w CITY OF ST. PAUL COUNCIL NO. '17f)f) �+
OFFICE OF THE CITY CLERK Ao.rXIIIIIII10-lor-mat,
U RESOL N ENERAL FORM
UT
PRESENTED BY Is {rr f rto*i :, ✓ ' ,
COMMISSIONS DATE 'Y v t 'q
WHEREAS, ADDITIONS AND DEDUCTIONS which sight prove to be necessary
in the improvement described as the Restoration and Repair of Robert Street
Bridge Sheer Fence, Comptroller's Contract L-5703, Hurley Construction Company,
Contractor, have been provided for in the specifications at unit prices
stipulated herein and by resolution C. F. 176577 approved January 26, 19561,
and
WHEREAS, It has been found necessary to make the following Additions
and Deductions:
As per attached statement:
WHEREAS,, The total net Deduction is $3,059.59, now therefore, be it
RESOLVED, That the City of St. Paul through its City Council approves
the foregoing Deduction made in accordance with the specifications in the sum
of #3,059.59, said am to be deducted fraa the lump sum consideration named in
the contract, known as Comptroller's Contract L-5703, for the making of the
above improvement.
The Commissioner of Public Works has agreed with the above named
contractor that the sum of $3,059.59 is the correct amount to be deducted
from the above contract,
Harley Construction Co.
Com:aie ie o is Works
1956
COUNCILMEN Adopted by the.Council F E B 195—
Yeas Nays
FEB 1956
Halvorson Approved Holland In Marzitelli n Favor
Mortinson Q Mayor
Peterson Against
Mr.President, Dillon PUBLISHED i;2--//-
5M 6.55 �2
1766"82
DEDUCTIONS
Lump sum bid for removal of existing fender
timbers and piling making ready timbers
and piling designated for reuse and
removal of debris . . . . . . . . . . . $5,589.00
Actual cost of material, labor and -
equipment 3,2b1 0
$2,327.50
Lump am bid for straightening of sheer
fence east of point "DO . . . . . . . . 22042.
Actual cost of material, labor and
equipment . . . . . 1,340.69
701.11
For furnishing wood piles
Reduction of 60 ft. 0 1.26 75.60
For furnishing new timber
Reduction of 3293 FM 0 $153/M 503.63
TOTAL DEDUCTIONS . . . . . $3,608.04
ADDITIONS
For driving wood piles
50 llama feet W2.45 . 122.50
For framing and placing timber
1217 FM 0 $350 . . . . . . . . . . . . .
TOTAL ADDITIONS . 548.45
NET 33l2 UCTIONS ....... $31,059.59
Duplicate to Printer t
CITY OF ST. PAUL FILE NCIL NO
OFFICE OF THE CITY CLERK
COUNCIL RESOLUTION—GENERAL FORM
PRESENTED BY
COMMISSIONER DATE
WHEREAS, ADDITIONS AND DEDUCTIONS which might prove to be necessary
in the improvement described as the Restoration and Repair of Robert Street
Bridge Sheer Fence, Comptroller's Contract L-5703, Hurley Construction Company,
Contractor, have been provided for in the specifications at unit prices
stipulated herein and by resolution C. F. 176577 approved January 26, 1956,
and
WHEREAS, It has been found necessary to make the following Additions
and Deductions:
As per attached statementt
WHERFAS, The total net Deduction is $3,059.59, now therefore, be it
RESOLVED, That the City of St. Paul through its City Council approves
the foregoing Deduction made in accordance with the specifications in the sum
of $3,059.59, said sum to be deducted from the lump sum consideration named in
the contract, known as Comptroller's Contract L-5703, for the making of the
above improvement.
The Commissioner of Public Works has agreed with the above named
contractor that the sum of $3,059.59 is the correct amount to be deducted
from the above contract.
Hurley Construction Co.
Comm ss ner f Works
COUNCILMEN Adopted by the Council FEB ' 1956195_
Yeas Nays
Gibbons a
Halvorson Approved 195—
Holland
Marzitelli In Favor
Mortinson Mayor
Peterson Against
Mr. President, Dillon
5M 6-55 2
PAM
DEDUCTIONS
Lump sum bid for removal of existing fender
timbers and piling making ready timbers
and piling designated for reuse and
removal of debris . . . . . . . . . . . . . . . 15,589.00
Actual coat of material, labor and
equipment . . . . . . . . . . 31261-50
X2,327.50
Lump sum bid for straightening of sheer
fence east of point "D" . . . . . . . 0 0 . . . 22042.00
Actual cast of material, labor and
equipment 1=340.89
701.11
For furnishing wood piles
Reduction of 60 ft. @ 1.26 75.60
For furnishing new timber
Reduction of 3293 FBM @ 153/M 503.83
TOTAL DEDUCTIONS . $3,608.04
ADDITIONS
For driving wood piles
50 lineal feet 4 2.45 , . 122.50
For framing and placing timber
1217 FBM @ MOM . . . . . . . . . . . . . . . . 425.95
TOTAL ADDITIONS 548.45
NET DEDUCTIONS .. .. .. . X3,059.59