D917 White — Cit7 No. D "`' M Pink nance Dept. Canary — Dept. Accounting Date OCT Z 4 W1 Blue — Engineer Green — Contractor • CITY OF SAINT PAUL — OFFICE OF THE MAYOR ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEMENT NO. 1 ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described as Resurfacing of EAST SHORE DRIVE from Johnson Parkway to East Larpenteur Avenue known as Contract L-7588 , City Project No. 2—P-0 $6, Tower Asphalt, Incorporated , Contractor, is composed of the following: Construct Concrete Curb, Design B6 288 Lin. Ft. @ $ 4.00 $1,152.00 Furnish and Place Fill Concrete 86.5 Cu. Yds. @ 25.00 2,162.50 Furnish & Install 12" P.V.C. Sewer Pipe 53.3 Lin. Ft. @ 8.00 426.1+0 Furnish and Place Sand Fill 252 Cu. Yds. @ 3.75 945.00 Furnish & Place Gravel Backfill 21 Tons @ 5.50 115.50 Hydraulic Pavement Breaker with Operator 15 Hours @ 20.00 300.00 Remove & Replace 4" Concrete Walk 43.5 Sq. Ft. @ 1.11 48.29 • TOTAL ADDITION TO CONTRACT $5,149.69 ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac- cordance with the specifications in the sum of $ 5,149.69 , said amount to be added to the lump sum con- sideration named in the contract, known as contract L- 7588 , and because of a reduction in the original contract quantities, no additional financing is required. -7--"_ APPROVED AS TO FORM 19 TOWERASPHALT, INC. ssistant City Attorney Contractor G � 19 By En ' eer Chi ngineer Head ofD4apartment of Finan j—,A , 719 — Director of AArKinistrative ssi t o the Mayor