• CITY OF SAINT PAUL - OFFICE OF THE MAYOR
ADMINISTRATIVE ORDER
for
CONTRACT CHANGE AGREEMENT NO. 4
ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described
as construction of Bridge No. 62528 to carry CLEVELAND AVENUE over the tracks of the
C.M.St.P. & P. R.R. Co.
known as Contract L-7751 , City Project No. B-1033 Northern Contracting Co. ,
Contractor, is composed of the following:
During Class "E" excavation, for wing wall footings, poor bearing material was encountered.
Remove poor material and replace with Class 5 aggregate and 1A43 concrete. Lower culvert
at south abutment as directed by the Engineer to provide 0.30 per cent grade. Install
10 deck drains in accordance with M.H.D. Standard Detail B-703-
Increase or Specifi- Item Quantity Unit Contract +_ Amount
Decrease cation No.
Increase 2401-5 Cone., Mix No. 3.A43 8 Cu.Yd. 5.00 $520.00
It 2401.521 Structural Excavation,
Class "E" 48.5 Cu.Yd- 7.00 339.50
" 2211.503 Aggregate Base Placed,
Class 5 39.5 Cu.Yd. 8.50 335.75
• " Lower 18" C.M.P.Culvert 1 Lump Sum 935.00 935.00
" Furnish and install
B 703 drains 10 Each 12.00 120.00
Increase Estimated Cost of Contract by Amount$20250.25
ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac-
cordance with the specifications in the sum of $ 2,250.25 , said amount to be added to the lump sum con-
sideration named in the contract, known as contract L- 77.5_, and which amount is to be financed from:
1973 County Aid Funds ($1,474.35) and C-M.St-P. & P. R.R. ($775.90).
APPR6VED AS TO FOR
19 T94y__.T 1 L)6
Assi City t ne Contractor
�s 19 By
Engineer 41
19
Chief Engineer _ Head ent of Fin
2 197,J' -7, 1
irector of Public Works Administrative Asisliant to the Mayor
REG cc: Program cc: Office Engineer