Loading...
D1220 White — City Clerk No. 0 Pink — Finance Dept. Canary — Dept. Accounting Date Blue — Engineer Green — Contractor • CITY OF SAINT PAUL - OFFICE OF THE MAYOR ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEMENT NO. 1 ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described as Improvement of Streets, Alleys and Sidewalks in the SUMMIT-UNIVERSITY RENEWAL AREA; Also Construct a Storm Sewer. known as Contract L- 7581-2 City Project No. 73-G-19>97 & 73-S-0971G3A, Shafer Contracting Co, , Inc., Contractor, is composed of the following: Construct asphalt boulevards at various commercial locations. 129.3 sq. yd. @ $ 2.70 = $31+9.11 Tractor-Backhoe rental for relocating existing hydrant at Grotto and Central. 6 hours @ $ 20.00 = 120.00 " Construct type 2-B catch basins at Grotto and Central. 1 structure @ $350.00 = 350.00 ✓ Repair existing sewer service connections at 756 Fuller Ave. and 766 Fuller Ave. Equipment $183.50 Labor 117.75 = 301.25 Application of water for dust control as per Minnesota Highway Department Specification 2130. 160,000 gallons @ $ 5.50 = 880.00 = $2000.36 ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac- cordance with the specifications in the sum of $ 2,000.16 , said amount to be added to the lump sum con- sideration named in the contract, known as contract L- 7581-2 , and which amount is to be financed from: Urban Renewal Bond Fund No. A-1-1. APPROVED AS TO FORM \ k &W — — 19 Assis Cit At o Contractor c't , f� >51'' 19� By ngiq er 19747 90�u f Engi er Head of epartment pf Fi ce 3-22 1974- _ J�L Director ofu Administrative Assistant to a Mayor