180503 r 1 Original to City Clerk . g )5 03 f CITY OF ST. PAUL writ. NO. OFFICE OF THE CITY CLERK U CIL RESOLUTION—GENERAL FORM PRESENTED BY COMMISSIONER DATF WHEREAS, Additions and Deductions which might prove to be necessary in the improvement described as the Grading and Paving of Maryland Avenue from Western Avenue to Abell St. , Comptroller's Contract L-5654, Thornton Bros. Co. , contractor,have been provided for in the specifications at unit prices stipulated herein, and WHEREASr,. It has been found necessary to make the following Additions and Deductions: as per attached statement : WHEREAS, The Total net Addition is $1,835.31, now therefore be it RESOLVED, That the City of St. Paul through its City Council approves the foregoing Addition made in accordance with the spec- ifications in the sum of $1,835.31, said sum to be added to the lump sum consideration named in the contract, known as Comptroller's Contract L-5654, for the making of the above improvement. The Commissioner of Public Works has agreed with the above named contractor that the sum of $1,835.31 is the correct amount to beaded to the a bove contract. &awe Elle No. 180605 $7 Vett F. which Might ;SS the impre r Grading , sit Thornton Bros. Co. nue t2 �B tcaaet„ to St, ® provided for din the apeciflea a at By unit beau r iowis as per statement: 1 $1�aus, a'Total : won 1s' ,i w /'- :31, no therefore be it I / • �''�d Resolved, . . the City.of 8t Paull /_ foregvhar through i w' tin Comm, aade 'a+�erorrd i Commis •_'ion=•�- o ..a Jrr or • ,, speclficati in the awn of 51,836.51, said sum to die a dad the lump confider tract, known as s `abbov ro emwt . P &t'woska' has aid the above n con 2 7 1956 tractor that a sum of$1.85631 is the COUNCILMEN correct ro° be a te, the Adopted by the Council 195_ above co . Yeas Nays Adopted bp-the Coutscil November 27, DeCourcy 1 w6 Approved giber 1,27. 4256)e. NOV 2 7 poolliftegftem'imisrattrofteft — Approved 195_ 410111-* AP4uri Mortinson n Favor AROP ar tea f, ml "IAeg Mayor Rosen gainst legalliNgiandaa Mr.v 1'robirett (Pearson) 5M 5-55 ADDITIONS Remove 2 Catch Basins @ 10.00 20.00 Const. 1-A.C.B. @ 120.00 120.00 Repair Broken C.B. connection pipe (Equipment & Labor $49,50,Material $5.00) @ 54.50 Remove 77.8 L.Ft. concrete curb @ 0.25 19.45 Const. 52.3 L.Ft. new 7" x 18" Str.conc.curb @ 1.80 94.14 Const. 51.1 L.Ft. new 7" x 18" rad.conc.curb @ 1.90 97.09 Const. 12.85 S.Yds 6" Driveway Pavement @ 4.60 59.11 Remove 5.1 S.Yds Mono. sidewalk @ 0.50 2.55 Const. 20 S•Yds 8" one course conc.pavement @ 5.50 110.00 Const. 24" Side Inlet @ 25,00 25.00 Add cost of H.E. conc. used at Gaultier intersection 49V2 Cu.Yds @ 3.00 148.50 Const. 2--4A Catchbasins @ 70.00 140.00 Const. 3 L.Ft. 12"VCP catchbasin conn. @ 4.00 12.00 Furnish & install 1. conc. catch basin cover @ 15.00 15,00 Adjust Manhole Frame @ 12.00 12,.00 Furnish & install castings "A" & "R" @ 40.00 40.00 Const. 5.5 L.Ft. 12" VCP Catchbasin coon. @ 2.50 13075 Relay 9.5 L.Ft. 12" VCP @ 2.50 23.75 Remove Curb west of Abell (Compressor 4 hrs @ 4.50 18.000 Jackhammer man 4 hrs @ 2.40 9.60) 27.60 Removal Trees for Grading Cottage Ave. with surplus excavation material from Maryland 10 trees under 14" @ 40.00 400.00 11 " 21" to 36" @ 65.00 715.00 1 tree over 36" @ 75.00 75.00 Add cost for increasing cement content in curb work to 1956 specifications from Rice to Western 75.7 sacks cement @ 1.50 113.55 Total Additions 2,337.99 DEDUCT IONS Rebuild Catchbasin @ 40.00 40,00 Const. 