D2584 White City Clerk No. D Fink s Finance Dept. FEB 19 1976 Canary — Dept. Accounting Date Blue — Engineer Green — Contractor • CITY OF SAINT PAUL — OFFICE OF THE MAYOR ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEMENT NO. i ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described as the Construction of the FLANDRAU—HOYT RELIEF SEWER SYSTEK known as Contract L- 7809 , City Project No. 75—s—i409C,C1,C2, Shafer Contracting Company, Igc. , Contractor, is composed of the following: ADDITIONS See Attachment for explanation. Item No. 1 $ 415.50 Item No. 2 482.14 Item No. 3 37.00 Item No. 4 376.22 Item No. 5 12.97 Item No. 6 2,175.55 Item No. 7 1,677.00 TOTAL NET ADDITION TO CONTRACT $5,176.38 ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac. cordance with the specifications in the sum of $5,17(1.38—, said amount to be added to the lump sum con- sideration named in the contract, known as contract L- 7809 , and which amount is to be financed from: Due to an underrun in the original contract quantities no additional financing is required. APPROVE S T FORM 19 A ant City for y Contractor f v� 1970 By L.J. r JChgi 19 Z —' Engin o R T 197 Director of Administrative Assistant to the Mayor JFK/gS Attachment to Administrative Order for Contract Change Agreement No. 1 • FLANDRAU-HOYT RELIEF SEWER SYSTEM City Project Nos. 75-S-1489C,C1,C2 Contract No. L-7809 Contractor Shafer Contracting CompnX, Inc. ADDITIONS: Item No. 1 Removing stumpy in the northwest area of the park. This removal was not covered in the plans. (Approximately 60 Stumps) Dates worked: 6/19/75, 6/24/75, 7/29/75 Rate/Hour Hours Extension Equipment Cat 966 Loader (Incl. Operator) $40.00 71-2 $300.00 Cat D6 Dozer it 11 37..00 01 92.50 Bobcat Loader it it 23.00 1 23.00 Total Equipment $; 415.50 TOTAL ITEM NO. 1 $ 415.50 Item No. 2 - Removing the remainder of the bulkhead in the 90" Reinforced Concrete Pipe at Kennard and Ivy Not covered in the plans. • Dates worked: - 7/29/75, 7/31/75 Labor Foreman (Includes Pickup) 11.43 3 34.29 Laborer 8.55 29 247.95 282.24 Plus 40% Overhead 112.90 Cost of Lahr 395.14 Equipment Single Axle Dump Truck 5.00 61-� 32.50 Compressor & Hammer 3.00 1133, 34.50 Trojan Loader (Incl. Operator) 40.00 ;5 20.00 Total Equipment 87.00 TOTAL ITEM NO. 2 482.14 Item No. 3 - Grading outside of grading limits, as shown on the plans, at the southeast corner of the holding pond to better match the original contract grading. Date worked: August 1, 1975 Equipment Cat D6 Dozer (Incl. Operator) 37.00 1 37.00 Total Equipment _ 37.00 TOTAL ITEM NO. 3 37.00 Flandrau-Hoyt Relief Sewer System page 2 Project Nos. 75-S-1489C,C1,G2 • ADDITIONS: (Continued) Item No. 4 - Constructing 3 additional drainage holes in the outlet structure at the SW corner of the pond. Dates worked: 8/6/75, 8/7/75 Rate/Hour Hours Extension Labor Laborers (2) 8.55 26 $222.30 Plus 40% Overhead 88.92 Cost of Labor $ 311.2-2 Equipment Compressor & Hammer 3.00 13 39.00 3" Homelite Pump 2.00 13 26.00 Total Equipment 65.00 TOTAL ITEM NO. 4 $ 376.22 Item No. 5 - Removing existing trash guard on the inlet pipe entering the ponding area. Date worked: August 8, 1975 Labor • Laborer (2) 8.55 1 8.55 Plus 40% Overhead 3.42 Cost of Labor 11.97 Equipment Saw 2.00 91, 1.00 Total Equipment 1.00 TOTAL ITEM NO. 5 12.97 Item No. 6 - Additional work on the west side of the park to prevent erosion caused by runoff from adjoining property. Dates worked: 9/4/75, 9/5/752 9/8/75 9/9/75 Labor Foreman (Including pickup) 11.43 18 205.74 Laborers (2) 8.55 57 487.35 693.09 Plus 40% Overhead 277.24 Cost of Labor - 970.33 Equipment Cat 930 Loader (Incl. Operator) 35.00 8!� 297.50 Ford Backhoe (Incl. Operator) 26.00 16 416.00 Tandem Dump Truck (Incl. Driver) 24.00 11 264.00 Total Equipment 977.50 • Material Class A Riprap, 54.4 tons @ $3.64/ton , 198.02 Plus 15% Handling 29.70 Total Material 227_.72.72 TOTAL ITEM NO. 6 2,175.55 .y Flandrau-Hoyt Relief Sewer System page 3 Project Nos. 75-S-1489C,C1,C2 • ADDITIONS: (Continued) Item No. 7 - Placing plastic netting on the inside slopes of the ponding area to prevent erosion. Date worked: August 5, 1975 Material Plastic Netting, 4,300 sq. yds. @ $0.39/s,.y. $1,677.00 Total Material $1,677.00 TOTAL ITEM NO. 7 $1,677.00 TOTAL ADDITION FOR CONTRACT CHANGE AGREEMENT NO. 1 $5,176.38 Item #1 $ 415.50 Item #2 482.1+ Item #3 37.00 Item #4 376.22 Item-#5 12.97 • Item #6 2,175.55 Item #7 1,677.00 Total Addition $5,176.38 s