CITY OF SAINT PAUL — OFFICE OF THE MAYOR
ADMINISTRATIVE ORDER
for
CONTRACT CHANGE AGREEMENT NO. 1
ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described
as Resurfacing of EAST SHORE DRIVE from Johnson Parkway to East Larpenteur Avenue
known as Contract L-7588 , City Project No. 2—P-0 $6, Tower Asphalt, Incorporated ,
Contractor, is composed of the following:
Construct Concrete Curb, Design B6 288 Lin. Ft. @ $ 4.00 $1,152.00
Furnish and Place Fill Concrete 86.5 Cu. Yds. @ 25.00 2,162.50
Furnish & Install 12" P.V.C. Sewer Pipe 53.3 Lin. Ft. @ 8.00 426.1+0
Furnish and Place Sand Fill 252 Cu. Yds. @ 3.75 945.00
Furnish & Place Gravel Backfill 21 Tons @ 5.50 115.50
Hydraulic Pavement Breaker with Operator 15 Hours @ 20.00 300.00
Remove & Replace 4" Concrete Walk 43.5 Sq. Ft. @ 1.11 48.29
• TOTAL ADDITION TO CONTRACT $5,149.69
ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac-
cordance with the specifications in the sum of $ 5,149.69 , said amount to be added to the lump sum con-
sideration named in the contract, known as contract L- 7588 , and
because of a reduction in the original contract quantities, no additional financing
is required. -7--"_
APPROVED AS TO FORM
19 TOWERASPHALT, INC.
ssistant City Attorney Contractor
G � 19 By
En ' eer
Chi ngineer Head ofD4apartment of Finan j—,A ,
719 —
Director of AArKinistrative ssi t o the Mayor