Loading...
177384 r'. a COUNCIL FILE N0.__17 S.4 By--------------------------------------------- ------------------ FINAL ORDER i +nq tn- In the Matter of repaving Fifth Street from Jackson Street to Broadway by removing present sandstone wearing course and concrete base; by removing track pavement including rails and ties; by constructing new concrete base and asphaltic concrete surfacing; by paving alley and driveway returns; by constructing new curbing and sidewalks where necessary; by constructing sewer, water and gas service connections from the street main* to the property lines where necessary; reconstructing the paving, curbing and sidewalks on the intersecting streets where not in conformity with said improvement; by constructing conduits and appurten- ances for future lighting and traffic control systems where necessary; and by doing all other work which is necessary and incidental to said improvement, under Preliminary Order_____-_175726 approved _______________November__10,--1.55------------------ a ---- - Intermediary Order----------------------------------------------------approved -------------------------------------------------------------------- A public hearing having been had upon the above improvement upon due notice, and the Council having heard all persons, objections and recommendations relative thereto, and having fully considered the same; therefore, be it RESOLVED, By the Council of the City of St. Paul that the precise nature, extent and kind of im- provement to be made by the said City is repave Fifth Street from Jackson Street to Breadway by removing present sandstone wearing course and concrete base; by removing track pavement including rails and ties; by constructing new concrete base and asphaltic concrete surfacing; by paving alley and driveway returns; by constructing new curbing and sidewalks where neces- sary; by constructing sewer, water and gas service connections from the street mains to the property lines where necessary; reconstructing the paving, curbing and sidewalks on the intersecting streets where not in conformity with said improvement; by constructing conduits and appurtenances for future lighting and traffic control systems where necessary; and by doing all other work which is necessary and incidental to said improvement, and the Council hereby orders said improvement to be made. RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and directed to prepare plans and specifications for said improvement, and submit same to the Council for approval; that upon said approval, the proper city officials are hereby authorized and directed to pro- ceed with the making of said improvement i�Accordance therewith. P of 0 Adopted by the Council---------------------------------------------- ----• I'D ------- ------ - --- - --- -------- ------ City Clerk. Approved---- ---- -.:----------- PUBBLIS`rIEI� /lL-��f� File,1=2�+6 ----------- -- ---------------- `� --- -- ----------- -1------------- Mayor. Councilman 5-- Councilman Derr Councilman HOLLAND Councilman MARZITELLI Councilman MORTINSON Councilman PETERSON Mayor` DILLON 2.55 2M 2 CITY OF ST. PAUL DEPARTMENT OF FINANCE REPORT OF COMMISSIONER OF FINANCE 17t-092 (A) ON PRELIMINARY ORDER In the matter of repaving Fifth Street from Jackson Street to Broadway by removing present sand- stone wearing course and concrete base; by removing track pavement including rail and ties; by constructing now concrete base and asphaltic concrete surfacing; by paving alley and driveway returns; by constructing new curbing and sidewalks where necessary; by constructing sewer.9 water and gas service connections from the street mains to the property lines where necessary; re- constructing the paving, curbing and sidewalks on the intersecting streets where not in con- formity with said improvement; by constructing conduits and appurtenances for future lighting and traffic control systems where necessary; and by doing all other work which is necessary and incidental to said improvement. under Preliminary