67.6 Lin.Ft. Straight Conc.Curb @ 1.80 121.68 Const. 2 4A Catch Basins @ 70.00 140.00 Const 44 Lin.Ft. 12" VCP Pipe @ 4000 176.00 Const. 1--24" Side Inlet @ 25.00 _25.00 Total Deductions 502.68 TOTAL NET ADDITIONS $ 1,835.31 ADDITIONS 5 Remove 2 Catch Basins @ 10.00 20.00 Coast. 1-A.C.B. @ 120,00 120.00 Repair Broken C.B. <connection pipe (Equipment & Labor $49.50,.Material $5.00) @ 54.50 Remove 77.8 L.Ft. concrete curb @ 0.,25 19,45 Coast. 52.3 L.Ft. new 7" x 18" Str.conc.;curb 0 1.80 94.14 Coast, 51.1 L,Ft. new 7" x 18" rad.conc.curb @ 1.90 97.09 Coast. 12.85 S.ids 6" Driveway Pavement @ 4#60 59.11 Remove 5.1 SY"ds Mono, sidewalk .�0 2.55 Coast. 20 S.Yds 8" one course conc.pavement @ 5.00 110.00 Coast. 24" Side inlet, @ 25.00 25.00 Add cost of H.E.' conc. used at Gaultier intersection 491$ Cu.Yds @ 3.00 148..50 Coast. 2--4A Catchbasins, @ 70.00 00 Coast. 3 L.Ft. 12"VCP catthbasin corm. 0 4,.00 12.00 Furnish & install 1: conc. catch basin cover 0 15.00 15.00 Adjust Manhole . Frame @ 12.00 12.00 Furnish & install castings "A" & "B" 0 40.00 40..00 Coast. 5.5 Z..Ft, 12" VCP Catchbasin coon. 0 2,50 13.75 Relay 9.5 L.Ft. 12° VCP r. 2.50 23.15 Remove Curb west of Abell (Compressor 4 hrs 0 4.50 18,00 Jackhammer man 4 hrs 0 2.40 9.b0) 27.60 Removal Trees for Grading Cottage Ave. with surplus excavation material from Maryland 10 trees under 14" 0 40.00 400.00 11 " 21" to 36" 0 65.00 715.00 1 tree over 36" 0 75.00 75.00 Add cost. for increasing cement content in curb work to 1956 specifications from Rice to Western 75.7 sacks cement 0 1.50 113.55 Total Additions 2,337.99' DEDUCTIONS Rebuild Catchbasin @ 40.00 40.00 Coast. 67.6 Lin..Pt. Straight Conc.Curb 0 1.80` 121.68 Coast. 2 4A Catch Basins 0 70.00 140.00 Coast 44 Lin.Ft• 12" 'MCP Pipe 0 4.00 176..00 Coast. 1 . 24" Side Inlet 0 25.00 25.00 Total Deductions 502.68 TOTAL NET ADD IT ICES $ 1,835.31 p ll Duplicate to Printer Fi3 CITY OF ST. PAUL COUNCIL Na OFFICE OF THE CITY CLERK COUNCIL RESOLUTION—GENERAL FORM PRESENTED BY COMMISSIONER DATF WHEREAS, Additions and Deductions which might prove to be necessary in the improvement described as the Grading and Paving of Maryland Avenue from Western Avenue to Abell St. , Comptroller's Contract 10.5654, Thornton Bros. Co., contractor,have been provided for in the specifications at unit prices stipulated herein, and HEREA§4. It has been found necessary to make the following Additions and Deductions: as per attached statement: WHEREAS, The Total net Addition is $1,835.31, now therefore be it RESOLVED, That the City of St. Paul through its City Council approves the foregoing Addition made in accordance with the spec i'fications in the sum of $1,835.31, said sum to be added to the lump sum consideration named in the contract, known as Comptroller's Contract L-5654, for the making of the above improvement. The Commissioner of Public Works has agreed with the above named contractor that the sum of $1,835.31 is the correct amount to be added to the above contract. Thornton Bros. Co. By #z6!1....6z-xa4,---- COMM l Ober of A1re1 ` 11 2 7 l'956 COUNCILMEN Adopted by the Council 195_ Yeas Nays DeCourcy Witt 2 7 'IB unl,and.„ 7/ Approved 195- `"- Marzitellag Mortinson 7 Tn Favor F---Peterson Mayor Rosen Against My.We President (Peterson) 5M 6.56 �.."..: