D1220 White — City Clerk No. 0
Pink — Finance Dept.
Canary — Dept. Accounting Date
Blue — Engineer
Green — Contractor
• CITY OF SAINT PAUL - OFFICE OF THE MAYOR
ADMINISTRATIVE ORDER
for
CONTRACT CHANGE AGREEMENT NO. 1
ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described
as Improvement of Streets, Alleys and Sidewalks in the SUMMIT-UNIVERSITY RENEWAL
AREA; Also Construct a Storm Sewer.
known as Contract L- 7581-2 City Project No. 73-G-19>97 & 73-S-0971G3A, Shafer Contracting Co, , Inc.,
Contractor, is composed of the following:
Construct asphalt boulevards at various commercial locations.
129.3 sq. yd. @ $ 2.70 = $31+9.11
Tractor-Backhoe rental for relocating existing hydrant at
Grotto and Central.
6 hours @ $ 20.00 = 120.00 "
Construct type 2-B catch basins at Grotto and Central.
1 structure @ $350.00 = 350.00 ✓
Repair existing sewer service connections at 756 Fuller Ave.
and 766 Fuller Ave. Equipment $183.50
Labor 117.75 = 301.25
Application of water for dust control as per Minnesota Highway
Department Specification 2130.
160,000 gallons @ $ 5.50 = 880.00
= $2000.36
ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac-
cordance with the specifications in the sum of $ 2,000.16 , said amount to be added to the lump sum con-
sideration named in the contract, known as contract L- 7581-2 , and which amount is to be financed from:
Urban Renewal Bond Fund No. A-1-1.
APPROVED AS TO FORM
\ k &W — — 19
Assis Cit At o Contractor
c't , f� >51'' 19� By
ngiq er
19747 90�u
f Engi er Head of epartment pf Fi ce
3-22 1974- _ J�L
Director ofu Administrative Assistant to a Mayor