D2607 White - City Clerk No. 0 — �b V
Pink — Finance Dept. MAR 1 1976
Canary - Dept. Accounting Date
Blue - Engineer
Green - Contractor
• CITY OF SAINT PAUL - OFFICE OF THE MAYOR
ADMINISTRATIVE ORDER
for
CONTRACT CHANGE AGREEMENT NO. 1
ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described
as the RIVERVIEW PUMP STATION End of Starkey Street at Mississippi River
,
known as Contract L-7885 , City Project No. 75-S-15 1, Orvedahl Construction Company, Inc. ,
Contractor, is composed of the following:
Constructing the proposed electric hoisting system in the
station motor room as per revised plan sheet no. 3A of 4
instead of in the lower pump room as originally planned
(contract bid item B1) at the additional lump sum cost
of $1780.11.
ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac-
cordance with the specifications in the sum of,$ 1780.11 said amount to be added to the lump sum con-
sideration named in the contract, known as contract L-7885 , and which amount is to be financed from:
197+ P.I.A. Funds
APP VEDA TO FORM
J2J _ - 19 Orvedahl Construction, Inc.
A is a i o Contra t0,3Ht
�
19 •_,� By G
ngin
PRESIDENT
kX1 n2-L Engin r ea f m of Winance
19_6
Director of Administrative Assistant to the Mayor