D2539 White — City Clerk No. 0 �? _673 7 Pink — Finance Dept. 2 ibT6 Canary Dept. Accounting Date _ ►N _ _ �T Blue — XF*Wea City Architect Green — Contractor • CITY OF SAINT PAUL — OFFICE OF THE MAYOR ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEMENT NO.A-2 ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described as General Construction of Highland Park Swimming Pool . known as Contract L-7601 -2City Project No. 73-69 , Shaw-Lundquist Associates , Inc . , Contractor, is composed of the following: ITEM #1 Substitution of "Steelcote Epo-tex Floor coating and MCU 3300 Urethane Sealer for the 3M Liquid Anti -Slip Floor Coating . _ Add $450.00 ITEM# 2 Addition of two permanent , air tight , hinged closure panels , one for each tunnel leading away from the mechanical room. Add $300 .00 i ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac- cordance with the specifications in the sum of $ 7 5 0 _ Q fl , said amount to be added to the lump sum con- sideration named in the contract, known as contract L- 7 6 01 -2 , and which amount is to be financed from: 93073-537-016 AP ROVED T ORM 19 Shaw-Lundquist Associates . Inc . ssistant Uty Attorn Contractor 19 By d letter Engineer 19 ;e r ea o D artment Fi ce 7 l 19 Director o0 mm u n i ty Services Administrative Assistant to the Mayor Aw-