CITY OF ST. PAUL writ. NO.
OFFICE OF THE CITY CLERK
U CIL RESOLUTION—GENERAL FORM
PRESENTED BY
COMMISSIONER DATF
WHEREAS, Additions and Deductions which might prove to be
necessary in the improvement described as the Grading and Paving
of Maryland Avenue from Western Avenue to Abell St. , Comptroller's
Contract L-5654, Thornton Bros. Co. , contractor,have been provided
for in the specifications at unit prices stipulated herein, and
WHEREASr,. It has been found necessary to make the following
Additions and Deductions:
as per attached statement :
WHEREAS, The Total net Addition is $1,835.31, now therefore
be it
RESOLVED, That the City of St. Paul through its City Council
approves the foregoing Addition made in accordance with the spec-
ifications in the sum of $1,835.31, said sum to be added to the
lump sum consideration named in the contract, known as Comptroller's
Contract L-5654, for the making of the above improvement.
The Commissioner of Public Works has agreed with the above
named contractor that the sum of $1,835.31 is the correct amount
to beaded to the a
bove contract.
&awe Elle No. 180605 $7 Vett F.
which Might ;SS the impre
r
Grading , sit Thornton Bros. Co.
nue
t2 �B tcaaet„ to St,
®
provided for din the apeciflea a at By
unit
beau r iowis
as per statement: 1
$1�aus, a'Total : won 1s' ,i w /'-
:31, no therefore be it I / • �''�d
Resolved, . . the City.of 8t Paull /_
foregvhar through i w' tin Comm,
aade 'a+�erorrd i Commis •_'ion=•�- o ..a Jrr or •
,, speclficati in the awn
of 51,836.51, said sum to die a dad
the lump confider
tract, known as s
`abbov ro emwt . P &t'woska'
has aid the above n con 2 7 1956
tractor that a sum of$1.85631 is the
COUNCILMEN correct ro° be a te, the Adopted by the Council 195_
above co .
Yeas Nays Adopted bp-the Coutscil November 27,
DeCourcy 1 w6
Approved giber 1,27.
4256)e. NOV 2 7
poolliftegftem'imisrattrofteft — Approved 195_
410111-* AP4uri
Mortinson n Favor AROP
ar tea f, ml "IAeg Mayor
Rosen gainst
legalliNgiandaa
Mr.v 1'robirett (Pearson)
5M 5-55
ADDITIONS
Remove 2 Catch Basins @ 10.00 20.00
Const. 1-A.C.B. @ 120.00 120.00
Repair Broken C.B. connection pipe
(Equipment & Labor $49,50,Material $5.00) @ 54.50
Remove 77.8 L.Ft. concrete curb @ 0.25 19.45
Const. 52.3 L.Ft. new 7" x 18" Str.conc.curb @ 1.80 94.14
Const. 51.1 L.Ft. new 7" x 18" rad.conc.curb @ 1.90 97.09
Const. 12.85 S.Yds 6" Driveway Pavement @ 4.60 59.11
Remove 5.1 S.Yds Mono. sidewalk @ 0.50 2.55
Const. 20 S•Yds 8" one course conc.pavement @ 5.50 110.00
Const. 24" Side Inlet @ 25,00 25.00
Add cost of H.E. conc. used at Gaultier
intersection 49V2 Cu.Yds @ 3.00 148.50
Const. 2--4A Catchbasins @ 70.00 140.00
Const. 3 L.Ft. 12"VCP catchbasin conn. @ 4.00 12.00
Furnish & install 1. conc. catch basin cover @ 15.00 15,00
Adjust Manhole Frame @ 12.00 12,.00
Furnish & install castings "A" & "R" @ 40.00 40.00
Const. 5.5 L.Ft. 12" VCP Catchbasin coon. @ 2.50 13075
Relay 9.5 L.Ft. 12" VCP @ 2.50 23.75
Remove Curb west of Abell
(Compressor 4 hrs @ 4.50 18.000
Jackhammer man 4 hrs @ 2.40 9.60) 27.60
Removal Trees for Grading Cottage Ave. with
surplus excavation material from Maryland
10 trees under 14" @ 40.00 400.00
11 " 21" to 36" @ 65.00 715.00
1 tree over 36" @ 75.00 75.00
Add cost for increasing cement content
in curb work to 1956 specifications
from Rice to Western
75.7 sacks cement @ 1.50 113.55
