Loading...
183248 .Vs• - • ` Council File No 48t Council File No. 183248— By 1 LT 'Itse costster So!vtpheenseasssgr gradtri >>.rfac'• limirius - CITY OF ST. PAUL Resolution Ratifying Assessment In the matter of the assessment of benefits, costs and expenses for grading and surfacing with bituminous material the alleys in Block 7, Cloverdale, from Frank St. to the north and south alley and from Magnolia Ave. to Jessamine Ave. Also constructing a sewer from a point 20 ft. west of Frank St. to the existing catch-basin in Frank St., under Preliminary Order 173Q6.5 , Intermediary Order 173590 , Final Order 17406,9 approved July 12 19____55. A public hearing having been had upon the assessment for the above improvement, and said assessment having been further considered by the Council, and having been considered finally satisfactory, be it therefore RESOLVED, That the said assessment be and the same is hereby in all respects ratified, and the same is hereby ordered to e submitted to the District Court of the County of Ramsey for confirmation. BE IT FLIRT R RESOLVED, That the said assessment be and it is hereby determined to be payable in equal installments. JUN 1191 Adopted by the Council 19 -J ± , City Clerk. ■ Approved 19 i wlir,.... Mayor. Form B. B. 18 File 13025 /\(... PUBLISHED L., — /-5 -. . 7 CITY OF ST. PAUL -8'-4-8'1248, 4 4 OFFICE OF THE COMMISSIONER OF FINANCE Report of Completion of Assessment May 14 19_53_ In the matter of the assessment of benefits, costs and expenses for grading and surfacing with bituminous material the alleys in Block 7, Cloverdale, from Frank St. to the north and south alley and from Magnolia Ave. to Jessamine Ave. Also constructing a sewer from a point 20 ft. west of Frank St. to the existing catch-basin in Frank St., under Preliminary Order 173065 , approved x.10, 1955 —_ Intermediary Order 173590 , approved June 14, 3.955 Final Order 174069 _, approved July 12, 1955 To the Council of the City of St. Paul: The Commissioner of Finance hereby reports to the Council the following as a statement of the ex- penditures necessarily incurred for and in connection with the making of the above improvement, viz: Cost of construction. $ 4,014.64 Engineering $ 373.53 Inspection fees $ 12.13 Postal cards. $ 1.62 Publications $_ 12.15 Court costs for confirmation $ 4.05 Total expenditures $ 4,418.12 Said Commissioner further reports that he has assessed and levied the total amount as above ascer- tained, to-wit: the sum of $ 4,418.12 upon each and every lot, part or parcel of land deemed benefited by the said improvement, and in the case of each lot, part or parcel of land in accordance with the benefits conferred thereon; that the said assessment has been completed, and that hereto attached, identified by the signature of the said Commissioner, and made a part hereof, is the said assessment as completed by him, and which is herewith submitted to the Council for such action thereon as may be considered proper. Commissioner of Finan (7y 2M 32-52 8