Loading...
D75 Griginal to City Clerk No. 75 Date UG 9 1972 • CITY OF ST. PAUL OFFICE OF THE MAYOR ADMINISTRATIVE ORDER Re: SIDEWALKS ADMINISTRATIVE ORDER, That the Director of the Department of Public Works is hereby authorized and directed to prepare plans, obtain surveys, prepare estimates and investigate the necessity to construct and/or-reconstruct the sidewalk on both sides .of Portland Ave. from Dale St. to Avon St. and by doing all other work which. is' necessary and incidental to complete said improvement. APPROVED AS TO FORM C A for y ent Head Assistant - Date Administrative Assistant to Mayor Robert W. Tru Acting Director of FtganLe. • ADVISABILITY AND DESIRABILITY B.S. Portland Ave. - Dale St. to Avon St. Dist. No. 2 This order was initiated by the Director of Public Works on the basis of inspection of walk. This walk is old the and poured concrete with tree heaves, broken tile, high joints, tripping hazards, water pockets, holes in tile, missing tile, high longitudinal joints, offgrade, asphalt patches, disintegrated, cracked concrete panels, scaled and tipped panels. The Engineering recommendation is for approval of the order. Remarks: Summit-University Area. (reduce from a 6 ft. to a 5 ft. walk) • CT HJ RP •