Total Additions 2,337.99
DEDUCT IONS
Rebuild Catchbasin @ 40.00 40,00
Const. 67.6 Lin.Ft. Straight Conc.Curb @ 1.80 121.68
Const. 2 4A Catch Basins @ 70.00 140.00
Const 44 Lin.Ft. 12" VCP Pipe @ 4000 176.00
Const. 1--24" Side Inlet @ 25.00 _25.00
Total Deductions 502.68
TOTAL NET ADDITIONS $ 1,835.31
ADDITIONS 5
Remove 2 Catch Basins @ 10.00 20.00
Coast. 1-A.C.B. @ 120,00 120.00
Repair Broken C.B. <connection pipe
(Equipment & Labor $49.50,.Material $5.00) @ 54.50
Remove 77.8 L.Ft. concrete curb @ 0.,25 19,45
Coast. 52.3 L.Ft. new 7" x 18" Str.conc.;curb 0 1.80 94.14
Coast, 51.1 L,Ft. new 7" x 18" rad.conc.curb @ 1.90 97.09
Coast. 12.85 S.ids 6" Driveway Pavement @ 4#60 59.11
Remove 5.1 SY"ds Mono, sidewalk .�0 2.55
Coast. 20 S.Yds 8" one course conc.pavement @ 5.00 110.00
Coast. 24" Side inlet, @ 25.00 25.00
Add cost of H.E.' conc. used at Gaultier
intersection 491$ Cu.Yds @ 3.00 148..50
Coast. 2--4A Catchbasins, @ 70.00 00
Coast. 3 L.Ft. 12"VCP catthbasin corm. 0 4,.00 12.00
Furnish & install 1: conc. catch basin cover 0 15.00 15.00
Adjust Manhole . Frame @ 12.00 12.00
Furnish & install castings "A" & "B" 0 40.00 40..00
Coast. 5.5 Z..Ft, 12" VCP Catchbasin coon. 0 2,50 13.75
Relay 9.5 L.Ft. 12° VCP r. 2.50 23.15
Remove Curb west of Abell
(Compressor 4 hrs 0 4.50 18,00
Jackhammer man 4 hrs 0 2.40 9.b0) 27.60
Removal Trees for Grading Cottage Ave. with
surplus excavation material from Maryland
10 trees under 14" 0 40.00 400.00
11 " 21" to 36" 0 65.00 715.00
1 tree over 36" 0 75.00 75.00
Add cost. for increasing cement content
in curb work to 1956 specifications
from Rice to Western
75.7 sacks cement 0 1.50 113.55
Total Additions 2,337.99'
DEDUCTIONS
Rebuild Catchbasin @ 40.00 40.00
Coast. 67.6 Lin..Pt. Straight Conc.Curb 0 1.80` 121.68
Coast. 2 4A Catch Basins 0 70.00 140.00
Coast 44 Lin.Ft• 12" 'MCP Pipe 0 4.00 176..00
Coast. 1 . 24" Side Inlet 0 25.00 25.00
Total Deductions 502.68
TOTAL NET ADD IT ICES $ 1,835.31
p ll
Duplicate to Printer Fi3
CITY OF ST. PAUL COUNCIL Na
OFFICE OF THE CITY CLERK
COUNCIL RESOLUTION—GENERAL FORM
PRESENTED BY
COMMISSIONER DATF
WHEREAS, Additions and Deductions which might prove to be
necessary in the improvement described as the Grading and Paving
of Maryland Avenue from Western Avenue to Abell St. , Comptroller's
Contract 10.5654, Thornton Bros. Co., contractor,have been provided
for in the specifications at unit prices stipulated herein, and
HEREA§4. It has been found necessary to make the following
Additions and Deductions:
as per attached statement:
WHEREAS, The Total net Addition is $1,835.31, now therefore
be it
RESOLVED, That the City of St. Paul through its City Council
approves the foregoing Addition made in accordance with the spec
i'fications in the sum of $1,835.31, said sum to be added to the
lump sum consideration named in the contract, known as Comptroller's
Contract L-5654, for the making of the above improvement.
The Commissioner of Public Works has agreed with the above
named contractor that the sum of $1,835.31 is the correct amount
to be added to the above contract.
Thornton Bros. Co.
By #z6!1....6z-xa4,----
COMM l Ober of A1re1 `
11 2 7 l'956
COUNCILMEN Adopted by the Council 195_
Yeas Nays
DeCourcy Witt 2 7 'IB
unl,and.„ 7/ Approved 195-
`"- Marzitellag
Mortinson 7 Tn Favor
F---Peterson Mayor
Rosen Against
My.We President (Peterson)
5M 6.56 �.."..: