Loading...
D1993 White — City Clerk No. Pink — Finance Dept. Canary — Dept. Accounting Date APR 2 1 1975 Blue — Engineer Green — Contractor • CITY OF SAINT PAUL — OFFICE OF THE MAYOR ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEMENT NO. 1 ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described as the ARLINGTON & EAST SHORE DRIVE OUTLET REPAIR known as Contract L- 7803 , City Project No. 75-5-1492a F. Morettini Construction Company , Contractor, is composed of the following: The following materials are required to prevent erosion at the outlet repair. Furnish and Place Stone Riprap 18 cu. yds. Class B Rock @ $20.00 = $360.00 Furnish and Place Gravel Filter Blanket 12 cu. yds. Type 2 Gravel @ $12.00 = 144.00 TOTAL ADDITION TO CONTRACT = $504.00 0 ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac- cordance with the specifications in the sum of $Snh 00 , said amount to be added to the lump sum con- sideration named in the contract, known as contract L- 7803 , and which amount is to be financed from: Sewer Repair Fund 22201-460. APPR(VED A TO F M e � 19 i �, Assis nt ty At ey Contracto7 973' By ngi er _ 19 . Chi ngineer — Head o of in C 1925 Director of Administrative A istant the Mayor