In the matter of condemning and taking an easement to construct and maintain a street
lighting' system on East Fourth Street to include all conduits, light fixtures,
conduit risers and such other equipment as may be necessary to operate a public street
lighting system on the wall or walls of the buildings on that part lying westerly of
a line parallel with the present westerly line of Jackson Street and distant 60.14 ft.
therefrom of Lot 2, and all of Lot 3,Block 26, City of St. Paul,
ry 176709 , approved February 8th, 1956
under Preliminary Order
Intermediary Order 177013 , approved March 6th, 1956
A public hearing having been had upon the above improvement upon due notice, and the Council having
heard all persons, objections and recommendations relative thereto, and having fully considered the same;
therefore, be it
RESOLVED, By the Council of the City of Saint Paul that the precise nature, extent and kind of im-
provement to be made by the said City is condemning and taking an easement to construct and
maintain a street lighting system on East Fourth Street to include all conduits, light
fixtures, conduit risers and such other equipment as may be necessary to operate a
public street lighting system on the wail or walls of the buildings on that part lying
westerly of a line parallel with the present westerly line of Jackson Street and distant
60.14 ft. therefrom of Lot 2, and all of Lot 3, Block 26, City of St.Paul.
and the Council hereby orders said improvements to be made.
RESOLVED FURTHER, that the following land, lands or easements therein be and the same are
hereby ordered to be taken, appropriated and condemned for the purpose of making said improvements, viz.:
An easement to construct and maintain a street lighting system on East
x Fourth Street to include all conduitq,light fixtures, conduit risers and such other
equipment as may be necessary to operate a public street lighting system on the wall
or walls of the buildings on that part lying westerly of a line parallel with the
present westerly line of Jackson Street and distant 60.14 ft. therefrom of Lot 2,and
all of Lot 3, Block 26, City of St.Paul.
RESOLVED FURTHER, That the Commissioner of Public Works be and is hereby instructed and
directed to prepare plans and specifications for said improvement, and the proper city officials are hereby
authorized and directed to proceed w th tl a king of said improvement in accordance therewith.
Adopted by the Council__ 19 9
,� �� f City Clerk.
Approved—
App
PUBLISHED -4 _L
f - Mayor.
Councilmen:
Gibbons
Halvorson
Holland
Marzitelli
Mortinson
Peterson
Mr. President, Dillon
seo 7-55 oigipoio
CITY OF ST. PAUL 17 303
.I DEPARTMENT OF FINANCE
REPORT OF COMMISSIONER OF FINANCE 177013
ON PRELIMINARY ORDER
(D)
In the matter of condemning and taking an easement to construct and maintain a street lighting
system on East Fourth Street to include all conduits, light fixtures, conduit risers and such
other equipment as may be necessary to operate a public street lighting system on the wall or
walls of the buildings on that part lying westerly of a line parallel with the present west-
erly line of Jackson Street and distant 60.14 ft. therefrom of Lot 2, and all of Lot 3,
Block 26, City of St. Paul.
under Preliminary Order approved February 8, 1956
To the Council of the City of St. Paul:
The Commissioner of Finance hereby reports as follows:
cost of the above *mealiest
$5.00
The total estimated a x 4hsasseaeabe -t a ve+a�st t is - - - $
The estimated cost per foot for the above improvement is - - - - - - - $
The lots or parcels of land that may be ' `)` .' ', ■S . ` ' orasu®ci improvement, and the assessed valuation of each lot or
parcel as last reported by the Assessor, are as follows:
DESCRIPTION LOT LOCK ADDITION Land .ASSESSED
VALUATION
City of St. Paul j 1
That part lying westerly of a line
parallel with the present westerly
line Jackson St., and distant 60.11i
ft. therefrom of 2 26 ' do j 8300. 9600.
3 26 do !� 9900. 8300.
•
1 i I
j
The Commissioner of Finance further reports that he has investigated all of the aforesaid matters, and
hereby submits the foregoing as his report thereon to the Council, together with the report made to him in
reference to said matter by the Commissioner of Public Works.
Dated March 6 19 56 _. A.,
Commissioner of Fin s :'.
Form B.S.A.8-5 D
_ ._ / 3-2 s"/
•
Office of the Commissioner of Public Works
Report to Commissioner of Finance
February 20 , 19 _
To the Commissioner of Finance of the City of Saint Paul:
The Commissioner of Public Works, having had under consideration the preliminary order of the
Council, known as Council File No. 176709 approved February a 1966, relative to
condemning and taking an easement to construct and-maintain a street lighting
system on East Fourth Street to include all conduits, light fixfpraa, conduit
risers and such other equipeent as may be necessary to operate a public street
lighting system on the wall or walls of the buildings on that part lying westerly
of a line parallel with the present westerly line of Jackson Street and distant
60.14 ft. therefrcn of Lot 2, and all of Lot 3, Block 26, City of St. Paul.
and having investigated the matters and things referred to therein, hereby reports:
1. Said improvement is necessary and (or) desirable.
2. The estimated cost thereof is $ x=xm —, and the total cost thereof is $
and the nature and extent of said improvement is as follows:
3. A plan, profile or sketch of said improvement is hereto attached and made a part hereof.
4. fila
5. Said improvement is asked for upon petition of three or more owners of p
subject to assessment for said improvement. FRANK D. MI�RZ���
4 •
kfhi W./ Co iss'.ne .f s
� •
01
oc I
S
tit jbr5
tiQ �ho
N • .
16' ° //OSY,2dl'
.o� m
,
N
0
kk
•
h
h\ e
OVV