CITY OF SAINT PAUL — OFFICE OF THE MAYOR
ADMINISTRATIVE ORDER
for
CONTRACT CHANGE AGREEMENT NO. 1
ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described
as Bituminous Overlay on COMO AVENUE - Jessamine Ave. to E. Como Blvd. , EAST COMO LAKE
DRIVE - E. Como Lake Dr. to Lexington Pkwy. N., EAST COMO BOULEVARD - Como Ave. to East
Como Lake, LEXINrTON PARKWAY N. – E. Came Lake Dr_ to W. Montana Ave.
known as Contract L-7666 , City Project No.7Q_P_o572A_ C_ S_ McCregsan, Zne. ,
Contractor, is composed of the following:
Reconstruct Existing Catch Basins - 15.7 lin. ft. @ $50.00. _ $785.00
Labor, equipment and material used to correct unsuitable
subgrade at Butlington Northern, Inc. crossing
lump sum = 177.89
Labor, equipment and material used to make sidewalk area
serviceable through the winter work suspension as requested
by the Parks Department lump sum = 234.64
• Total Addition to Contract = $1,197.53
ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac-
cordance with the specifications in the sum of $ 1,1 97-53 , said amount to be added to the lump sum con-
sideration named in the contract, known as contract L- 7666 , and which amount is to be financed from:
No additional funds needed because of an underrun in the original bid items.