D1592 White - City Clerk No. D
Pink - Finance Dept. C T 8 I�/
Canary - Dept. Accounting Date
Blue - Engineer
Green - Contractor
•
CITY OF SAINT PAUL - OFFICE OF THE MAYOR
ADMINISTRATIVE ORDER
for
CONTRACT CHANGE AGREEMENT NO. M-1
ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described
as Mechanical Construction of Oxford Recreation Center Pool
known as Contract L-7571-3, City Project No. Bergj,ors_t_ Plumbing & Htg. Co.
Contractor, is composed of the following:
1. Increase the size of the 6" sewer line to the street
to 8" line size to adequately accommodate the pool
backwashing function. Increased material cost only. ADD $1, 044. 00
2. Add a 4" floor drain with backwater valve and cast
iron drain line in pool equipment room. Connect
to sump, ADD 325. 00
Total Addition $1, 369. 00
ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac-
cordance with the specifications in the sum of $ 1, 369- 00 , said amount to be added to the lump sum con-
sideration named in the contract, known as contract L- 7571-3 , and which amount is to be financed from:
60000 (L-7571-1)- 3o2.3 o
AP D AS FO
Berghorst Plumbing & Heating Co.
`
��`3 19�
nt City i Contractor
7�
� 7 19 BY see attached C. C1. 'iba-.1
�x City Architect
19
of En Head of Department of Finance
'09 ON 19 ®� �7
irector of C muni y Sery 'es Adififnistrative As stant to he Mayor