Order approved November 10, 1955 To the Council of the City of St. Paul: The Commissioner of Finance hereby reports as follows: The total estimated amount of the assessment for the above improvement is The estimated cost per foot for the above improvement is The lots or parcels of land that may be assessed benefits for such improvement, and the assessed valuation of each lot or parcel as last reported by the Assessor, are as follows: DESCRIPTION LOT 113LOCK ADDITION ASSESSED I VALUATION �Iand- -Bal 1 ding Auditor's Subdivision No- 32 1 do 8300- 33..000- Lots 2, 3s 4 & 5 1 do 89500- 37,500. # E>c. S. 144,475 ft.; Lots C & D Drake's arrangement "A" also Lots 2, 3, 4 and 8 and an that part of Lots 5, i 7.vi9., 1p and 15 lying N and I of a line described as follows: Commenung a a pio int on the NE line of Jackson St. 145.23 ft. from the NW line of 4th thence 900 to the right 63*77 ft.; thence Oo 321 300 to the right 1110, 2 ft�. to point of beg; thence 900 321 300 to the left 73,445 ft- 1hemmnic 900 to the left to intersection with a.line parallel with and distant 63 77 flt* from ME line of Jackson St.; ' thence to the left along said paral�ng Blobk 2 1 50,000. 1,000, e 14.41 ft.; thence 90 to the O( right to It line of Jackson St.; being Drake's Rearrangement W -JAAAj - 7-01YWOw TOTAL Ii Form B.B. 10 I CITY OF ST. PAUL DEPARTMENT OF FINANCE REPORT OF COMMISSIONER OF FINANCE ON PRELIMINARY ORDER ii ASSESSED DESCRIPTION LOT 'BLOC K ADDITION an&/ALUA aJQgy If Drake's Rearrangement "A" Lot l.. Block- 2., Auditor's Subdivision 4 No. 32 and "B" do Whitney and Smith's Addition Ex. St.; Stly 44 f t. of Lots 8 and , 9., Block 13., City of Saint Paul and' j,j except alley; S1 1y 44 ft. of 9 9 1 do 120500. 16o500. &@opt alley; Lot 6 and South q 5 feet of 5 9 do 1109000, j Lot 7 and except alley; 8 9 do 11.250. 1,600.j1 Ex. St.; 3 1 3,y 44 ft. of Lots 8 and 9., Block 13,9 Ci ty of 3 t. Paul and I except alley; S I ly 44 ft. of 9 9 do 10 de 123,t WO rizeept alloy; 6 11 do f 192200- 108,9750- 7 U do '142 0000 275.,000i, Part of Kittson's Addition lying between the northerly line of Lot 3. li and the southerly line of Lot 6 ,. extended to Broadwer and except masterly 64.67 ft.; Lots 4o 5s 6 and all of 3 12, do 2lj500e 60p000*4 1 Weater3jy 64.67 ft. of Lots 4, 5 and 6 12 do 10,500 o 39 250 a Part of Kittson's Addition lying between the northerly and southerly if , lines of Lot 1., Block 13s Whitney and Smith's Addition extended to ilDroadway and all of said 1 13= do ;112#500* 20,#000e That part northe"terly-or a line 111 from a point on the soxitheasterly line of East 5th St. 150-41 f t- from the! 1W11y eer of Lot 12 to a point on t 0 ii NW line of alley in Elk. 14.. 149-77i ft* from the SW11y cor of Lot 3.1 of do l6p3000 2905004 Lots 1., 2,9 11 and 12 , 14;, FORM TOTAL CITY OF ST. PAUL DEPARTMENT OF FINANCE REPORT OF COMMISSIONER OF FINANCE ON PRELIMINARY ORDER DESCRIPTION LOT LOCK ADDITION ASSESSED i Loa ALUATiff del jWhitney and Smith's Addition Part lying southwesterly of a line from a point on the southeasterly line of East 5th St., 150.41 ft. from the northwesterly corner of ! Lot 12 to a point on the north— westerly line of alley in Block 14, 149.77 ft. from the south- !! westerly corner of Lot 11 of Lots , 1, 11 and 12 14 i do 11693110. 33,500 �i Except alley; Lots 5 and j 6 j 15 do 112#900• 48s500e —19 18 TOW J100055%m6 -a--73s ; i 1 1 i c I a 4 The Commissioner of Finance further reports that he has investigated all of the aforesaid matters, and hereby submits the foregoing as his report thereon to the Council, together with the report made to him in reference to said matter by the Commissioner of Public Works. Dated March 13 _19_L6_ /Gogh.