Loading...
176293 - 7 D. A. _ r'.�. thw d .�!m 76293 Orisinal to City Clerk Gl t COUNCIL NO. OFFICE OF INE-CITY CLERK .0 L RESOL�TIO GENERAL FORM PRESENTED BY ,� is,/ . f COMMISSIONS 4"�/-d�_ �.a��i �- DATF WHEREAS, In the rading, paving and improvement of Fourth St. from Seven Corners to Peter St., Comptroller's Contract L-5536-A Otto B. Ashbach & Sons, Inc. contractors, conditions arose upon the removal of the old pavement requiring extensive Additions to the con- tract to be ordered by the engineer, such Additions being compensated for in part by increased payment to the City from the St.Paul City Railway Company for extra costs incurred by the contractor due to the old cableway ducts and yokes, and also Additions for the removal of unsuitable old concrete base and raising the level of sunken portions of the old base, together with the reconstruction or replacing of additional old curbing, the greater part of which work being covered by unit bid prices and by change prices listed in the contract, and which items are covered by the following listing of Additions and Deductions, as per attached list: WHEREAS, the Total net Addition is $4,558.32, now therefore, be it RESOLVED, That the City of St. Paul through-c its City Council approves the foregoing Addition made in accordance th the spec- ifications in the sum of $4,558.32, said sum to be added to the lump sum consideration named in the contract, known as Comptroller's Contract L-5536-A, for the making of the above improvement. The Commissioner of Public Works has agreed with the above named contractor that the sum of $4,558.32 is the correct amount to be added to the above contract. OTT B. ASHBACH ONS,INC. , // By . . _ . I ..�_...._.. . / Avi 4,/,/,/ 0 W r , • r--C .. COUNCILMEN Adopted by the Counci J, 5 195_ Yeas Nays `v Gibbons JAN c- ?rilcr- Halvorson `Approve I 195_ Holland. 1 // / / Marzitelli n Favor Al /,_ / 4. .A.... ii - Mortinson Mayor Peterson Against l Mr. President, Dillon 5M 6.55 I2 PUBLISHED s Y - - I 76293 ADDITIONS 26 Sq.Yds Remove Monolithic concrete Sidewalk @ 0.50 13.00 13.3 " Remove Concrete Base @ 1.10 14.63 130 Lin.Ft. Remove Granite Curb @ 0.30 39.00 37 Sq.Yds Remove present pavement @ 1.50 55.50 67 Sq.Ft. Construct Monolithic conc.Sidewalk @ 0.40 26.80 140.9 Lin.Ft. Construct 7"x18" Radius conc.Curb @ 1.90 267.71 5.0 Lin.Ft. Construct 7"x18" Straight " " @ 1.80 9.00 108 Lin.Ft. Reset Stone Curb @ 1.40 151.20 330.4 Lin.Ft. "x 7" Expansion Joint Material @ 0.10 33.04 4 Lin.Ft. Rebuild Catch Basin @ 10.00 40.00 2 Construct 24" Side Inlets @ 25.00 50.00 6 Lin.Ft. Place 12" V.C. Pipe @ 2.50 15.00 33,5 Cu.yds Class "A" H.E. Conc. Levelling Course @ 24.00 804.00 Extra cost of tie removal and fine grading in track area due, to presence of steel yokes under street car tracks(Billed against St. Railway Co. ) 1942 Lin.Ft. @ 1.60 3,107.20 Extra concrete to replace broken base adjacent to track removal area- 86.05 Cu.Yds Class "A" H.R. Concrete base @ 24.00 2,065.20 (13.3 CusYds. to be billed against Northern States Power Co. for filling utility holes) Removing steel pole stubs 96.74 TOTAL ADDITIONS $ 6,788.02 DEDUCTIONS 235 Tons Class "C" Xii5E17737: Binder Course @ 8.90 2,091.50 28 Sq.Yds Remove Asphalt Surfacing @ 1.15 32.20 64 Lin.Ft Reset Stone Curb 0 1.40 89.60 12.8 Sq.Yds Remove Monolithic Concrete Sidewalk 0 0.50 6040 1 Reu ild Catch Basin © 10.00 10.00 TOTAL DEDUCTIONS $ 2,229.70 ........0.