• CITY OF SAINT PAUL — OFFICE OF THE MAYOR
ADMINISTRATIVE ORDER
for
CONTRACT CHANGE AGREEMENT NO.A-2
ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described
as General Construction of Highland Park Swimming Pool .
known as Contract L-7601 -2City Project No. 73-69 , Shaw-Lundquist Associates , Inc . ,
Contractor, is composed of the following:
ITEM #1
Substitution of "Steelcote Epo-tex Floor coating and MCU 3300 Urethane
Sealer for the 3M Liquid Anti -Slip Floor Coating .
_ Add $450.00
ITEM# 2
Addition of two permanent , air tight , hinged closure panels , one for
each tunnel leading away from the mechanical room.
Add $300 .00
i
ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac-
cordance with the specifications in the sum of $ 7 5 0 _ Q fl , said amount to be added to the lump sum con-
sideration named in the contract, known as contract L- 7 6 01 -2 , and which amount is to be financed from:
93073-537-016
AP ROVED T ORM
19 Shaw-Lundquist Associates . Inc .
ssistant Uty Attorn Contractor
19 By d letter
Engineer
19
;e r ea o D artment Fi ce
7
l
19
Director o0 mm u n i ty Services Administrative Assistant to the Mayor