Loading...
179969 • Council File No HasoLTAtola swTtFTINo 179,969 ASSi88911111lpT B` C1 #79 oil File No. 60- y a In the;matter of th @; e5t of ts.`costs and expenses. glad- ing and surfacing with.bbitum1ne zs ma- terial the in Block 8.,Twin City View,and Tarts A B. 7. ii and 9.Neal CITY OF ST. PAUL Resolution Ratifying Assessment In the matter of the assessment of benefits, costs and expenses for grading and surfacing with bituminous material the alley in Block 5, Twin City View, and in Lots A, B, 7, 8 and 9, Ideal Homesites, from Scheffer Ave. to Hartford Ave., under Preliminary Order 1721142 , Intermediary Order 172568 , Final Order 17.931 . approved lay 3 19 55 A public hearing having been had upon the assessment for the above improvement, and said assessment having been further considered by the Council, and having been considered finally saitisfactory, be it therefore RESOLVED, That the said assessment be and the same is hereby in all respects ratified, and the same is hereby ordered to be submitted to the District Court of the County of Ramsey for confirmation. BE IT FURTHER RESOLVED, That the said assessment be and it is hereby determined to be payable in I Q equal installments. OCT 101956, Adopted by the Council_ 19 C 9 1 0 195 Approved 19 4 Alior ,/ 46144I PUBLISHED/D—/../--T4%. ... , ■ ayor. Form B. B. 18 File 12922 • • CITY OF ST. PAUL 79572 OFFICE OF THE COMMISSIONER OF FINANCE Report of Completion of Assessment �� , hod • September 11 19 56 In the matter of the assessment of benefits, costs and expenses for grading and surfacing with bituminous ae.terial the alley in Block 5, Twin City View, and in Lots A, B, 7, 8 and 9, Ideal Homesites, from Scheffer Ave. to Hartford Ave., under Preliminary Order 172142 , approved March 1, 1955 Intermediary Order 172568 , approved April 5, 1955 Final Order 172934 , approved May 3, 1955 To the Council of the City of St. Paul: The Commissioner of Finance hereby reports to the Council the following as a statement of the ex- penditures necessarily incurred for and in connection with the making of the above improvement, viz: Cost of construction. L-5592 5,538.50 Engineering $ 330.00 Inspection fees $ Postal cards. $ 1.38 Publications $ 10.35 Court costs for confirmation $ 3.45 Total expenditures 5,883.68 Said Commissioner further reports that he has assessed and levied the total amount as above ascer- tained, to-wit: the sum of $ 5,883.68 upon each and every lot, part or parcel of land deemed benefited by the said improvement, and in the case of each lot, part or parcel of land in accordance with the benefits conferred thereon; that the said assessment has been completed, and that hereto attached, identified by the signature of the said Commissioner, and made a part hereof, is the said assessment as completed by him, and which is herewith submitted to the Council for such action thereon as may be considered proper. 4i t 2M 12-52 8 Commissioner of Financ "f