Loading...
D2403 W' e — City Clerk No. 0 " a L4 Q� rink — Finance Dept. Canary — Dept. Accounting r't,' Date Blue — Engineer Green — Contractor Y. NOV 5 1975 • WATER DEPARTMENT -T, CITY OF SAINT PAUL — ADMINISTRATIVE ORDER 1 for CONTRACT CHANGE AGREEMENT NO. 1 ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described as Painting the Interior and Exterior of the Highland Standpipe known as Contract X- , Contractor, is composed of the following: Modify original specification sections No. IV9 V9 IX and X as follows: SECTICN IV; Workmanship; Paragraph No. 2_ Modify as follows: Delete reference to paint application below 40° and 50° F. Substitute as follows: All paint coatings$ as outlined and described in revised spec.. ification Section VS shall be applied in compliance with manufacturers instructions. SECTICN V; Paint Material and Application: (Interior Painting System): Modify to read: Apply four (4) coats of Tnemec Vinoline Paint directly to the sand- blasted surfaces the paint to be applied in accordance with Tnemec Companys Incorporated manufacturers instructions for each coating application; a copy of these instructions are (continued on attached page 2) ORDERED, That the City of Saint Paul, through its Wy,�ater De artment Y�or, approves the foregoing additions made in ac, cordance with the specifications in the sum of $ 1,560.00 , said amount to be added to the lump sum con- sideration named in the contract, known as contract Z- A-6553 , and which amount is to be financed from: Water Department Operating Fund Account No. 80000-000-000 PR AS R GENE COATINGS IN Ass' nt ity tto ey Contra or LO—2Z 197 By ng' er 19 1Cr' i Head of Dep men of Finance Secretary-Board of Water Commissioners President-Board of Water Commissidla D - a`1O3 NOV 5 1975 CCNTRACT CHANGE AGREEMENT NO. 1 Page -2- SECTIM V (CONTINUED) attached and made a part of this Change Order. The paint system coatings to be applied are as follows. No. of Coating Description Dry film Coats Thickness/per coat 1 33-1211 Vinoline Red Primer 1.6 mils 1 34-1220 Vinoline Orange 1.6 mils Intermediate 2 Vinoline (Series 35) 1.6 mils Total 4 6.4 mils SECTION IX; Time of Completion; Delete from specification the following: Sentences one (1) and two (2) of this paragraph. Substitute for specification sentences one (1) and two (2): Standpipe will not be • in service immediately upon completion of this painting contract. SECTION X; Liquidated Damages; Delete from this .paragraph: All references to November 1, 1975 as the contract completion date. Substitute into this paragraph: Substitute the date December 15, 1975 for all references to November 1, 1975 as the completion date.