= TOTAL NET ADDITIONS $ 4,558.32 .76293 ADDITIONS 26 Sq.Yds Remove Monolithic concrete Sidewalk @ 0.50 13.00 13.3 " Remove Concrete Base @ 1.10 14.63 130 Lin.Ft. Remove Granite Curb @ 0.30 39.00 37 Sq.Yds Remove present pavement @ 1.50 55.50 67 Sq.Ft. Construct Monolithic conc.Sidewalk @ 0.40 26.80 140.9 Lin.Ft. Construct 7"x18" Radius conc.Curb @ 1.90 267,71 5.0 Lin.Ft . Construct 7"x18" Straight " " @ 1.80 9.00 108 Lin.Ft. Reset Stone Curb @ 1.40 151.20 330.4 Lin.Ft. "x 7" Expansion Joint Material @ 0.10 33.04 4 Lin.Ft. Rebuild Catch Basin @ 10.00 40.00 2 Construct 24" Side Inlets @ 25.00 50.00 6 Lin.Ft. Place 12" V.C. Pipe © 2.50 15.00 33.5 Cu.yds Class "A" H.E. Conc. Levelling Course @ 24.00 804.00 Extra cost of tie removal and fine grading in track area dun- to presence of steel yokes under street car tracks(Billed against St. Railway Co. ) 6 i4o 1942. Lin.Ft. @ 1,60 3,107.20 Extra concrete to replace broken base adjacent to track removal area- 86.05 Cu.Yds Class "A" H.E. Concrete base @ 24.00 2,065.20 (13.3 Cu.Yds. to be billed against Northern States Power Co. for filling utility holes) .5/77.T - 4 jj./- - 1 / Removing steel pole stubs 96.74 TOTAL ADDITIONS $ 6,788.02 DEDUCTIONS 235 Tons Class "C" Asphal.conc. Binder Course @ 8.90 2,091.50 28 Sq.Yds Remove Asphalt Surfacing @ 1.15 32.20 64 Lin.Ft Reset Stone Curb @ 1.40 89.60 12.8 Sq.Yds Remove Monolithic Concrete Sidewalk @ 0.50 6.40 1 Reu ild Catch Basin @ 10.00 10.00 TOTAL DEDUCTIONS $ 2,229.70 TOTAL NET ADDITIONS $ 4,558.32 Duplicate to Printer 176293 FILE CITY OF ST. PAUL NCIL NO. OFFICE OF THE CITY CLERK COUNCIL RESOLUTION—GENERAL FORM PRESENTED BY COMMISSIONER DATF WHEREAS, In the regrading, paving and improvement of Fourth St. from Seven Corners to St. Peter Step Comptroller's Contract L-5536-A Otto B. Ashbach & Sons, Inc. contractors, conditions arose upon the removal of the old pavement requiring extensive Additions to the con+- tract to be ordered by the engineer, such Additions being compensated for in part by increased payment to the City from the St.Paul City Railway Company for extra costs incurred by the contractor due to the old cableway ducts and yokes, and also Additions for the removal of unsuitable old concrete base and raising the level of sunken portions of the old base,, together with the reconstruction or replacing of additional old curbing, the greater part of which work being covered by unit bid prices and by change prices listed in the contract, and which items are covered by the following listing of Additions and Deductions, as per attached list: WHEREAS, the Total net Addition is $4,558.32, now therefore, be i t RESOLVED, That the City of St. Paul through its City Council approves the foregoing Addition made in accordance with the s 04 ifications in the sum of $4 0 558.32, said sum to be added to the lump am sum consideration named in the contract, known as Comptroller's Contract L-5536-A, for the 'making of the above improvement. The Commissioner of Public Works has agreed with the above named contractor that the sum of $4,558.32 is the correct :amount to be added to the above contract. OTTO 4 . ASHBACH �, :CS, INC. ;'` 11/ ' '.."--6 a is S C:,,. R " '' 13 R� WOKS COUNCILMEN Adopted by the Council , ►. r _195— Yeas Nays / Gibbons JJ 1 Jn Halvorson Approved 195_ Holland Marzitelli / In Favor Martinson Mayor Peterson Against Mr. President, Dillon `5M 6-55 2