« C0, 6Z,a�L Commissioner of Finan Form B. B. 12 Office of the Commissioner of Public Works Report to Commissioner of Finance February 14 19 56 To the Commissioner of Finance of the City of Saint Paul: The Commissioner of Public Works, having had under consideration the preliminary order of the ---- . ens_ r�cil 1'ils_No_ R17S7a6 �� roverl Kober 10 SS —, relative to ROMLTAS 71M Street from Jackson Street to grosdray by rmaving present sandstone Wiring-_covers and concrete bans _ rssa•►Sng track-past including rails and tica; by constructing new ocacrete bare and asphaltic concrete surfacing; by paving alley and drimrriy returns; bar constructing new combing and sidewalks Uhire mess construct _ �►; b9 constructing sews, water and � srririca eo�retiduur+ t street gains to the, a 't'a! Diner where ucearsaq; revonstrusting the paring, e 3n'g at�d`'ii� i 0 the itiu4soting smarts,*ire``nat `iu 46123broity with said improvement; bps oorutrueting conduits and appartruanoes for future lighting and tftnia`vowb*l- 4'st Where.26"We"ti _b d6int all ether work which it necessary and incidental to said ispa-orawrat. - -----Z. The-estimated-cost-tnereoris - _ and tine-Lou i coat-ater NOTE: ESTIMATE ATTACHED and the nature and extent of said improvement is as follows: j 3. A plan, profile or sketch of said improvement is hereto attached and made a part hereof. 4: 5. Said improvement is - Asked for upon petition of three or more owners of prop subject to assessment for said im rovement. ' ' P- r. Jr [(� Com Tic ks 2M 7-49 .4do.8 14 3� ASSISTANT CHIEF ENGINEER CITY OF SAINT PAUL ACCOUNTING DIVISION ARTHUR W. TEWS JOS. PAVLICE LICEK • Prin. Accountant OFFICE ENGINEER Capital of Minnesota HERBERT S. WEST a DEPARTMENT OF PUBLIC WORKS • BUREAU OF SANITATION BRIDGE ENGINEER JOHN M. COTTER, Supt. MAURICE W. HEWETT FRANK D. MARZITELLI, Commissioner . TRAFFIC ENGINEER CLIFTON G. HOLMGREN, Deputy Commissioner BUREAU OF MUNICIPAL EQUIPMENT EUGENE W AVERY GEORGE M. SHEPARD. Chief Engineer ARTHUR H. KOCH . 8 STREETS AND HIGHWAYS ENGINEER BUREAU OF CORRECTION ARTHUR G. WELIN JOHN P. MULLANEY, Supt. Hon. Frank D. Marsitelli Ca missioner of Public Works City of St. Paul, Minn. Dear Sir: I transmit herewith preliminary estimate of cost for repaving Fifth Street from Jackson Street to Broadway by removing present sandstone wearing course and concrete base; by removing track pavement including rails and ties; by construct- ing new concrete base and asphaltic concrete surfacing; by paving alley and driveway returns; by constructing new curbing and sidewalks where necessary; by constructing sewer, water and gas service connections fran the street mains to the property lines where necessary; reconstructing the paving, curbing and sidewalks on the intersecting streets where not in conformity with said improvement; by con- structing conduits and appurtenances for future lighting and traffic control systems where necessary; and by doing all other work which is necessary and inci. dental to said improvement, under Preliminary Order C. F. 175726 approved November 10, 1955. Estimated Paving Cost - - - - - - - - - - - - - - - - - $ 80,553.50 Add for Engineering & Inspection 8% _ - _ _ _ _ - 61444928 $ 86,997.78 Add for Water Department Changes 700.00 Total Estimated Cost $ 87,697.78 Estimated Property (Paving _ 2203' x $10.50 $23,131.50 ) Assessment (Curbing- 2028' x . 1.90 30853.20 ) (includes Public ( ) 3 70 Property) (Sidewalk- 708 x 5.50 30894.00 ) �y Y iY,iM�•� CITY'S EUn OF COST (CODE ;l.El) 5 5& ►# 8 'a Y �Y Page 2 - Repaying Fifth St. WOT£t Jackson to Broadway) Estimated Property Share of Cost is based on an Assesownt Rate of: • $10.50 Per front foot for Paving - Frontage of 2203 ft. 1190 "' Carbing- _ " " 2025 ft. 5050 « « • Sidewalk. " w _ 703 ft. ) Areaways Additional Cost 6 3/4* hater Service Comwations $75.00 each, vkore necessary x IV 1 . « w « 125.00 " 6' Sewer Service Connection 150600 ?oars very trrly, urge Shepard Chie ' ineer -Approved for tr�ansaission o Causissioner of Finance r Fr D rsite Comissi or w� I 1 yak � a x add � •s x 0 -Al Z y � y z ` � z r - I � ys -� o `+ a ve \ p I � did 1 \ Or- , 11 9 \ ���-�/ •111. \\\ \ i \ \�../ ,/ - 0 C,� -3z- vJ ♦. Z wh io >'1 NMI Cb ki • � 14y, T'^ � �� c `1 v4 n 0 4 IO O94 � 0 O � 4 S7, c�' 20•' r, 0 0 �C 0 � N r CI Y � Z 4y Z v� wy v� h S• � y CP ti . / A XZ, y' 1 c<<o oolp L ys 3 O I y