contractor
to make durable surface repairs. Therefore the Public Works Construction Bureau and
the contractor have agreed on a 15% reduction in the contract bid price for Item No. 11.
Item 11 2401.501 Concrete Mix No. 3Y46A 42 cu. yds. @ $125.00 = $5,250.00
$5,250.00 x 15% = $787.50 Credit
•
ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing tion made in ac-
deducted from
cordance with the specifications in the sum of $ 787.50 said amount to be addwiph&the lump sum con-
sideration named in the contract, known as contract L-7860 was deducted 860 , and which amount from:
1953 Bond Funds.
APPRO D AS TO FOR
I I A"A M
19 kal101a MAN. INC.
Assist ttorn Contractor
197a
ngi er -ban Nic S tary-Treasurer
_ 19
Ch' f E gineer He4of ep rt en f n 19
Director of A ative Assistant to the Mayor