Loading...
181711 Original to City Clerk _ - CITY OF ST. PAUL COUNCIL NCIL NO. - OFFICE OF THE CITY CLERK C. NCIL RESOLUTION—GENERAL FORM PRISENTED COMMISSIONER ' /4.r�t A'/ DATE • I°1711—By Frank D.r---- ` *'^suctions in WHEREAS, ADDITIONS AND DEDUCTIONS which might prove to be necessary in the improvement described as the Repaving of Dale St. from Central to Minnehaha, Comptroller's Contract L-5739, Ashbach Construction Co. contractors, have been provided for in the specifications at unit prices stipulated herein, and WHEREAS, It has been found necessary to make the following ADDITIONS AND DEDUCTIONS as per attached statement: WHEREAS, The total net Deductions are X12,835.03, now therefore, be it RESOLVED, That the City of St. Paul through its City Council approves the foregoing Deduction made in accordance with the specifications in the sum of X12,835.03, said sum to be deducted from the lump sum consideration named in the contract, known as Comptroller's Contract L-5 4i-Et for the making of the above improvement. 5737 The Commissioner of Public Works has agreed with the above named contractor that the sum of : 12,835.03 is the correct amount to be deducted from the above contract. COUNCILMEN Adopted by the Council FEB .zo 195_ Yeas Nays DeCourcy '957 Holland Approved 195- Marzitelli ,,' /F l Mortinson In Favor ( /T"J .T7� Pttei bun Mayor Aotlnc Rosen Against Mr. President, Dillon ,, SM 6-56 ‹2›2 PU�3LISHED -=+1 Duplicate to Printer CITY OF ST. PAUL CLE NCIL Na OFFICE OF THE CITY CLERK COUNCIL RESOLUTION-GENERAL FORM PRESENTED BY COMMISSIONER DATE WHEREAS, ADDITIONS AND DEDUCTIONS which might prove to be necessary in the improvement described as the Repaving of Dale St. from Central to Minnehaha, Comptroller's Contract L-5739, Ashbach Construction Co. contractors, have been provided for in the specifications at unit prices stipulated herein, and WHEREAS, It has been found necessary to make the following ADDITIONS AND DED JCTIONS as per attached statement: WHEREAS, The total net Deductions are $12,335.03, now therefore, be it ;TiESOLVED, That the City of St. Paul through its City Council approves the foregoing Deduction made in accordance with the specifications in the sum of w12,835.031 said sum to be deducted from the lump sum consideration named in the contract, known as Comptroller's Contract L-5-7/t for the _._ king of the above improvement. 5737 The Commissioner of Public Works has agreed with the above earned contractor that the sum of :;12,835.03 is the correct amount to be deducted from the above eeetract. COUNCILMEN Adopted by the Council 195_ Yeas Nays DeCourcy Holland Approved 195- Marzitelli Mortinson In Favor _ „P e Mayor Rosen Against Mr. President, Dillon, 5M 656 \ ce&et80111 181711 Deductions; 11 cu. yds. Excavation 1.25 13.75 39 cu. yds. Embankment 1.25 48.75 166 lin. ft. Remove Sandstone Curb 0.30 49.80 361 tons Asphaltic Concrete Binder Course 10.00 3,610.00 371 cu. yds. Concrete Leveling Course 24.50 9,089.50 370 lin. ft. Sandstone Curb to reset 1.80 666.00 5.9 sq. yds. 6" Mono, Conc. Driveway Pavement 4.60 27.14 117 lin. ft. Saw joints to cut 1.10 128.70 300 sq. yds. Grass Sod 0.35 105.00 3 Manholes to adjust 20.00 60.00 1 Catch Basin to rebuild 40.00 40.00 TOTAL DEDUCTIONS $ 13,838.64 Additions: 419.2 lin. ft. Remove present Conc. Curb 0.25 104,80 317.3 lin. ft. Construct 7" x 18" Straight Cone. Curb 1.85 587.01 98.4 lin. ft. Construct 7" x 18" Radius Cone. Curb 2.00 196.80 3 Catch Basins to adjust 20.00 60.00 1 24" Side Inlet to construct 30.00 30.00 1 Monument to reset 25:.00 25.00 TOTAL ADDITIONS 1,003.61 TOTAL NET DEDUCTIONS - - - -$12,835.03 /i ( "7 1 Deductions: 11 cu. yds. Excavation 1.25 13.75 39 cu. yds. Embankment 1.25 48.75 166 lin. ft. Remove Sandstone Curb 0.30 49.80 361 tons Asphaltic Concrete Binder Course 10.00 3,610.00 371 cu. yds. Concrete Leveling Course 24.50 9,089.50 370 lin. ft. Sandstone Curb to reset 1.80 666.00 5.9 sq. yds. 6" Mono. Conc. Driveway Pavement 4.6o 27.14 117 lin. ft. Saw joints to cut 1.10 128.70 300 sq. yds. Grass Sod 0.35 105.00 3 Manholes to adjust 20.00 60.00 1 Catch Basin to rebuild 40.00 4Q.00 TOTAL DEDUCTIONS ' $ 13,838.64 Additions: 419.2 lin. ft. Remove present Conc. Curb 0.25 104.80 317.3 lin. ft. Construct 7" x 18" Straight Conc. Curb 1.85 587.01 98.4 lin. ft. Construct 7" x 18" Radius Conc. Curb 2.00 196.80 3 Catch Basins to adjust 20.00 60.00 1 24" Side Inlet to construct 30.00 30.00 1 Monument to reset 25.00 25.00 TOTAL ADDITIONS 1,003.61 TOTAL NET DEDUCTIONS - - - -$ 12,835.03