Loading...
D2464 White -City Clerk w No. Pb* - Finance Dept. DEC 2 197 Canary - Dept. Accounting Date Blue - Engineer Green - Contractor • CITY OF SAINT PAUL — OFFICE OF THE MAYOR ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEMENT NO. 1 ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described as Wall l R mov 1 and Grading of CIJRTICP' STREET from Andrew St. to Woodbury St. known as Contract L-7813 , City Project No. 75-M-0550. Ashbach Construction Company , Contractor, is composed of the following: Additions: Item No. 1 (See Attachment No. l) $ 66.60 Item No. 2 " it " 420.84 Item No. 3 " " " 143.00 Item No. 4 487.26 Item No. 5 5,459.10 Item No. 6 (See Attachment No. 1 and No. 2) 4,921.11 TOTAL NET ADDITION $11,497.91 ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac- cordance with the specifications in the sum of $ 11 497,91 — said amount to be added to the lump sum con- sideration named in the contract, known as contract L- 7813 , and which amount is to be financed from: Public Improvement Aid 09050-465. APPRO D A TO F I 19 ASHBACH C01dS'1L'RUCTI0N CO. Assis ant Xttkrw J Contractor !� 19!5 By ngin er _ 19 Chi nee Head of ment of Fin 1975-_ Director of A inistrative ssi ant to the Mayor JF'K/gs - 10/24" 75 -AW(@ Attachment No. 1 (N- Administrative. Order No. 1 • for Wall Removal and Grading of CURTICE STREET from Andrew St. to Woodbury St. City Project No. 75-M-0550 Contract No. L-7813 October 24, 1975 1. Remove concrete walk where panels were cracked and heaved Remove mono. concrete walk, 44.4 yds 2 @ $1.50 = $66.60 2. Replace concrete walk which was removed Construct 4" concrete walk, 187.2 ft. @ $1.00 = $187.20 Construct 5" concrete walk, 212.4 ft.2 @ $1.10 = 233.64 420.84 3. Furnish and Install one catch basin casting and cover because of unanticipated drainage problem Castings in place, cost + 25% = $114.40 + $28.60 143.00 4. Furnish twelve 24" water gate boxes & covers as requested by mater Department to facilitate the new construction. Cost + 15% = $ 423.71 + $63.55 487.26 5. Place 2" 2341 asphalt wearing course in lieu of 3/4" 2361 asphalt wearing course because of unstable sub- soil conditions. • Place 372 tons of 2341 wearing course @ $ 8.50 = $3162.00 Place 24.18 tons of asphalt cement @ $95.00 = 2297.10 5,459.10 6. Extra work in removing and replacing areas of pavement failure due to unanticipated unstable sub-soil conditions (See Attachment No. 2) Labor and fringe + 40% = $1368.66 + $547.46 = $1916.12 Material + 15a = $1173.51 + $176.03 = 1349.54 Eauinnent - Standard rental rates = 812.13 Sub-Contractor's cost + 10% _ $ 766.65 + $ 76.67 = 843.32 4,921.11 TOTAL $11,497.91 ADDITIONS Item No. 1 $ 66.60 Item No. 2 420.84 Item No. 3 143.00 Item No. 4 487.26 Item No. 5 5,459.10 Item No. 6 4,921.11 TOTAL $11,497.91 J»r i Attachment No. 2 • Administrative Order No. 1 for WaI1 Re=val and Grading of CURTICE STREET from Andrew St. to Woodbury St. Labor Costs for Item #6 June 19, 1975: 3 Operators @ $9.18/hr. (8.58 + .60) 22 hrs. + 2 2 hrs. overtime 24.5 hrs. @ $9.18/hr. _ $224.91 1.25 hrs. @ $8.58/hr. = 10.72 $235.63 1 Driver @ $8/lo/hr. (7.45 + .65) 8 hrs. + 12 hrs. overtime 9.5 hrs. @ $8.10/hr. _ $76.95 0.75 Rrs. @ $7.45/hr. _ $-5-58 82.53 1 Asoha1t Raker @ $8.45/hr. (7.70 + .75) 8 hrs. + 1 hr. overtime 9.0 hrs. @ $8.45/hr. _ $76.05 0.5 hrs. @ $7.70/hr. = 3.85 79.90 • 1 ForeTa*± C° $10.00/hr. x 9 hrs. = 90.00 Total Labor Cost for June 19, 1975 $488.06 June 20, 1975: 3 Operators 18 hrs. @ 9.18 = $165.24 2 Drivers 10.25 hrs. @ 8.10 = 83.02 1 Asm alt Raker 8 hrs. @ 8.45 = 67.60 1 Fore=an 8 hrs. @ 10.00 = 80.00 Total Labor Cost for June 20, 1975 395.86 June 23, 1975: 3 Operators 24 hrs. @ 9.18 = $220.32 2 :'rivers 8.25 hrs. @ 8.10 = 66.82 1 HsD'-lt Raiser 8 hrs. @ 8.45 = 67.60 1 =ore san 8 hrs. @ 10.00 = 80.00 Total Labor Cost for June 23, 1975 .434.74 July 9, 1975: 1 Foreman 5 hrs. @ 10.00 = $50.00 • Total Labor Cost for July 9, 1975 50.00 Total Labor Cost $1,368.66 Plus 405' Overhead & Profit 547.46 Total Labor Cost for Item #6 $1,916.12 Attachment No. 2 Administrative Order No. 1 for 'Mall Removal and Grading of CURTICE STREET from Andrew St. to Woodbury St. Equipment Costs for Item No. 6 June 19, 20, 23, and July 9, 1975: 1 Ford backhoe @ $15.50/hr. - 16 hrs. = $248.00 1 Air compressor @ 7.00/hr. - 16 hrs. = 112.00 1 Tri-axel truck @ 11.50/hr. - 20L hrs. = 232.88 1 Steel roller @ 13.50/hr. - 9 hrs. = 121.50 1 Pick-up truck @ 1.45/hr. - 30 hrs. = 43.50 1 Tandem truck @ 7.00/hr. - 7-3/4 hrs. = 54.25 Total Cost for Equipment Rental $ 812.13 Materials Costs for Item No. 6 June 19, 20, and 23, 1975= w 2331 Asphalt base @ $7.67/ton - 153 tons = $1,173.51 +15% = 176.03 Total. NAterials Costs $1,349.54 Sub-Contractor Costs for Item No. 6 July 9, 1975: Soil borings done by Soil Exploration Company and report submitted - as per fee schedule = $766.65 General Contractor overhead + 10% _ $_.76.67 Total Cost for Subcontract Work $ $43.32 •