Loading...
D2335 White — City Clerk No. 0 Q33 S Pink — Finance Dept. OCT 2 1975 Canary — Dept. Accounting Date Blue — City Architect Green — Contractor CITY OF SAINT PAUL — OFFICE OF THE MAYOR ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEMENT N0. 2 ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described as Site Development Work at Arlington Playground known as Contract L- 7851 , City Project No. 71-21 , A. J. Ryan Landscape Supply Co. , Inc. Contractor, is composed of the following: Remove ten (10) feet of existing concrete wall and construct eight (8) feet of new concrete wall in revised location. Remove ten (10) feet of existing chain link fence and mowing strip and install terminal post and fabric at revised location and patch mowing strip. ADD. . . . . . . . .. . .. . .$760.00 • ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac- cordance with the specifications in the sum of s 760.00 said amount to be added to the lump sum con- sideration named in the contract, known as contract L- 7851 , and which amount is to be financed from: 93771-460-002 OVED T R 9 2 y19 7,1-- A. J. Ryan Landscape Supply Co. , Inc. i dity Atto Contractor 192 By see le r of September 16, 1975 ty rc ect _ _ 19 Heaa of D of Finan L 19_7_ Director of Cdmikkito Services dministrative Ass' tant to a ayor