ADMINISTRATIVE ORDER 1
for
CONTRACT CHANGE AGREEMENT NO. 1
ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described
as Painting the Interior and Exterior of the Highland Standpipe
known as Contract X- ,
Contractor, is composed of the following:
Modify original specification sections No. IV9 V9 IX and X as follows:
SECTICN IV; Workmanship; Paragraph No. 2_
Modify as follows: Delete reference to paint application below 40° and 50° F.
Substitute as follows: All paint coatings$ as outlined and described in revised spec..
ification Section VS shall be applied in compliance with manufacturers instructions.
SECTICN V; Paint Material and Application:
(Interior Painting System):
Modify to read: Apply four (4) coats of Tnemec Vinoline Paint directly to the sand-
blasted surfaces the paint to be applied in accordance with Tnemec Companys Incorporated
manufacturers instructions for each coating application; a copy of these instructions are
(continued on attached page 2)
ORDERED, That the City of Saint Paul, through its Wy,�ater De artment
Y�or, approves the foregoing additions made in ac,
cordance with the specifications in the sum of $ 1,560.00 , said amount to be added to the lump sum con-
sideration named in the contract, known as contract Z- A-6553 , and which amount is to be financed from:
Water Department Operating Fund
Account No. 80000-000-000
PR AS R
GENE COATINGS IN
Ass' nt ity tto ey Contra or
LO—2Z 197 By
ng' er
19 1Cr'
i Head of Dep men of Finance
Secretary-Board of Water Commissioners President-Board of Water Commissidla
D - a`1O3
NOV 5 1975
CCNTRACT CHANGE AGREEMENT NO. 1 Page -2-
SECTIM V (CONTINUED)
attached and made a part of this Change Order. The paint system coatings to be applied
are as follows.
No. of Coating Description Dry film
Coats Thickness/per coat
1 33-1211 Vinoline Red Primer 1.6 mils
1 34-1220 Vinoline Orange 1.6 mils
Intermediate
2 Vinoline (Series 35) 1.6 mils
Total 4 6.4 mils
SECTION IX; Time of Completion;
Delete from specification the following: Sentences one (1) and two (2) of this
paragraph.
Substitute for specification sentences one (1) and two (2): Standpipe will not be
• in service immediately upon completion of this painting contract.
SECTION X; Liquidated Damages;
Delete from this .paragraph: All references to November 1, 1975 as the contract
completion date.
Substitute into this paragraph: Substitute the date December 15, 1975 for all
references to November 1, 1975 as the completion date.