Loading...
181019 1 Original to City Clark ' ' • 181019 CITY OF ST. PAUL COUNCIL NO. OFFICE OF THE CITY CLERK Council Pile No. 181019-r-By Barnard COUNCIL RE •LUTI•N—GENE' . L FORM T* $° ``*Y"quest— PRESENTED BY ! the imps A ee COMMISSIONED ��-� <, DATF E� �1 tk= ANEW E �'kart been WHEREAS, ADDITIONS AND DEDUCTIONS which might prove to be necessary in the improvement described as the Repaving of Fifth St. from Jackson to Broadway, Comptroller's Contract L-5778, Okes Co. contractors, have been provided for in the specifications at unit prices stipulated herein, and WHEREAS, It has been found necessary to make the following ADDITIONS AND DEDUCTIONS as per attached statement : WHEREAS, The total net Addition is $1,879.53, now therefore, be it RESOLVED, That the City of St. Paul through its City Council approves the foregoing Addition made in accordance with the specifications in the sum of $1,879.53, said sum to be added to the lump sum consideration named in the contract, known as Comptroller's Contract L-5778, for the making of the above improvement. The Commissioner of Public Works has agreed with the above named contractor that the sum of $1,879.53 is the correct amount to be added to the above contract. 0 , P ' Y By Ole FRAN ,D. ZITLLLI : / .• • 1:747L Comm®'. / ig tv •.Wort 9195'7 COUNCILMEN Adopted by the Council JO 195_ Yeas Nays Gibbons JAN 91951 Halvorson n Approved 195_ Holland �. Favor I( -..?4 -. Mortinson Mayor Peterson --.V_Against Mr.President, Dillon PUBLISHED /—/a.—6-7 5M 6.55 we 18119 Duplicate to Printer CITY OF ST. PAUL COUNCIL NO. OFFICE OF THE CITY CLERK COUNCIL RESOLUTION—GENERAL FORM PRESENTED BY COMMISSIONER DATF WIEREAS, ADDITIONS AND DEDUCTIONS which might prove to be necessary in the improvement described as the Repaving of Fifth St. from Jackson to Broadway, Comptroller Contract t..e577S, Ckes Co. contractors, have been provided for in the specifications at unit prices stipulated herein, and WHEREAS, it has been found necessary to make the following ADDITIONS AND DEDUTIONS as per attached statement: WHEREAS, The total net Addition is $3,879•53, now therefore, be it RESOLVED, That the City of St. Paul through its City Council approves the foregoing Addition made in accordance with the specifications in tha stall of $1,879.53, said sum to be added to the lump sum consideration named in the contract, known as Comptroller's Contract L-5778, for the making of the above improvement. The Commissioner of Public Works has, agreed with the above named contractor that the sum of $1,879.53 is the correct amount to be added to the above contract. Ok- .,. !y By de& 1... ivA.7(5,12LLI commis u.s-t ones of Public rlorks UiL!VYul�iKs 9 1967 COUNCILMEN Adopted by the Council JAN 195_ Yeas Nays Gibbons Halvorson Approved 195_ Holland r,.,Mar efl In Favor Mortinson ,�^� Mayor Peterson ��°_Against Mr. President, Dillon M 6-55 2 ADDITIONS 181019 39.6 Sq.Yds Remove present pavement (inc. surfacih ) @ 1.50 59.40 312 L. Ft . " " granite curb @ .30 93.60 10.3 Tons Class "A" Asph. Conc. Wearing Course @ 11.00 113.30 7.2 " Class "C" " " Binder " @ 10.00 72.00 89.5 Sq.Yds Rubberized . Seal Coat @ 0.20 17.90 89.5 " Bituminous Tack Coat @ 0.02 1.79 53.6 H 7" Concrete Base (H.E. ) @ 5.38 288.37 254.3 L. Ft. 7"X18" Straight Concrete Curb @ 1.85 470.45 61.8 L. Ft. 7"X18" Radius Concrete Curb @ 2.00 123.60 224.6 L.Ft . Granite Curb to reset @ 1.80 404.28 1 Side Inlet to remove @ 5.00 5.00 1 24" " " " construct @ 30.00 30.00 3 24" " " Holes in Curb @ 2.00 6.00 117 L.Ft. Single cell duct line @ 0.75 87.75 120 L•Ft. Two cell duct line @ 1.20 144.00 239 L.Ft. Trimming & Refacing curb @ 1.00 239.00 41.9 Sq.Yds Remove asphalt surfacing @ 1.15 _ 48 19_N TOTAL tilit ADDITIONS , x , 2,204.63 DEDUCTIONS 241 L. Ft. Saw Joints to Cut @ 1.10 265.10 2 Manholes to adjust @ 20.00 40.00 1 Cat chbas in to adjust C 20.00 _ 20.00_ Total Deductions 325.10 TOTAL NET ADDITIONS 1,879.53 ADD IT IONS t 39.6 Sq.Yds Remove present pavement(inc. surfacing) .) 1.50 59.40 312 L. Ft. " " granite curb @ ,30 93.60 10.3 Tons Class "A" Asph. Conc. Wearing Course © 11.00 113.30 7,,2 " Class "C" " " Binder " @ 10.00 72.00 C'89.5 Sq.Yds Rubberized Seal Coat © 0.20 17.90 89.5 ,. Bituminous Tack Coat w 0.02 1.79 53.6 " 7" Concrete Base (H.E. ) @ 5,38 288.37 254,3 L, Ft, 7'X18" Straight Concrete Curb 0 1,85 470.45 61.8 L. Ft. 7"X18" Radius Concrete Curb © 2.00 123,60 224.6 L.Ft . Granite Curb to reset e 1.80 404.28 1 Side Inlet to remove @ 5.00 5,00 1 24" " " " construct C` 30.00 30.00 3 24" ,t " Holes in Curb C;s 2000 6.00 117 L.Ft. Single cell duct line cc) 0.75 87.75 120 L.Ft, Twc cell duct line @ 1.20 144.00 239 L.Ft. Trimming & Refacing curb C 1.00 239.00 41:9 Sq,Yds Remove asphalt surfacing C 1.15 48.19 TOTAL War ,ADQITIONS 2,204.53 DEDUCTIONS IONS 241 L. Ft, Saw Joints to Cut @ 1.10 265.10 2 Manholes to adjust @ 20.00 40.00 1 Catchbasin to adjust , @ 20.00 20, 00 Total Deductions 325.10 TOTAL NET ADDITIONS 1,879.53