181711 Original to City Clerk
_ - CITY OF ST. PAUL COUNCIL NCIL NO. -
OFFICE OF THE CITY CLERK
C. NCIL RESOLUTION—GENERAL FORM
PRISENTED
COMMISSIONER ' /4.r�t A'/ DATE
• I°1711—By Frank D.r----
` *'^suctions
in
WHEREAS, ADDITIONS AND DEDUCTIONS which might prove to be
necessary in the improvement described as the Repaving of Dale St.
from Central to Minnehaha, Comptroller's Contract L-5739, Ashbach
Construction Co. contractors, have been provided for in the
specifications at unit prices stipulated herein, and
WHEREAS, It has been found necessary to make the following
ADDITIONS AND DEDUCTIONS
as per attached statement:
WHEREAS, The total net Deductions are X12,835.03, now
therefore, be it
RESOLVED, That the City of St. Paul through its City Council
approves the foregoing Deduction made in accordance with the
specifications in the sum of X12,835.03, said sum to be deducted
from the lump sum consideration named in the contract, known as
Comptroller's Contract L-5 4i-Et for the making of the above
improvement. 5737
The Commissioner of Public Works has agreed with the above
named contractor that the sum of : 12,835.03 is the correct amount
to be deducted from the above contract.
COUNCILMEN Adopted by the Council FEB .zo 195_
Yeas Nays
DeCourcy '957
Holland Approved 195-
Marzitelli ,,' /F l
Mortinson In Favor ( /T"J .T7�
Pttei bun Mayor
Aotlnc
Rosen Against
Mr. President, Dillon ,,
SM 6-56 ‹2›2 PU�3LISHED -=+1
Duplicate to Printer
CITY OF ST. PAUL CLE NCIL Na
OFFICE OF THE CITY CLERK
COUNCIL RESOLUTION-GENERAL FORM
PRESENTED BY
COMMISSIONER DATE
WHEREAS, ADDITIONS AND DEDUCTIONS which might prove to be
necessary in the improvement described as the Repaving of Dale St.
from Central to Minnehaha, Comptroller's Contract L-5739, Ashbach
Construction Co. contractors, have been provided for in the
specifications at unit prices stipulated herein, and
WHEREAS, It has been found necessary to make the following
ADDITIONS AND DED JCTIONS
as per attached statement:
WHEREAS, The total net Deductions are $12,335.03, now
therefore, be it
;TiESOLVED, That the City of St. Paul through its City Council
approves the foregoing Deduction made in accordance with the
specifications in the sum of w12,835.031 said sum to be deducted
from the lump sum consideration named in the contract, known as
Comptroller's Contract L-5-7/t for the _._ king of the above
improvement. 5737
The Commissioner of Public Works has agreed with the above
earned contractor that the sum of :;12,835.03 is the correct amount
to be deducted from the above eeetract.
COUNCILMEN Adopted by the Council 195_
Yeas Nays
DeCourcy
Holland Approved 195-
Marzitelli
Mortinson In Favor _
„P e Mayor
Rosen Against
Mr. President, Dillon,
5M 656 \ ce&et80111
181711
Deductions;
11 cu. yds. Excavation 1.25 13.75
39 cu. yds. Embankment 1.25 48.75
166 lin. ft. Remove Sandstone Curb 0.30 49.80
361 tons Asphaltic Concrete Binder Course 10.00 3,610.00
371 cu. yds. Concrete Leveling Course 24.50 9,089.50
370 lin. ft. Sandstone Curb to reset 1.80 666.00
5.9 sq. yds. 6" Mono, Conc. Driveway Pavement 4.60 27.14
117 lin. ft. Saw joints to cut 1.10 128.70
300 sq. yds. Grass Sod 0.35 105.00
3 Manholes to adjust 20.00 60.00
1 Catch Basin to rebuild 40.00 40.00
TOTAL DEDUCTIONS $ 13,838.64
Additions:
419.2 lin. ft. Remove present Conc. Curb 0.25 104,80
317.3 lin. ft. Construct 7" x 18" Straight Cone. Curb 1.85 587.01
98.4 lin. ft. Construct 7" x 18" Radius Cone. Curb 2.00 196.80
3 Catch Basins to adjust 20.00 60.00
1 24" Side Inlet to construct 30.00 30.00
1 Monument to reset 25:.00 25.00
TOTAL ADDITIONS 1,003.61
TOTAL NET DEDUCTIONS - - - -$12,835.03
/i ( "7 1
Deductions:
11 cu. yds. Excavation 1.25 13.75
39 cu. yds. Embankment 1.25 48.75
166 lin. ft. Remove Sandstone Curb 0.30 49.80
361 tons Asphaltic Concrete Binder Course 10.00 3,610.00
371 cu. yds. Concrete Leveling Course 24.50 9,089.50
370 lin. ft. Sandstone Curb to reset 1.80 666.00
5.9 sq. yds. 6" Mono. Conc. Driveway Pavement 4.6o 27.14
117 lin. ft. Saw joints to cut 1.10 128.70
300 sq. yds. Grass Sod 0.35 105.00
3 Manholes to adjust 20.00 60.00
1 Catch Basin to rebuild 40.00 4Q.00
TOTAL DEDUCTIONS ' $ 13,838.64
Additions:
419.2 lin. ft. Remove present Conc. Curb 0.25 104.80
317.3 lin. ft. Construct 7" x 18" Straight Conc. Curb 1.85 587.01
98.4 lin. ft. Construct 7" x 18" Radius Conc. Curb 2.00 196.80
3 Catch Basins to adjust 20.00 60.00
1 24" Side Inlet to construct 30.00 30.00
1 Monument to reset 25.00 25.00
TOTAL ADDITIONS 1,003.61
TOTAL NET DEDUCTIONS - - - -$ 12,835.03