Loading...
D1697 White – City Clerk No. 0 Pink – Finance Dept. Canary – Dept. Accounting Date Blue – Engineer 4 Green – Contractor • CITY OF SAINT PAUL — OFFICE OF THE MAYOR ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEMENT NO. 1 ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described as Bituminous Overlay on COMO AVENUE - Jessamine Ave. to E. Como Blvd. , EAST COMO LAKE DRIVE - E. Como Lake Dr. to Lexington Pkwy. N., EAST COMO BOULEVARD - Como Ave. to East Como Lake, LEXINrTON PARKWAY N. – E. Came Lake Dr_ to W. Montana Ave. known as Contract L-7666 , City Project No.7Q_P_o572A_ C_ S_ McCregsan, Zne. , Contractor, is composed of the following: Reconstruct Existing Catch Basins - 15.7 lin. ft. @ $50.00. _ $785.00 Labor, equipment and material used to correct unsuitable subgrade at Butlington Northern, Inc. crossing lump sum = 177.89 Labor, equipment and material used to make sidewalk area serviceable through the winter work suspension as requested by the Parks Department lump sum = 234.64 • Total Addition to Contract = $1,197.53 ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac- cordance with the specifications in the sum of $ 1,1 97-53 , said amount to be added to the lump sum con- sideration named in the contract, known as contract L- 7666 , and which amount is to be financed from: No additional funds needed because of an underrun in the original bid items. APP AS O FORM OVE �19 ` ssi ity ttor a Contractor r 19 By Eng' ei A. 19 C 'e Enginee He goMeDartment of Finance Director of L7a A�c ministrative essift3at to the Mayor 7—