Loading...
D398 White : ; City Clerk No. 0 Pink in once Dept. Canary Dept. Accounting Date JAN 2 5,1973- Blue — Engineer Green — Contractor • CITY OF SAINT PAUL - OFFICE OF THE MAYOR ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEMENT NO._ 1 ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described as Improvement of Streets, Alleys and Sidewalks in the SUMNIT—UNIVERSITY RENEWAL AREA known as Contract L- 7248-4, City Project No. 71—G-1411, Alexander Construction Compa=, Inc„ Contractor, is composed of the following: As per Items A through I listed on attached sheet Total Contract Change Agreement No. 1, Items A through I = $5,677.99 • ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac- cordance with the specifications in the sum of $ 5,677.99 , said amount to be added to the lump sum con- sideration named in the contract, known as contract L- 7248-4 , and which amount is to be financed from: Urban Reneval Bond Funds.,� APP V D AS TO FORM 19 ssi a A to Contra for ` X19 4 By er 19, i nginee Head of De artment of Finance 19 X3/73 Director of 6/,C r,(9o> Administrative Assistaift to the Mayor • Attachment to ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEMENT NO. 1 Improvement of ,Streets, Alleys and Sidewalks in the SUMMIT-UNIVERSITY RENEWAL AREA, known as Contract L-7248-4, City Project No. 71-G-1933, Alexander Construction Company, Inc., Contractor. ADDITIONS A. Furnish and place topsoil in boulevard areas 408 cu. yds. topsoil @ $ 4.50 $1,836.00 B. Construct Type II manhole at the intersection of Iglehart and Victoria Type II Manhole @ $425.00 425.00 C. Furnish & install cast iron pipe for a catch basin lead (additional cost per ft. = $2.50) 23 lin. ft. C.I.P. @ $ 2.50 57.50 • D. Construct bituminous blvds. at various locations at property owners request 5,599 sq. ft. @ $ 0.42 2,351.58 E. Construct manhole opening in sidewalk as per St. Paul Std. Drg. No. 1301 7 each @ $ 75.00 525.00 F. Remove old light standard base 2 each @ $ 6.00 12.00 G. Labor & equipment to excavate unsuitable material from subgrade on Milton Street between Fuller and Aurora (based on Force Account records). lump sum 388.42 H. Labor & equipment to reset curb & gutter forms on Victoria St. between Aurora and University (based on Force Account records). lump sum 38.24 I. Labor & equipment to slope yard at 1036 W. Central (based on Force Account records). lump sum 44.25 • TOTAL CONTRACT CHANGE AGREEMENT NO. 1 $5,677.99