Loading...
D1592 White - City Clerk No. D Pink - Finance Dept. C T 8 I�/ Canary - Dept. Accounting Date Blue - Engineer Green - Contractor • CITY OF SAINT PAUL - OFFICE OF THE MAYOR ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEMENT NO. M-1 ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described as Mechanical Construction of Oxford Recreation Center Pool known as Contract L-7571-3, City Project No. Bergj,ors_t_ Plumbing & Htg. Co. Contractor, is composed of the following: 1. Increase the size of the 6" sewer line to the street to 8" line size to adequately accommodate the pool backwashing function. Increased material cost only. ADD $1, 044. 00 2. Add a 4" floor drain with backwater valve and cast iron drain line in pool equipment room. Connect to sump, ADD 325. 00 Total Addition $1, 369. 00 ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac- cordance with the specifications in the sum of $ 1, 369- 00 , said amount to be added to the lump sum con- sideration named in the contract, known as contract L- 7571-3 , and which amount is to be financed from: 60000 (L-7571-1)- 3o2.3 o AP D AS FO Berghorst Plumbing & Heating Co. ` ��`3 19� nt City i Contractor 7� � 7 19 BY see attached C. C1. 'iba-.1 �x City Architect 19 of En Head of Department of Finance '09 ON 19 ®� �7 irector of C muni y Sery 'es Adififnistrative As stant to he Mayor