Loading...
D1004 White – City Clerk No. 0 — I 0 0 q Pink – Finance Dept. oEC 1 973 Canary - Dept. Accounting Date Blue – Engineer Green – Contractor • CITY OF SAINT PAUL — OFFICE OF THE MAYOR ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEMENT NO. 1 ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described as the EARL STREET STORM SEWER - McLean Avenue to Thorn Street known as Contract L- 761+5 , City Project No.7' known Shafer Contracting Company, Inc. , Contractor, is composed of the following: ADDITIONS: Furnish and Install 15" R.C. Pipe Catch Basin Lead 15 lin. ft. @ $10.50 $157.50 Furnish and Install 12" V.C. Pipe Side Inlet Leads 15 lin. ft. @ 5.00 75.00 Remove Pavement for Trench 24 sq. yds. @ 2.00 1+8.00 Construct Concrete Base and Asphalt Surfacing 24 sq. yds. @ 9.00 216.00 • Remove Monolithic Concrete Walk 6 sq. yds. @ 1.00 6.00 Construct 4" Concrete Walk with Curb 55 sq. ft. @ 1.00 55.00 Total Change Agreement No. 1 $557.50 ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac- cordance with the specifications in the sum of $557.50 said amount to be added to the lump sum con- sideration named in the contract, known as contract L- 7645 , and which amount is to be financed from: Water Pollution Abatement Fund 7201+0. APPROVED AS 0 FORM A � 19 ist y t o ey Contractor c G6 /V' 19 By vz� � • ngi ee_. • 197 hi nginee 1K Head of De tment of A F Duector of inistrative As ist the Mayor