D1794 White '- City Clerk No. 0 — / / Pink - Finance Dept. Canary - Dept. Accounting Date 17 J Blue - Engineer JAN 2 3 Green - Contractor • CITY OF SAINT PAUL - OFFICE OF THE MAYOR ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEMENT NO. 1 ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described as the MILTON-ST. CLAIR STORM SEWER SYSTEM known as Contract L- 7747 , City Project No. 74-S-1277C, Lametti & Sons, Inc. , Contractor, is composed of the following: Fixed Unit Prices: Construct driveway (replace drives removed) 10.8 sq. yds. @ $10.00 $108.00. Water for dust control (as specified in the special provisions) 64,000 gallons @ $5.00/1000 320.00. Remove catch basin, Northwest corner of Grand and Victoria 1 each @ $60.00 60.00 (It was not possible to integrate this structure with the new system) Extra Work: Bus ramp - construct 11" concrete pavement • (replace existing ramp removed) 8.7 sq. yds. @ $14.00 121.80 Rebuild catch basin (see above) 1 each @ $350.00 350.00 ' Sanitary Service at 208 Linwood (see attachment) 688.27 Service offset required storm sewer placement. This offset required work not normally required in an offset (e.g., 53 lin. ft. of pipe) . Total = $1,648.07 ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac- cordance with the specifications in the sum of $1-.648.07 , said amount to be added to the lump sum con- sideration named in the contract, known as contract L-7717 , and which amount is to be financed from: Water Pollution Abatement Fund. APP VE AS 1 FORM - 1'' 19 Ass' t4 Atfoed y Contractop J 19 By '�y /—. Engineer _ 19 Ch)ef Engine Head of of Fi c L Director of A inistrative As st t to the Mayor