Loading...
D2404 White City Clerk No. 0 Pink — Finance Dept. Canary — Dept. Accounting 5 Date Blue — Engineer y Green — Contractor NOV 5 1975 ,;I 1Y _ WATER DEPARTMENT CITY OF SAINT PAUL — ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEMENT NO. 2 ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described as Painting the Interior and Rxtprior of the Highland Standpipe A-6553 , known as Contractxx ,£li�pac�SapsadxM� , Contractor, is composed of the following: Modify original specifications Section No. V as follows: SECTICN N0. V; Paint Material & Application: (Exterior Painting System) Modify Original Specifications as follows: Delete original paragraph concerning Exterior Painting System. Substitute for Original Specification as follows: Metal surfaces or portions thereof which are without approved suitable primer or other undercoat because of weatheringv scrapings or other reasonsv but which otherwise are in suitable condition for painting or repaintings shall be touched up with$ or given a coat of Koppers Bitumastic Super • Service Blacks such application to be considered as a primert the application rate shall be made at the rate of one gallon per 75 to 85 square feet andv all metal surfaces ' which are in suitable condition for painting or repaintings approved prime coat included (continued on attached' Page 2) Board of Water Commissioners ORDERED, That the City of Saint Paul, through its fir, approves the foregoing additions made in ac- cordance with the specifications in the sum of s 0 , said amount to be added to the lump sum con- sideration named in the contract, known as contract l- A-6553 , and which amount is to be financed from: Water Department Operating Fund Account No. 80000-000-000 AP AS O l�19 RAL COATINGS, 12C. Ass' tant it ttorn Contra o 19� By Eng' er r 7,Y-- • Chief En 'neer Head of De o f`Finanbtr- 19 ZL I sum= Secretarys Board of Water Commissioners Presidents Board of Water Commissio s jj0V 5 1975 • Page - 2 - CITY OF SAINT PAUL WATER DEPARTMENT CCNTRACT CHANGE AGREEMENT N09 2 shall be given one (1) full coat of Koppers Bitumastic Super Service Black, applied in accordance with Koppers Company, Inc. manufacturers instructions, a copy of these instructions are attached and made a part of this change order, the finished dry film thickness shall be 6 - 8 mils.