Loading...
D10939 White — City Clerk No. V J 1 Pink — Finance Dept. Canary — Dept. Accounting Date Blue — Engineer Green — Contractor • CITY OF SAINT PAUL — OFFICE OF THE MAYOR ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEMENT NO. 1 ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described as SYLVAN-ACKER SEWER SEPARATION tivity#29075 89-S-8053 Lametti & Sons, Inc. known as � , City Project No. , Contractor, is composed of the following: Section Description Amount 1 Reinforced concrete slab removal; place rock around pond. $45,552.84 2 Cut/plug watermain; delay for contaminants; relay pipe; $ 9,929.62 remove/replace wall; manhole inside drop; remove more concrete slabs. 3 Modify walls; grout sanitary; downtime for watermain; $ 7,356.86 delay for bridge footing; install R.C.P. bends. 4 Reroute Jackson Street sanitary sewer; discharge contaminated $64,149.60 • water and remove railroad track around Structure #1. Total Change Order Additions (See Attachment for Breakdown) $126,988.92 ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac- cordance with the specifications in the sum of 8 126,988.92, said amount to be added to the lump sum con- activity #29075 sideration named in the contract, known as xKxmzcb= and which amount is to be financed from: 1989 CSSP Z7 AS F 00 oe ' l 19 / Assistant ity Attorney / 9 ?o By Zx*W, Engfneer f 19� ne Head of Department o Finance —• �19 Director of A inistrative Assistant to the Mayor DEPARTMENT/OFFICE/COUNCIL JDj; INITIATED ` 8241 Public Works /2/90 GREEN SHEET ``'✓` NO. INITIAL/DATE CONTACT PERSON&PHONE � R A v` K CITY COUNCIL Larry Lueth 292-6113 IGN TYATTORNEY " CITY CLERK MBER FOR M' E ON COUNCIL AGENDA BY(DATE) UTING DGET DIRECTOR FIN.&MGT.SERVI E DIR.DER Larry LuetJ e h Koenig MAYOR(OR ASSISTANT) rY P 9 TOTAL#OF SIGNATURE PAGES 1 (CLIP ALL LOCATIONS FOR SIGNATURE) ©Jim Schwartz ACTION REQUESTED H E C E Provide compensation for extra work performed by the Contractor at the request of the Engineer. SYLVAN-ACKER SEWER SEPARATION City Project No. 89-S-8053 APR 11 1990 Contractor: Lametti&Sons, Inc. RECOMMENDATIONS:Approve(A)or Reject(R) COUNCIL COMMITTEE/RESEARCH REPORT OPTIONAL T _PLANNING COMMISSION _CIVIL SERVICE COMMISSION ANALYST PH ISO. _CIB COMMITTEE COMMENTS _STAFF DISTRICT COUNCIL _ SUPPORTS WHICH COUNCIL OBJECTIVE? INITIATING PROBLEM,ISSUE,OPPORTUNITY(WHO,WHAT,WHEN,WHERE,WHY): The Contractor was directed to perform extra work not included in the original contract. This included: reinforced concrete slab removal; place rock around pond;cut/plug watermain;delay for contaminants; relay pipe; remove/replace wall; manhole inside drop; remove more concrete slabs; modify walls;grout sanitary;down time for watermain;delay for bridge footing; install R.C.P. bends; reroute Jackson Street sanitary sewer;discharge contaminated water; and move railroad tracks around Structure No. 1. ADVANTAGES IF APPROVED: These additional work items had to be constructed for completion of the project. DISADVANTAGES IF APPROVED: DISADVANTAGES IF NOT APPROVED: RECEIVED APR131AA0 CITY CLERK AL AMOUNT OF TRANSACTION$ 126,988.92 COST/REVENUE BUDGETED(CIRCLE ONE) YES OR FUNDING SOURCE 1989 CSSP Funding ACITVITY NUMBER C89-2T622-0785-290755 FINANCIAL INFORMATION:(EXPLAIN) d w